{"id":2380,"date":"2021-11-03T14:41:42","date_gmt":"2021-11-03T06:41:42","guid":{"rendered":"https:\/\/epcpmo.com\/?p=2380"},"modified":"2022-09-11T14:28:12","modified_gmt":"2022-09-11T06:28:12","slug":"early-property-management-risk-identification-and-prevention-guidelines","status":"publish","type":"post","link":"https:\/\/epcpmo.com\/en\/early-property-management-risk-identification-and-prevention-guidelines\/","title":{"rendered":"Early Property Management Risk Identification and Prevention Guidelines"},"content":{"rendered":"<p><a><strong>Early Property Management Risk Identification and Prevention Guidelines<\/strong><\/a><\/p>\n\n\n\n<p>The project investigates the risk phase<br><br><\/p>\n\n\n\n<p>Zhou border security situation research is not detailed;<\/p>\n\n\n\n<p>Peripheral consumption, the same (similar) business situation;<\/p>\n\n\n\n<p>Information on the mobile population and human resources;<\/p>\n\n\n\n<p>factors that affect the owner&#8217;s life;<\/p>\n\n\n\n<p>Project local policy research;<\/p>\n\n\n\n<p>Security management<\/p>\n\n\n\n<p>A falling object at high altitude<\/p>\n\n\n\n<p>steal<\/p>\n\n\n\n<p>Live fights<\/p>\n\n\n\n<p>Foreign forces affect the normal order<\/p>\n\n\n\n<p>On-site security precautions<\/p>\n\n\n\n<p>Electric shock hurts people<\/p>\n\n\n\n<p>Fire management<\/p>\n\n\n\n<p>The fire caused by the line<\/p>\n\n\n\n<p>The construction fire caused the fire<\/p>\n\n\n\n<p>The equipment room is leaking<\/p>\n\n\n\n<p>An open fire<\/p>\n\n\n\n<p>A fire caused by overload<\/p>\n\n\n\n<p>Fires in flammable and explosive materials<\/p>\n\n\n\n<p>Public environment<\/p>\n\n\n\n<p>Clean up the wasteland<\/p>\n\n\n\n<p>Geo-stone mirror treatment<\/p>\n\n\n\n<p>Danger zone tips to make<\/p>\n\n\n\n<p>Guide system production<\/p>\n\n\n\n<p>The preparatory phase of the project<\/p>\n\n\n\n<p>The establishment of management system documents<\/p>\n\n\n\n<p>Personnel training<\/p>\n\n\n\n<p>Supplier library establishment<\/p>\n\n\n\n<p>The signing of various types of outsourcing contracts<\/p>\n\n\n\n<p>Material preparation and supplementary procurement<\/p>\n\n\n\n<p>All kinds of major node preparation (e.g. opening, joining, etc.)<\/p>\n\n\n\n<p>Establishment of various types of archives (engineering files, daily records files, customer files, contract files, etc.)<\/p>\n\n\n\n<p>Contingency plans are built on drills<\/p>\n\n\n\n<p>Construction, installation phase<\/p>\n\n\n\n<p>There is no hidden engineering acceptance record<\/p>\n\n\n\n<p>There is no record of closed water testing for waterproofing works<\/p>\n\n\n\n<p>There are no construction records in the construction that do not match the drawings<\/p>\n\n\n\n<p>Record of safety hazard rectification found in construction<\/p>\n\n\n\n<p>I don&#8217;t know the performance of the device<\/p>\n\n\n\n<p>Do not understand the equipment maintenance points record<\/p>\n\n\n\n<p>Take over the acceptance phase<\/p>\n\n\n\n<p>No property rights information was transferred<\/p>\n\n\n\n<p>There is no transfer of engineering technical information or incomplete transfer<\/p>\n\n\n\n<p>No equipment was handed over to records, or the handover was incomplete<\/p>\n\n\n\n<p>There are no maintenance contracts of all kinds, and no written information<\/p>\n\n\n\n<p>There is no record of this experience<\/p>\n\n\n\n<p>There is no solution to the project legacy issues<\/p>\n\n\n\n<p>The corresponding customer information<\/p>\n\n\n\n<p>Plan the design risk, drawing review stage<\/p>\n\n\n\n<p>The water feature setting is not reasonable<\/p>\n\n\n\n<p>The selection of skit materials is not conducive to later maintenance;<\/p>\n\n\n\n<p>Property body details are not in place, affecting later use<\/p>\n\n\n\n<p>The setting of traffic flow and traffic route<\/p>\n\n\n\n<p>The reasonableness of parking spaces and supporting settings and whether they meet the requirements for use and expansion needs<\/p>\n\n\n\n<p>Intelligent engineering settings<\/p>\n\n\n\n<p>Whether the device room settings are reasonable or not, and whether the function of use can be satisfied<\/p>\n\n\n\n<p>Whether the configuration of the management room is reasonable<\/p>\n\n\n\n<p>Pool, landscape safety hazard tips, preventive measures<\/p>\n\n\n\n<p>The design rationality of rainwater, sewage and smoke removal system<\/p>","protected":false},"excerpt":{"rendered":"<p>Early Property Management Risk Identification and Preve [&hellip;]<\/p>","protected":false},"author":1,"featured_media":9210,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[63,67],"tags":[],"class_list":["post-2380","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-property-management"],"_links":{"self":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2380","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/comments?post=2380"}],"version-history":[{"count":1,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2380\/revisions"}],"predecessor-version":[{"id":11158,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2380\/revisions\/11158"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media\/9210"}],"wp:attachment":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media?parent=2380"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/categories?post=2380"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/tags?post=2380"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}