{"id":2634,"date":"2021-11-03T17:38:40","date_gmt":"2021-11-03T09:38:40","guid":{"rendered":"https:\/\/epcpmo.com\/?p=2634"},"modified":"2022-09-11T15:28:01","modified_gmt":"2022-09-11T07:28:01","slug":"do-a-good-job-of-quality-control-grasp-the-key-points-of-quality-management-in-order-to-achieve-quality-goals3-2","status":"publish","type":"post","link":"https:\/\/epcpmo.com\/en\/do-a-good-job-of-quality-control-grasp-the-key-points-of-quality-management-in-order-to-achieve-quality-goals3-2\/","title":{"rendered":"Do a good job of quality control, grasp the key points of quality management, in order to achieve quality goals(4)"},"content":{"rendered":"<p><a id=\"post-2634-img-content\"><\/a><a id=\"post-2634-page-content\"><\/a><a id=\"post-2634-js_article\"><\/a><a id=\"post-2634-js_content\"><\/a>\n  \n<\/p>\n\n\n\n<p>\n  The use of test paving for flooring works can reduce the color difference problem, the threshold stone is higher than the floor 1-2mm. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1055\" height=\"407\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85.png\" alt=\"\" class=\"wp-image-2637\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85.png 1055w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85-300x116.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85-1024x395.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85-768x296.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85-600x231.png 600w\" sizes=\"(max-width: 1055px) 100vw, 1055px\" \/><\/figure>\n\n\n\n<p><strong>2.9<\/strong>\n<\/p>\n\n\n\n<p><strong>other<\/strong>\n<\/p>\n\n\n\n<p>\n  The entry door weight is larger, should be required on both sides for the shear wall or make steel frame grass, to ensure that the door cover base plate installation is solid. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"786\" height=\"526\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86.png\" alt=\"\" class=\"wp-image-2638\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86.png 786w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86-300x201.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86-768x514.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86-600x402.png 600w\" sizes=\"(max-width: 786px) 100vw, 786px\" \/><\/figure>\n\n\n\n<p>\n  The process is reversed, and the construction organization management problem.\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"979\" height=\"463\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-87.png\" alt=\"\" class=\"wp-image-2639\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-87.png 979w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-87-300x142.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-87-768x363.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-87-600x284.png 600w\" sizes=\"(max-width: 979px) 100vw, 979px\" \/><\/figure>\n\n\n\n<p>\n  The process is reversed, the ground stone rough grinding is not completed, the wood products have been installed.\n<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-88.png\" alt=\"\" class=\"wp-image-2640\" width=\"1000\" height=\"527\"\/><\/figure>\n\n\n\n<p>\n  Door opening sealing shall not use splint-type materials as a substrate, easy to crack.\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"906\" height=\"560\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89.png\" alt=\"\" class=\"wp-image-2641\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89.png 906w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89-300x185.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89-768x475.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89-600x371.png 600w\" sizes=\"(max-width: 906px) 100vw, 906px\" \/><\/figure>\n\n\n\n<p>\n  Air conditioning air vents should be sealed strictly to prevent light leakage, try not to take the bathtub stone pressing practice, and pay attention to the inside high and low.\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"379\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90.png\" alt=\"\" class=\"wp-image-2642\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90-300x105.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90-1024x359.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90-768x270.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90-600x211.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  When the construction of a dry wall with stone to the top is completed, the installation of the top plasterboard can be carried out only after the stone dry hanging is completed, and the process shall not be reversed, which may easily cause dangerous sources. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"759\" height=\"520\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-91.png\" alt=\"\" class=\"wp-image-2643\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-91.png 759w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-91-300x206.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-91-600x411.png 600w\" sizes=\"(max-width: 759px) 100vw, 759px\" \/><\/figure>\n\n\n\n<p>\n  Residential indoor stone must be steel structure dry hanging fixed.\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"392\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92.png\" alt=\"\" class=\"wp-image-2644\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92-300x109.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92-1024x372.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92-768x279.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92-600x218.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Interior decoration of stone door covers, such as upside-down suspension board, the grass-roots level shall not use multi-layer plate bonding process, must be dry hanging construction. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"974\" height=\"540\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-93.png\" alt=\"\" class=\"wp-image-2645\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-93.png 974w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-93-300x166.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-93-768x426.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-93-600x333.png 600w\" sizes=\"(max-width: 974px) 100vw, 974px\" \/><\/figure>\n\n\n\n<p>\n  Residential indoor stone dry pendants shall not use flat plug-ins,     T-type parts, stainless steel butterfly parts;   \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1016\" height=\"659\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-94.png\" alt=\"\" class=\"wp-image-2646\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-94.png 1016w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-94-300x195.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-94-768x498.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-94-600x389.png 600w\" sizes=\"(max-width: 1016px) 100vw, 1016px\" \/><\/figure>\n\n\n\n<p>\n  The installation of gypsum line should be like gypsum board installation, the use of self-tapping screws fixed, and should do a good job of rust work, not to use nail fixing. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"969\" height=\"371\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95.png\" alt=\"\" class=\"wp-image-2647\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95.png 969w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95-300x115.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95-768x294.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95-600x230.png 600w\" sizes=\"(max-width: 969px) 100vw, 969px\" \/><\/figure>\n\n\n\n<p>\n  Conditional projects after the completion of rough grinding of stone, the surface construction before scraping 2 times resin, can effectively extend the time to prevent stone pan-alkali. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"774\" height=\"477\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96.png\" alt=\"\" class=\"wp-image-2648\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96.png 774w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96-300x185.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96-768x473.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96-600x370.png 600w\" sizes=\"(max-width: 774px) 100vw, 774px\" \/><\/figure>\n\n\n\n<p><strong><em>03<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>Common quality common diseases and prevention and treatment<\/strong>\n<\/p>\n\n\n\n<p><strong>3.1<\/strong>\n<\/p>\n\n\n\n<p><strong>Common quality common diseases and prevention and treatment<\/strong>\n<\/p>\n\n\n\n<p><strong>Construction process:<\/strong>\n<\/p>\n\n\n\n<p>\n  1, put the line: with the laser line caster to release the partition wall line;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"610\" height=\"388\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-97.png\" alt=\"\" class=\"wp-image-2649\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-97.png 610w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-97-300x191.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-97-600x382.png 600w\" sizes=\"(max-width: 610px) 100vw, 610px\" \/><\/figure>\n\n\n\n<p>\n  2, the ground support mold (rust and moisture-proof effect);\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"610\" height=\"388\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-98.png\" alt=\"\" class=\"wp-image-2650\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-98.png 610w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-98-300x191.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-98-600x382.png 600w\" sizes=\"(max-width: 610px) 100vw, 610px\" \/><\/figure>\n\n\n\n<p>\n  3, pouring concrete;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"648\" height=\"411\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-99.png\" alt=\"\" class=\"wp-image-2651\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-99.png 648w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-99-300x190.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-99-600x381.png 600w\" sizes=\"(max-width: 648px) 100vw, 648px\" \/><\/figure>\n\n\n\n<p>\n  4, maintenance, mold removal;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"662\" height=\"410\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-100.png\" alt=\"\" class=\"wp-image-2652\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-100.png 662w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-100-300x186.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-100-600x372.png 600w\" sizes=\"(max-width: 662px) 100vw, 662px\" \/><\/figure>\n\n\n\n<p>\n  5, the installation of heaven and earth keel: with a nail gun fixed tiantian keel to the earth ridge and the original structure;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"649\" height=\"435\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-101.png\" alt=\"\" class=\"wp-image-2653\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-101.png 649w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-101-300x201.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-101-600x402.png 600w\" sizes=\"(max-width: 649px) 100vw, 649px\" \/><\/figure>\n\n\n\n<p>\n  6, install vertical keel and wear heart keel;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"661\" height=\"435\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-102.png\" alt=\"\" class=\"wp-image-2654\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-102.png 661w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-102-300x197.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-102-600x395.png 600w\" sizes=\"(max-width: 661px) 100vw, 661px\" \/><\/figure>\n\n\n\n<p>\n  7, sealing one side of the gypsum board: in the plaster board, with pistol drilling, self-tapping screws will be gypsum board fixed on the wall keel and with a ruler to check the verticality and flatness of the partition wall;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"584\" height=\"376\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-103.png\" alt=\"\" class=\"wp-image-2655\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-103.png 584w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-103-300x193.png 300w\" sizes=\"(max-width: 584px) 100vw, 584px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"585\" height=\"376\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-104.png\" alt=\"\" class=\"wp-image-2656\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-104.png 585w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-104-300x193.png 300w\" sizes=\"(max-width: 585px) 100vw, 585px\" \/><\/figure>\n\n\n\n<p>\n  8, the partition wall installed wire box and through the line;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"583\" height=\"405\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-105.png\" alt=\"\" class=\"wp-image-2657\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-105.png 583w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-105-300x208.png 300w\" sizes=\"(max-width: 583px) 100vw, 583px\" \/><\/figure>\n\n\n\n<p>\n  The partition wall is filled with rock wool (to be full and dense);\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"597\" height=\"406\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-106.png\" alt=\"\" class=\"wp-image-2658\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-106.png 597w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-106-300x204.png 300w\" sizes=\"(max-width: 597px) 100vw, 597px\" \/><\/figure>\n\n\n\n<p>\n  Seal the plasterboard on both sides, the next step is the oilman&#8217;s work;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"585\" height=\"376\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-107.png\" alt=\"\" class=\"wp-image-2659\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-107.png 585w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-107-300x193.png 300w\" sizes=\"(max-width: 585px) 100vw, 585px\" \/><\/figure>\n\n\n\n<p>\n  Check that the barrier level, verticality and self-tapping screw spacing to meet the specification requirements, and paste the qualified label.\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"649\" height=\"410\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-108.png\" alt=\"\" class=\"wp-image-2660\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-108.png 649w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-108-300x190.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-108-600x379.png 600w\" sizes=\"(max-width: 649px) 100vw, 649px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"686\" height=\"435\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-109.png\" alt=\"\" class=\"wp-image-2661\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-109.png 686w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-109-300x190.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-109-600x380.png 600w\" sizes=\"(max-width: 686px) 100vw, 686px\" \/><\/figure>\n\n\n\n<p><strong>Construction quality general disease and prevention measures<\/strong>\n<\/p>\n\n\n\n<p>\n  1, wall keel and wall, cylinder end can not be flat. Can be recessed or protruding, in the field when the line can be timely design adjustments. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"517\" height=\"537\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-110.png\" alt=\"\" class=\"wp-image-2662\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-110.png 517w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-110-289x300.png 289w\" sizes=\"(max-width: 517px) 100vw, 517px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"557\" height=\"537\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-111.png\" alt=\"\" class=\"wp-image-2663\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-111.png 557w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-111-300x289.png 300w\" sizes=\"(max-width: 557px) 100vw, 557px\" \/><\/figure>\n\n\n\n<p>\n  2, door holes, window holes around the gypsum plate sealing plate seams must be on the center line, so as not to create cracks in the future. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"645\" height=\"686\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-112.png\" alt=\"\" class=\"wp-image-2664\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-112.png 645w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-112-282x300.png 282w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-112-600x638.png 600w\" sizes=\"(max-width: 645px) 100vw, 645px\" \/><\/figure>\n\n\n\n<p>\n  3, the lower mouth ofthe wall keel is stone or wooden kick board, in the sealing board must be left this space. Wood kick 9 cm board grass care anti-corrosion, fire treatment. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"589\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-113.png\" alt=\"\" class=\"wp-image-2665\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-113.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-113-300x164.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-113-1024x558.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-113-768x419.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-113-600x327.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  4, the ground did not do the ground dragon and flat on the installation of light steel keel partition wall system, concrete flattened after keel rust. \n<\/p>\n\n\n\n<p>\n  5, gypsum board did not and find the flat layer empty gap, resulting in plaster board mold. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1032\" height=\"380\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-114.png\" alt=\"\" class=\"wp-image-2666\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-114.png 1032w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-114-300x110.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-114-1024x377.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-114-768x283.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-114-600x221.png 600w\" sizes=\"(max-width: 1032px) 100vw, 1032px\" \/><\/figure>\n\n\n\n<p><strong>3.2<\/strong>\n<\/p>\n\n\n\n<p><strong>Gypsum board ceiling construction process and prevention measures<\/strong>\n<\/p>\n\n\n\n<p><strong>Construction process<\/strong>\n<\/p>\n\n\n\n<p>\n  The ceiling is finished with the face line, and the installation equipment is ejected to complete the face line;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"623\" height=\"458\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-115.png\" alt=\"\" class=\"wp-image-2667\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-115.png 623w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-115-300x221.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-115-600x441.png 600w\" sizes=\"(max-width: 623px) 100vw, 623px\" \/><\/figure>\n\n\n\n<p>\n  The boom length is installed at the cross, the length of theboom is: \u03c6 8 boom when &gt; &gt;1m;   \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"648\" height=\"458\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-116.png\" alt=\"\" class=\"wp-image-2668\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-116.png 648w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-116-300x212.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-116-600x424.png 600w\" sizes=\"(max-width: 648px) 100vw, 648px\" \/><\/figure>\n\n\n\n<p>\n  Installation of the main keel, sub-keel (main keel spacing:900-1000mm;  secondary keel spacing:300-600 mm);\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"710\" height=\"455\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-117.png\" alt=\"\" class=\"wp-image-2669\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-117.png 710w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-117-300x192.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-117-600x385.png 600w\" sizes=\"(max-width: 710px) 100vw, 710px\" \/><\/figure>\n\n\n\n<p>\n  Seal the first layer and surface plasterboard;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"725\" height=\"435\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-118.png\" alt=\"\" class=\"wp-image-2670\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-118.png 725w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-118-300x180.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-118-600x360.png 600w\" sizes=\"(max-width: 725px) 100vw, 725px\" \/><\/figure>\n\n\n\n<p><strong>Construction quality general disease and prevention measures<\/strong>\n<\/p>\n\n\n\n<p>\n  1, after the start of the project should be in cooperation with other relevant units to actively draw a comprehensive ceiling map, as the top lamp hole, spray, air vents, manholes and other lines of the basis. By us to draw a comprehensive top surface map to obtain a visa to Party A. \n<\/p>\n\n\n\n<p>\n  2, in the installation equipment under the lighting fixtures and horns, etc. should pay attention to the size of the embedded depth, in advance adjustment or change the design. \n<\/p>\n\n\n\n<p>\n  3, before the installation of keel, should be in accordance with the design requirements of the room net height, hole height and ceiling pipe, equipment and the height of its bracket for handover inspection. Prevents involvement in the installation of lag operations during cross-construction.  (The arrangement of the main keel should pay attention to the lamp holes, spray, air vents, manholes). \n<\/p>\n\n\n\n<p>\n  4, the processing and installation of the boom:\n<\/p>\n\n\n\n<p>\n  Booms are generally madeof \u03c66 to  \u03c68 hot galvanized finished threaded rods. Large area or ceiling boom spacing is \u22641000mm,the general ceiling ceiling spacing is \u22641200mm. (The maximum length of the boom,  \u03c66 booms are not greater than 1m,  \u03c68 booms are not greater than 1.5m).\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"813\" height=\"330\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-119.png\" alt=\"\" class=\"wp-image-2671\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-119.png 813w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-119-300x122.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-119-768x312.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-119-600x244.png 600w\" sizes=\"(max-width: 813px) 100vw, 813px\" \/><\/figure>\n\n\n\n<p>\n  5, gypsum board end surface and beam body and wall end can not be flat, should be in the early line as early as possible to find and make design adjustments. (If the flat interview diagram (1) practice, otherwise see figure (2) practice).\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"658\" height=\"638\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-120.png\" alt=\"\" class=\"wp-image-2672\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-120.png 658w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-120-300x291.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-120-600x582.png 600w\" sizes=\"(max-width: 658px) 100vw, 658px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"662\" height=\"580\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-121.png\" alt=\"\" class=\"wp-image-2673\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-121.png 662w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-121-300x263.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-121-600x526.png 600w\" sizes=\"(max-width: 662px) 100vw, 662px\" \/><\/figure>\n\n\n\n<p>\n  6, ceiling gypsum board straight length of more than 15 meters of all kinds of walkways or large area ceiling corner should be reserved for telescopic seams. The telescopic seams should be added to each side of the construction with two separate main keel and the para-keel must be all disconnected. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"528\" height=\"611\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-122.png\" alt=\"\" class=\"wp-image-2674\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-122.png 528w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-122-259x300.png 259w\" sizes=\"(max-width: 528px) 100vw, 528px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"537\" height=\"604\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-123.png\" alt=\"\" class=\"wp-image-2675\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-123.png 537w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-123-267x300.png 267w\" sizes=\"(max-width: 537px) 100vw, 537px\" \/><\/figure>\n\n\n\n<p>\n  7, gypsum board seal, plate seam must be &#8220;V&#8221; shaped mouth, pre-planed before the board; \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"707\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124.png\" alt=\"\" class=\"wp-image-2676\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124-300x196.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124-1024x670.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124-768x503.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124-600x393.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"512\" height=\"447\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-125.png\" alt=\"\" class=\"wp-image-2677\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-125.png 512w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-125-300x262.png 300w\" sizes=\"(max-width: 512px) 100vw, 512px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"686\" height=\"311\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-126.png\" alt=\"\" class=\"wp-image-2678\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-126.png 686w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-126-300x136.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-126-600x272.png 600w\" sizes=\"(max-width: 686px) 100vw, 686px\" \/><\/figure>\n\n\n\n<p>\n  8, as a stacking or flipping base of the carpentry board can be used &#8220;L&#8221; type.  The &#8220;L&#8221; bottom is connected to the sub-keel to ensure straightness. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"534\" height=\"536\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127.png\" alt=\"\" class=\"wp-image-2679\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127.png 534w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127-300x300.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127-150x150.png 150w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127-100x100.png 100w\" sizes=\"(max-width: 534px) 100vw, 534px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"479\" height=\"536\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-128.png\" alt=\"\" class=\"wp-image-2680\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-128.png 479w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-128-268x300.png 268w\" sizes=\"(max-width: 479px) 100vw, 479px\" \/><\/figure>\n\n\n\n<p>\n  9, when the boom and equipment meet should be adjusted and added boom, and not with the equipment to share the boom,  ceiling should not be in contact with the windpipe equipment. If the equipment or duct is too large to add a boom, increase the production of steel frame over the bridge, cross the bridge horizontal steel frame must not be close to the duct equipment, at least 20mm gap should be reserved.  Avoid causing the ceiling co-seismic cracking during late set-up operation. \n<\/p>\n\n\n\n<p>\n  10,when the length of the boom is greater than 1.5 meters should be set up reverse support, common practice with keel fixed to the floor and 45 degrees with the ceiling main bone dragon anchoring. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"589\" height=\"456\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-129.png\" alt=\"\" class=\"wp-image-2681\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-129.png 589w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-129-300x232.png 300w\" sizes=\"(max-width: 589px) 100vw, 589px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"491\" height=\"456\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-130.png\" alt=\"\" class=\"wp-image-2682\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-130.png 491w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-130-300x279.png 300w\" sizes=\"(max-width: 491px) 100vw, 491px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>The use of test paving for flooring works can reduce th [&hellip;]<\/p>","protected":false},"author":1,"featured_media":2656,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[63,196,269,256,276],"tags":[],"class_list":["post-2634","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-quality-control","category-269","category-256","category-276"],"_links":{"self":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2634","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/comments?post=2634"}],"version-history":[{"count":1,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2634\/revisions"}],"predecessor-version":[{"id":11201,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/2634\/revisions\/11201"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media\/2656"}],"wp:attachment":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media?parent=2634"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/categories?post=2634"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/tags?post=2634"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}