{"id":2470,"date":"2021-11-03T15:22:19","date_gmt":"2021-11-03T07:22:19","guid":{"rendered":"https:\/\/epcpmo.com\/?p=2470"},"modified":"2022-09-11T14:11:00","modified_gmt":"2022-09-11T06:11:00","slug":"tender-document-for-the-standard-of-integrated-property-services-at-the-high-speed-railway-station2021-standard-version","status":"publish","type":"post","link":"https:\/\/epcpmo.com\/en\/tender-document-for-the-standard-of-integrated-property-services-at-the-high-speed-railway-station2021-standard-version\/","title":{"rendered":"Tender document for the standard of integrated property services at the high-speed railway station(2021 standard version)."},"content":{"rendered":"<p><a><strong>Tender documents for the standard of integrated property services at high-speed railway stations<\/strong><\/a><\/p>\n\n\n\n<p><strong>Listings<\/strong><\/p>\n\n\n\n<p>Chapter 1&nbsp; Project Background and Needs Analysis<\/p>\n\n\n\n<p>Section 1 Background of China&#8217;s high-speed rail development<\/p>\n\n\n\n<p>Section II Overview of&nbsp; the high-speed rail and high-speed rail economy<\/p>\n\n\n\n<p>Section III The adverse effects of&nbsp; high-speed rail on urban economic development<\/p>\n\n\n\n<p>Section 4&nbsp; Project Requirements Analysis<\/p>\n\n\n\n<p>Chapter II&nbsp; The overall service concept and planning of the project<\/p>\n\n\n\n<p>Section 1&nbsp; Project Overview<\/p>\n\n\n\n<p>Section II&nbsp; Regulations for Management Operations<\/p>\n\n\n\n<p>Section III Comprehensive management of the difficulties and measures to solve the problem<\/p>\n\n\n\n<p>Chapter III&nbsp; Project Organizational Structure and Staffing<\/p>\n\n\n\n<p>Section 1&nbsp; Staffing of managers<\/p>\n\n\n\n<p>Section II&nbsp; Training of Property Personnel<\/p>\n\n\n\n<p>Chapter Four&nbsp; Material and Equipment Plan<\/p>\n\n\n\n<p>Section I&nbsp; Basic Principles of Material equipment<\/p>\n\n\n\n<p>Section II&nbsp; The situation of the management machinery and equipment to be invested in the project<\/p>\n\n\n\n<p>Section III&nbsp; Management of machinery and equipment<\/p>\n\n\n\n<p>Chapter 5&nbsp; Project Management Rules and Regulations<\/p>\n\n\n\n<p>Section 1&nbsp; Personnel management system<\/p>\n\n\n\n<p>Section II&nbsp; Administrative System<\/p>\n\n\n\n<p>Section III&nbsp; Financial Management System<\/p>\n\n\n\n<p>Chapter 6&nbsp; Property Management Program<\/p>\n\n\n\n<p>Section 1&nbsp; Property Management Indicators<\/p>\n\n\n\n<p>Section II&nbsp; Overall planning of the property<\/p>\n\n\n\n<p>Section III&nbsp; Management models, mechanisms and regulatory mechanisms<\/p>\n\n\n\n<p>Section IV&nbsp; Security Services Content<\/p>\n\n\n\n<p>Section V&nbsp; Parking Management<\/p>\n\n\n\n<p>Section 6 Elevator, public equipment maintenance work<\/p>\n\n\n\n<p>Chapter VII&nbsp; Implementation Plan for Municipal Management<\/p>\n\n\n\n<p>Section 1&nbsp; Maintenance and maintenance of public facilities equipment<\/p>\n\n\n\n<p>Section II&nbsp; Road Care Measures<\/p>\n\n\n\n<p>Section III&nbsp; Pipeline Desilting Measures<\/p>\n\n\n\n<p>Section IV&nbsp; Road Lamp Tube Implementation Program<\/p>\n\n\n\n<p>Chapter 8&nbsp; Sanitation Cleaning Management Implementation Program<\/p>\n\n\n\n<p>Section 1&nbsp; Sanitation cleaning measures<\/p>\n\n\n\n<p>Section II&nbsp; Training Management System<\/p>\n\n\n\n<p>Section III &nbsp;Quality Supervision and Control<\/p>\n\n\n\n<p>Section IV&nbsp; Public toilet management and cleaning safeguards<\/p>\n\n\n\n<p>Chapter 9&nbsp; Greening Management Implementation Program<\/p>\n\n\n\n<p>Section 1&nbsp; Road Tree and Landscape Tree Management Program<\/p>\n\n\n\n<p>Section II&nbsp; Joe Shrub Tube Measures<\/p>\n\n\n\n<p>Section III&nbsp; Measures for the management of plants<\/p>\n\n\n\n<p>Section IV&nbsp; The management measures of the lawn<\/p>\n\n\n\n<p>Section 5&nbsp; Flower beds, flower belts and straw management measures<\/p>\n\n\n\n<p>Section VI&nbsp; Pest control and other technical measures<\/p>\n\n\n\n<p>Chapter 10&nbsp; Civilized Operation Management System and Measures<\/p>\n\n\n\n<p>Section 1&nbsp; Civilized Operating Technology<\/p>\n\n\n\n<p>Section II&nbsp; Construction process and technical measures in the process of management and maintenance<\/p>\n\n\n\n<p>Chapter 11&nbsp; Quality Assurance Program<\/p>\n\n\n\n<p>Section I&nbsp; Measures for the Guarantee of Civilized Operations<\/p>\n\n\n\n<p>Section II&nbsp; Quality Control Management Measures<\/p>\n\n\n\n<p>Section III&nbsp; Security management systems and assurance measures<\/p>\n\n\n\n<p>Chapter 12&nbsp; Emergency Plan<\/p>\n\n\n\n<p>Section I&nbsp; General Measures for Emergency Responses<\/p>\n\n\n\n<p>Section II&nbsp; Emergency and protective measures<\/p>\n\n\n\n<p>Section III&nbsp; Other contingency plans<\/p>\n\n\n\n<p>Chapter 13&nbsp; Work Programme for Epidemic Prevention and Control<\/p>\n\n\n\n<p>Section 1&nbsp; Epidemic Prevention and Control System<\/p>\n\n\n\n<p>Section II&nbsp; Epidemic Prevention and Control Program<\/p>\n\n\n\n<p>Section III&nbsp; Supervise the implementation of epidemic prevention and control<\/p>\n\n\n\n<p>Chapter 14&nbsp; Archives Management Program<\/p>\n\n\n\n<p>Section 1&nbsp; Archives managers and responsibilities<\/p>\n\n\n\n<p>Section II&nbsp; Archive Management Process<\/p>\n\n\n\n<p>Section III&nbsp; Archives Management System<\/p>","protected":false},"excerpt":{"rendered":"<p>Tender documents for the standard of integrated propert [&hellip;]<\/p>","protected":false},"author":1,"featured_media":9329,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[63,67],"tags":[],"class_list":["post-2470","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-property-management"],"_links":{"self":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2470","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/comments?post=2470"}],"version-history":[{"count":1,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2470\/revisions"}],"predecessor-version":[{"id":11129,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2470\/revisions\/11129"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media\/9329"}],"wp:attachment":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media?parent=2470"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/categories?post=2470"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/tags?post=2470"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}