{"id":2383,"date":"2021-11-03T14:42:47","date_gmt":"2021-11-03T06:42:47","guid":{"rendered":"https:\/\/epcpmo.com\/?p=2383"},"modified":"2022-09-11T14:27:48","modified_gmt":"2022-09-11T06:27:48","slug":"engineering-maintenance-department-a-full-set-of-wall-system","status":"publish","type":"post","link":"https:\/\/epcpmo.com\/en\/engineering-maintenance-department-a-full-set-of-wall-system\/","title":{"rendered":"Engineering maintenance department a full set of wall system"},"content":{"rendered":"<p><strong>Engineering maintenance department a full set of wall system<\/strong><\/p>\n\n\n\n<p>(38 files).<\/p>\n\n\n\n<p>1. Facility equipment management class<\/p>\n\n\n\n<p>1.1 Integrated control procedures for facilities and equipment<\/p>\n\n\n\n<p>1.2 Facility equipment maintenance operation control procedures<\/p>\n\n\n\n<p>1.3 Daily inspection system for facilities and equipment<\/p>\n\n\n\n<p>1.4 Service worker safety operating specifications<\/p>\n\n\n\n<p>1.5 Service tool management procedures<\/p>\n\n\n\n<p>1.6 Maintenance parts management procedures<\/p>\n\n\n\n<p>1.7 Monitoring and measurement device control procedures<\/p>\n\n\n\n<p>1.8 Monitoring and measuring device calibration specifications<\/p>\n\n\n\n<p>2. Facility equipment asset management<\/p>\n\n\n\n<p>2.1 Facility equipment file management system<\/p>\n\n\n\n<p>2.2 Equipment acquisition procedures<\/p>\n\n\n\n<p>2.3 Equipment acceptance, installation and handover procedures<\/p>\n\n\n\n<p>2.4 Equipment acceptance process<\/p>\n\n\n\n<p>2.5 Equipment scrapping procedures<\/p>\n\n\n\n<p>3. Maintenance management<\/p>\n\n\n\n<p>3.1 Daily reporting procedures<\/p>\n\n\n\n<p>3.2 Household indoor installation and maintenance procedures<\/p>\n\n\n\n<p>3.3 Management procedures for overhauling common facilities<\/p>\n\n\n\n<p>3.4 On-site repair service procedures<\/p>\n\n\n\n<p>3.5 Equipment update and overhaul management procedures<\/p>\n\n\n\n<p>3.6 Equipment Incident Management Procedures<\/p>\n\n\n\n<p>4. Maintenance quality standards<\/p>\n\n\n\n<p>4.1 Quality standards for service and drainage pipes<\/p>\n\n\n\n<p>4.2 Aluminium doors and windows maintenance quality standards<\/p>\n\n\n\n<p>4.3 Indoor appliances, lighting maintenance quality standards<\/p>\n\n\n\n<p>4.4 Quality standards for civil engineering maintenance<\/p>\n\n\n\n<p>5. Elevator management<\/p>\n\n\n\n<p>5.1 Elevator room management system<\/p>\n\n\n\n<p>5.2 Elevator operating procedures<\/p>\n\n\n\n<p>5.3 Operating procedures for escalators<\/p>\n\n\n\n<p>5.4 Elevator maintenance operating procedures<\/p>\n\n\n\n<p>5.5 Elevator fault repair procedures<\/p>\n\n\n\n<p>5.6 Elevator emergency procedures<\/p>\n\n\n\n<p>5.7 Elevator trapped person handling procedures<\/p>\n\n\n\n<p>6. Water supply and drainage system<\/p>\n\n\n\n<p>6.1 Operating procedures for water supply and drainage systems<\/p>\n\n\n\n<p>6.2 Pump room management system<\/p>\n\n\n\n<p>6.3 Service and maintenance procedures for water supply and drainage systems<\/p>\n\n\n\n<p>6.4 Pump maintenance procedures<\/p>\n\n\n\n<p>6.5 Pipe dredger operating specifications<\/p>\n\n\n\n<p>6.6 Pool cleaning practices<\/p>\n\n\n\n<p>6.7 Pool water tank management regulations<\/p>\n\n\n\n<p>6.8 Water and water supply management system<\/p>","protected":false},"excerpt":{"rendered":"<p>Engineering maintenance department a full set of wall s [&hellip;]<\/p>","protected":false},"author":1,"featured_media":9211,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[63,67],"tags":[],"class_list":["post-2383","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-property-management"],"_links":{"self":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2383","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/comments?post=2383"}],"version-history":[{"count":1,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2383\/revisions"}],"predecessor-version":[{"id":11157,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2383\/revisions\/11157"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media\/9211"}],"wp:attachment":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media?parent=2383"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/categories?post=2383"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/tags?post=2383"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}