{"id":3006,"date":"2021-11-04T14:45:00","date_gmt":"2021-11-04T06:45:00","guid":{"rendered":"https:\/\/epcpmo.com\/?p=3006"},"modified":"2021-11-04T14:45:02","modified_gmt":"2021-11-04T06:45:02","slug":"whole-process-control-of-decoration-project","status":"publish","type":"post","link":"https:\/\/epcpmo.com\/en\/whole-process-control-of-decoration-project\/","title":{"rendered":"Whole process control of decoration project"},"content":{"rendered":"<p><a id=\"post-3006-img-content\"><\/a><a id=\"post-3006-page-content\"><\/a><a id=\"post-3006-js_article\"><\/a><strong>Construction management, management core, decoration construction 0-100 whole process control system<\/strong>\n<\/p>\n\n\n\n<p><a id=\"post-3006-js_content\"><\/a><strong>How does an excellent project manager develop a division of work, plan to review and operate ideas to ensure that the construction site budget, materials, construction, deepening, quality inspection, safety, and other 7<\/strong> <strong>positions<\/strong> <strong>can do their jobs, reasonable staffing, the formation of regional management model? <\/strong> <\/p>\n\n\n\n<p><strong>Don&#8217;t worry, the following detailed (juggernaut<\/strong>) standardized construction planning &#8220;0-100&#8221; whole process guidance worklist, can help you, specifically to &#8220;material  work&#8221;, &#8220;deepening work&#8221;,&#8221; Project  management, project progress <strong>control,<\/strong>   <strong>quality<\/strong> <strong>control,<\/strong> <strong>several points to expand:<\/strong> <\/p>\n\n\n\n<p><strong><em>01<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>The preparatory phase for the start of construction<\/strong>\n<\/p>\n\n\n\n<p>   Before the project enters the market to start, the company is in charge of the leading organization to start four exchanges and form the bottom minutes. <\/p>\n\n\n\n<p><strong>1.1<\/strong>\n<\/p>\n\n\n\n<p><strong>Start the delivery of the bottom<\/strong>\n<\/p>\n\n\n\n<p><strong>Four cross-ends<\/strong>\n<\/p>\n\n\n\n<p><strong>(Design, marketing, tender, contract)<\/strong>\n  <br>\n<\/p>\n\n\n\n<p>\n  Identify 10 days,30 days after entry The division of work that the project department must complete.  \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"716\" height=\"216\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-318.png\" alt=\"\" class=\"wp-image-3008\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-318.png 716w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-318-300x91.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-318-600x181.png 600w\" sizes=\"(max-width: 716px) 100vw, 716px\" \/><\/figure>\n\n\n\n<p>\n  Project Department to develop quality, management, duration goals, team goals, and form a written document, implemented into the project management planning. \n<\/p>\n\n\n\n<p><strong>1.2<\/strong>\n<\/p>\n\n\n\n<p><strong>Set goals<\/strong>\n<\/p>\n\n\n\n<p><strong>Quality objectives<\/strong>\n<\/p>\n\n\n\n<p><strong>1, the company&#8217;s goal:<\/strong>\n  <br>\n<\/p>\n\n\n\n<p>\n  (1) Establish a strategic partnership with an owner\n<\/p>\n\n\n\n<p>\n  (2) to make the company&#8217;s fine decoration model room project\n<\/p>\n\n\n\n<p><strong>2, project heading:<\/strong>\n<\/p>\n\n\n\n<p>\n  Internal inspection of more than 91 points\n<\/p>\n\n\n\n<p><strong>3, team construction objectives:<\/strong>\n<\/p>\n\n\n\n<p>\n  The quality of stone and wood finishes shall not be lower than the construction process and closing quality standards of a certain project.  \n<\/p>\n\n\n\n<p><strong>Business objectives<\/strong>\n<\/p>\n\n\n\n<p><strong>1, contract control with the owner<\/strong>\n<\/p>\n\n\n\n<p><strong>2, team contract<\/strong> <strong>signed<\/strong>\n<\/p>\n\n\n\n<p><strong>3, materials manufacturer contract<\/strong>\n<\/p>\n\n\n\n<p><strong>4, deepen the design<\/strong>\n<\/p>\n\n\n\n<p><strong><em>02<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>Grass-roots construction phase<\/strong>\n<\/p>\n\n\n\n<p>   Today we talk about the product, it is no longer the Internet circle product manager&#8217;s hot word, the meaning of the product has become more broad, <strong>in the field of decoration there are also several<\/strong> special product managers in the decorative control process, production module  &#8220;productization&#8221;,  that in the<strong> final analysis, What is a product-based decoration? <\/strong> <\/p>\n\n\n\n<p><strong>2.1<\/strong>\n<\/p>\n\n\n\n<p><strong>Product planning<\/strong>\n<\/p>\n\n\n\n<p>\n  Productization refers to the decomposition of the various components of the project into easy-to-process or uniform specifications of fixed parts (parts are products), each component through distribution, assembly, quality inspection, packaging to form a complete product construction process. <strong>Productization engineering refers to the project integrated by mass production and processing means. <\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"714\" height=\"269\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-319.png\" alt=\"\" class=\"wp-image-3009\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-319.png 714w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-319-300x113.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-319-600x226.png 600w\" sizes=\"(max-width: 714px) 100vw, 714px\" \/><\/figure>\n\n\n\n<p><strong>Simply put, it is in the process to emphasize the production mode, and modular standard parts to assemble products, modular assembly to form a decorative product.<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"1072\" height=\"636\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-68.jpeg\" alt=\"\" class=\"wp-image-3010\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-68.jpeg 1072w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-68-300x178.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-68-1024x608.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-68-768x456.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-68-600x356.jpeg 600w\" sizes=\"(max-width: 1072px) 100vw, 1072px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"673\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-69.jpeg\" alt=\"\" class=\"wp-image-3011\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-69.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-69-300x187.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-69-1024x638.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-69-768x479.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-69-600x374.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>   Factory pre-processing, on-site assembly&#8230; <\/p>\n\n\n\n<p>   Productization puts forward higher requirements for the early work such as deepening and line release. <strong>The traditional sense of extensive line, increasing the size of the field cutting method, has been unable to meet the requirements of product decoration, deepening program needs to be finer<\/strong>, more accurate size, more careful material.  &#8220;Concentrate the line, fine deepening&#8221;.  <\/p>\n\n\n\n<p>   We first from the important process management of deepening design to take everyone to a complete deepening with the project of a full process, <strong>and now, deepening has become a bridge between design and engineering, to ensure quality, progress, and cost of an important link. <\/strong> <\/p>\n\n\n\n<p><strong>2.2<\/strong>\n<\/p>\n\n\n\n<p><strong>Deepen the design of the whole process management<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"518\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-70.jpeg\" alt=\"\" class=\"wp-image-3012\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-70.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-70-300x144.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-70-1024x491.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-70-768x368.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-70-600x288.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Deepen the workflow of your design\n<\/p>\n\n\n\n<p><strong>2.2.1 What do I need to do to deepen in the early stages of a project? <\/strong>\n<\/p>\n\n\n\n<p><strong>1, full participation in the drawing triage<\/strong>\n<\/p>\n\n\n\n<p>\n  Drawing triage work should be fully involved, to avoid the completion of a single post. Early detection of problems in the full review map can effectively reduce losses. It is also an important way for project management and effective learning. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"790\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320.png\" alt=\"\" class=\"wp-image-3013\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320-300x219.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320-1024x749.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320-768x562.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320-600x439.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2, drawing material integrity check<\/strong>\n<\/p>\n\n\n\n<p>   Collect complete drawings for the next drawing review. <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1026\" height=\"443\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-71.jpeg\" alt=\"\" class=\"wp-image-3014\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-71.jpeg 1026w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-71-300x130.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-71-1024x442.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-71-768x332.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-71-600x259.jpeg 600w\" sizes=\"(max-width: 1026px) 100vw, 1026px\" \/><\/figure>\n\n\n\n<p><strong>3, site survey<\/strong>\n<\/p>\n\n\n\n<p>\n  Master the site civil masonry, mechanical and electrical drawing version, check the site masonry wall mechanical and electrical pipe and decorative drawings consistent. \n<\/p>\n\n\n\n<p><strong>The <\/strong>high implementability of walls, curtain wall positions, mechanical and electrical pipes, and ceilings are measured by the baseline.  <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"721\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321.png\" alt=\"\" class=\"wp-image-3015\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321-300x200.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321-1024x684.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321-768x513.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321-600x401.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>4, the work interface division<\/strong>\n<\/p>\n\n\n\n<p>\n  Check whether the contract, list, drawings on the work interface description is clear, especially in the multi-standard area work, strong and weak electric work interface, front and rear field area division is often difficult to define clearly through the text description, can be confirmed by CAD color plane form with the owner. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"574\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322.png\" alt=\"\" class=\"wp-image-3016\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322-300x159.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322-1024x544.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322-768x408.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322-600x319.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>5, professional drawings of the system review<\/strong>\n<\/p>\n\n\n\n<p>   Fire zoning map: View the building map fire partition division, firewall, fire door, fire curtain setting position, and decoration drawing check.  <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"986\" height=\"699\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323.png\" alt=\"\" class=\"wp-image-3017\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323.png 986w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323-300x213.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323-768x544.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323-600x425.png 600w\" sizes=\"(max-width: 986px) 100vw, 986px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"699\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-72.jpeg\" alt=\"\" class=\"wp-image-3018\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-72.jpeg 960w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-72-300x218.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-72-768x559.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-72-600x437.jpeg 600w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<p>\n  Fire evacuation\n<\/p>\n\n\n\n<p>\n  Anti-smoke partition\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1053\" height=\"373\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-73.jpeg\" alt=\"\" class=\"wp-image-3019\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-73.jpeg 1053w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-73-300x106.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-73-1024x363.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-73-768x272.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-73-600x213.jpeg 600w\" sizes=\"(max-width: 1053px) 100vw, 1053px\" \/><\/figure>\n\n\n\n<p><strong>Building <\/strong>walls\n<\/p>\n\n\n\n<p><strong>Check the position <\/strong>of the beam and the point relationship of the watering equipment\n<\/p>\n\n\n\n<p><strong>Check the <\/strong>location of the kitchen, bathroom drop-off area\n<\/p>\n\n\n\n<p><strong>The position of<\/strong> the electromechanical fire hydrant\n<\/p>\n\n\n\n<p><strong>Check <\/strong>the water supply and drainage drawings fire, water pipe position\n<\/p>\n\n\n\n<p><strong>Check <\/strong>the electrical drawing box position\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"999\" height=\"739\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-324.png\" alt=\"\" class=\"wp-image-3020\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-324.png 999w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-324-300x222.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-324-768x568.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-324-600x444.png 600w\" sizes=\"(max-width: 999px) 100vw, 999px\" \/><\/figure>\n\n\n\n<p><strong>2.2.2 What is the work done during the construction phase of the project site? <\/strong>\n<\/p>\n\n\n\n<p><strong>Through the drawing triage, organize the following list:<\/strong>\n<\/p>\n\n\n\n<p><strong>1, drawing answer list<\/strong>\n<\/p>\n\n\n\n<p><strong>: <\/strong>With the project department, explain, Party A, the designer&#8217;s intention, and the drawing triage in the problem, clear which is the construction staff to solve the problem which is to deepen the design of the deepening of the drawing, responsibility to the person. \n<\/p>\n\n\n\n<p><strong>&#8211; <\/strong>Answer questions at the scene of the question-and-answer session in places where the location of the triage of the drawings is not clear, to avoid forgetting later.  <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"912\" height=\"466\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-74.jpeg\" alt=\"\" class=\"wp-image-3021\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-74.jpeg 912w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-74-300x153.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-74-768x392.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-74-600x307.jpeg 600w\" sizes=\"(max-width: 912px) 100vw, 912px\" \/><\/figure>\n\n\n\n<p><strong>2, special program deepening list (rationalization proposal).<\/strong>\n<\/p>\n\n\n\n<p>\n  Stone lines, gypsum lines, stainless steel lines should be combined with node charts and quantity classification statistics, the need for multi-professional integration of special deepening: such as service desk, revolving door, door partition, fire curtain door.\n<\/p>\n\n\n\n<p><strong>Original design node problem:<\/strong> urinal break should not be directly fixed only in the grass-roots board, insufficient firmness, there are security risks. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"565\" height=\"437\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-75.jpeg\" alt=\"\" class=\"wp-image-3022\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-75.jpeg 565w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-75-300x232.jpeg 300w\" sizes=\"(max-width: 565px) 100vw, 565px\" \/><\/figure>\n\n\n\n<p><strong>After deepening the node recommendations:<\/strong> Metal pieces fixed to the base steel frame (where the appearance is feasible) to ensure the safety of the use of glass partitions. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"896\" height=\"639\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-76.jpeg\" alt=\"\" class=\"wp-image-3023\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-76.jpeg 896w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-76-300x214.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-76-768x548.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-76-600x428.jpeg 600w\" sizes=\"(max-width: 896px) 100vw, 896px\" \/><\/figure>\n\n\n\n<p><strong>3,1:1<\/strong> <strong>sample list<\/strong>\n<\/p>\n\n\n\n<p>\n  With the project department to optimize the original design modeling, account for clear the various materials between the closing scheme, and make a big sample.\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"673\" height=\"660\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-77.jpeg\" alt=\"\" class=\"wp-image-3024\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-77.jpeg 673w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-77-300x294.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-77-600x588.jpeg 600w\" sizes=\"(max-width: 673px) 100vw, 673px\" \/><\/figure>\n\n\n\n<p><strong>2.2.3 Line control<\/strong>\n<\/p>\n\n\n\n<p><strong>1, the main control line<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"776\" height=\"434\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-78.jpeg\" alt=\"\" class=\"wp-image-3025\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-78.jpeg 776w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-78-300x168.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-78-768x430.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-78-600x336.jpeg 600w\" sizes=\"(max-width: 776px) 100vw, 776px\" \/><\/figure>\n\n\n\n<p><strong>2, the site to complete the face line<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1056\" height=\"590\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-325.png\" alt=\"\" class=\"wp-image-3026\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-325.png 1056w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-325-300x168.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-325-1024x572.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-325-768x429.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-325-600x335.png 600w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/figure>\n\n\n\n<p><strong>2.2.4 Comprehensive cloth point drawing<\/strong>\n<\/p>\n\n\n\n<p><strong>1, comprehensive floor plan drawing<\/strong>\n<\/p>\n\n\n\n<p>   Comprehensive point placement not only <strong>requires that all professional equipment can not be missed,<\/strong> to have the professional specification <strong>knowledge<\/strong> but also pay special attention to the relationship between the professional <strong>points.<\/strong>     <br> <\/p>\n\n\n\n<p>   Require points in the case of meeting the specification <strong>as beautiful as possible, horizontal vertical on a straight line, in a space around the point as symmetrical, balanced, and so on. A single point is as symmetrical as possible in the shape or symmetrical with the relative shape, etc. under the premise of meeting the specification. <\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"976\" height=\"687\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-79.jpeg\" alt=\"\" class=\"wp-image-3027\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-79.jpeg 976w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-79-300x211.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-79-768x541.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-79-600x422.jpeg 600w\" sizes=\"(max-width: 976px) 100vw, 976px\" \/><\/figure>\n\n\n\n<p><strong>2, comprehensive top surface drawing<\/strong>\n<\/p>\n\n\n\n<p>\n  Determine the ceiling height and material\n<\/p>\n\n\n\n<p><strong>Lighting <\/strong>fixtures\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"1842\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-80.jpeg\" alt=\"\" class=\"wp-image-3028\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-80.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-80-176x300.jpeg 176w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-80-600x1023.jpeg 600w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-80-768x1310.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-80-901x1536.jpeg 901w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>3, the ground and wall integrated cloth points need to pay attention to<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"819\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-81.jpeg\" alt=\"\" class=\"wp-image-3029\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-81.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-81-300x228.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-81-1024x777.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-81-768x582.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-81-600x455.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>The line is the whole project into the specific implementation phase of the initial link, but also the core basic link, <\/strong>is the entire project construction site review, but also the control of the closing between the materials, to ensure that the material joint <strong>order, to ensure the accuracy of the backfield material processing, to avoid the project late rush.<\/strong>     <br> <\/p>\n\n\n\n<p>\n  The quality of the line is related to the ability to achieve the quality objectives set by the project, for the construction workers, the line should adhere to the end, pay attention to the closing principle, <strong>after<\/strong> <strong>analysis and summary of the complex line release process through<\/strong> <strong>16<\/strong> <strong>to complete. <\/strong>\n<\/p>\n\n\n\n<p><strong>2.3<\/strong>\n<\/p>\n\n\n\n<p><strong>16 line ideas<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><p>\n  01 Full partition reading\n<\/p><\/td><td><p>\n  02 Business planning program\n<\/p><\/td><\/tr><tr><td><p>\n  03 Put the line technology to the bottom\n<\/p><\/td><td><p><strong>04 Decorative axis deepening<\/strong>\n<\/p><\/td><\/tr><tr><td><p>\n  05 Place the decorative axis\n<\/p><\/td><td><p><strong>06 Measure civil construction deviations<\/strong>\n  <br>\n<\/p><\/td><\/tr><tr><td><p>\n  07 Construction node deepening\n<\/p><\/td><td><p><strong>08 Drawing Cross layout<\/strong>\n<\/p><\/td><\/tr><tr><td><p>   09 Endpoint typography <\/p><\/td><td><p>\n  10 Drawings review signatures\n<\/p><\/td><\/tr><tr><td><p><strong>11 Complete the hatch drawing<\/strong>\n<\/p><\/td><td><p>\n  12 Place the finished face\n<\/p><\/td><\/tr><tr><td><p>\n  13 End forced positioning\n<\/p><\/td><td><p>\n  14 On-site on-site acceptance\n  <br>\n<\/p><\/td><\/tr><tr><td><p>\n  15 The drawings are signed by all\n<\/p><\/td><td><p>\n  16 Materials jointly placing an order\n<\/p><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"988\" height=\"731\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-326.png\" alt=\"\" class=\"wp-image-3030\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-326.png 988w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-326-300x222.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-326-768x568.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-326-600x444.png 600w\" sizes=\"(max-width: 988px) 100vw, 988px\" \/><\/figure>\n\n\n\n<p>\n  The decorative axis deepens\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"445\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-327.png\" alt=\"\" class=\"wp-image-3031\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-327.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-327-300x124.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-327-1024x422.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-327-768x316.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-327-600x247.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Measurement deviation\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"606\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-328.png\" alt=\"\" class=\"wp-image-3032\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-328.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-328-300x168.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-328-1024x575.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-328-768x431.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-328-600x337.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Plane complete face chart, data comprehensive axis measurement\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"624\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-329.png\" alt=\"\" class=\"wp-image-3033\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-329.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-329-300x173.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-329-1024x592.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-329-768x444.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-329-600x347.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Construction node optimization\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"518\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-330.png\" alt=\"\" class=\"wp-image-3034\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-330.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-330-300x144.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-330-1024x491.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-330-768x368.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-330-600x288.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>   Endpoint typography . .  <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1056\" height=\"499\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-331.png\" alt=\"\" class=\"wp-image-3035\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-331.png 1056w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-331-300x142.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-331-1024x484.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-331-768x363.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-331-600x284.png 600w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/figure>\n\n\n\n<p>\n  Put the finished face line\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"728\" height=\"348\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-332.png\" alt=\"\" class=\"wp-image-3036\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-332.png 728w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-332-300x143.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-332-600x287.png 600w\" sizes=\"(max-width: 728px) 100vw, 728px\" \/><\/figure>\n\n\n\n<p>\n  The end forces the positioning of the\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"629\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-333.png\" alt=\"\" class=\"wp-image-3037\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-333.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-333-300x175.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-333-1024x596.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-333-768x447.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-333-600x349.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Jointly  placing an order\n<\/p>\n\n\n\n<p><strong>With the<\/strong> implementation of the &#8220;model first&#8221;  system, the site problems will be exposed promptly<strong>, for the later construction to provide a basis, but also better control of the site<\/strong> <\/p>\n\n\n\n<p><strong>2.4<\/strong>\n<\/p>\n\n\n\n<p><strong>The model comes first<\/strong>\n<\/p>\n\n\n\n<p>\n  Enterprises can pass three models first, put an end to customer litigation risk, improve the satisfaction of owners. In general, the model includes the following first during construction. \n<\/p>\n\n\n\n<p><strong>Solid model:<\/strong> By presenting the solid model and jointly reviewed by the responsible parties of design, procurement, cost, engineering, and construction, the unreasonable or wrong places are optimized and corrected, and the standards of product output are guided.  <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"368\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-82.jpeg\" alt=\"\" class=\"wp-image-3038\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-82.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-82-300x102.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-82-1024x349.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-82-768x262.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-82-600x204.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  The <strong>process<\/strong> <strong>method model:<\/strong> unified construction quality standards, requiring each construction team to carry out construction according to this standard. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1072\" height=\"450\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-83.jpeg\" alt=\"\" class=\"wp-image-3039\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-83.jpeg 1072w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-83-300x126.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-83-1024x430.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-83-768x322.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-83-600x252.jpeg 600w\" sizes=\"(max-width: 1072px) 100vw, 1072px\" \/><\/figure>\n\n\n\n<p>\n  Paint the gypsum process \/ measured amount \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"370\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-334.png\" alt=\"\" class=\"wp-image-3040\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-334.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-334-300x103.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-334-1024x351.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-334-768x263.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-334-600x206.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>   Smallpox keel process\/window sill stone process\/window sill stone closing process  <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"370\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-335.png\" alt=\"\" class=\"wp-image-3041\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-335.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-335-300x103.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-335-1024x351.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-335-768x263.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-335-600x206.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>   Ceiling latex lacquer process\/wall latex paint process\/wall brick process  <\/p>\n\n\n\n<p><strong>Material model:<\/strong> clear material allocation standards, the formation of design seal samples, guide the bulk construction material standards. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"810\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-84.jpeg\" alt=\"\" class=\"wp-image-3042\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-84.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-84-300x225.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-84-1024x768.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-84-768x576.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-84-600x450.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>   With the continuous development of productized decoration, modularization is gradually popular, ordinary on-site production has been unable to meet the pace of decoration today, to<strong> speed up the pace of construction, improve construction quality and reduce construction costs, semi-finished products on-site processing is the trend. <\/strong> <\/p>\n\n\n\n<p><strong>2.5<\/strong>\n<\/p>\n\n\n\n<p><strong>Semi-finished construction<\/strong>\n<\/p>\n\n\n\n<p><strong>1, semi-finished processing area main processing catalog<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"534\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85.jpeg\" alt=\"\" class=\"wp-image-3043\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85-300x148.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85-1024x506.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85-768x380.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-85-600x297.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"653\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-336.png\" alt=\"\" class=\"wp-image-3044\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-336.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-336-300x181.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-336-1024x619.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-336-768x464.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-336-600x363.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2, grass-roots semi-finished production<\/strong>\n<\/p>\n\n\n\n<p>\n  According to the smallpox keel layout and processing size list, to achieve in the semi-finished processing area processing ruler hanging board to the site assembly.\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"825\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-337.png\" alt=\"\" class=\"wp-image-3045\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-337.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-337-300x229.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-337-1024x782.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-337-768x587.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-337-600x458.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>For the focus will affect the operation plan of the<\/strong> construction as the focus <strong>of attention, the key line process time directly affects the project duration,<\/strong> so in the early stage combing out the relationship between the key lines and parallel lines, is conducive to a certain <strong>duration, cost, resources<\/strong> under the timely adjustment of the arrangement of the best schedule. \n<\/p>\n\n\n\n<p><strong>2.6<\/strong>\n<\/p>\n\n\n\n<p><strong>Progress management<\/strong>\n<\/p>\n\n\n\n<p><strong>1, the key line map<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"474\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86.jpeg\" alt=\"\" class=\"wp-image-3046\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86-300x132.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86-1024x449.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86-768x337.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-86-600x263.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2, key node schedule<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"931\" height=\"382\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-87.jpeg\" alt=\"\" class=\"wp-image-3047\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-87.jpeg 931w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-87-300x123.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-87-768x315.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-87-600x246.jpeg 600w\" sizes=\"(max-width: 931px) 100vw, 931px\" \/><\/figure>\n\n\n\n<p><strong>3, the total schedule<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"645\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-88.jpeg\" alt=\"\" class=\"wp-image-3048\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-88.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-88-300x179.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-88-1024x612.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-88-768x459.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-88-600x358.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>4, progress correction<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1066\" height=\"437\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-338.png\" alt=\"\" class=\"wp-image-3049\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-338.png 1066w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-338-300x123.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-338-1024x420.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-338-768x315.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-338-600x246.png 600w\" sizes=\"(max-width: 1066px) 100vw, 1066px\" \/><\/figure>\n\n\n\n<p><strong>How to prevent project losses and expand profitability is a topic of great concern to all project managers, even project managers, and other company leaders.<\/strong> <\/p>\n\n\n\n<p>   In the actual construction process, focus on <strong>the<\/strong> <strong>&#8220;work, materials, fees&#8221;<\/strong>  three blocks, respectively, cost control, to achieve the &#8220;turn a profit&#8221;  effect.  <\/p>\n\n\n\n<p><strong>2.7<\/strong>\n<\/p>\n\n\n\n<p><strong>Cost budget management<\/strong>\n<\/p>\n\n\n\n<p><strong>How to do it effectively in the construction process of the project &#8220;<\/strong> <strong>to calculate the guidance to do<\/strong> <strong>it&#8221;? <\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"544\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-339.png\" alt=\"\" class=\"wp-image-3050\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-339.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-339-300x151.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-339-1024x516.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-339-768x387.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-339-600x302.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong><em>03<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>The face layer installation phase<\/strong>\n<\/p>\n\n\n\n<p><strong>Processes that have special requirements or have a greater impact on the next process, or that are more difficult to process, have more quality fluctuations, or have more quality problems, <\/strong>should be controlled with emphasis.  <\/p>\n\n\n\n<p><strong>3.1<\/strong>\n<\/p>\n\n\n\n<p><strong>Key operations are controlled<\/strong>\n<\/p>\n\n\n\n<p><strong>Take stone control as an example<\/strong>\n  <br>\n<\/p>\n\n\n\n<p>\n  Waste planning: because of the large difference in stone patterns, according to the amount of stone in each area, to plan stone waste;\n<\/p>\n\n\n\n<p>\n  1:1 Take a picture: each large board to choose the location to use;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"406\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-340.png\" alt=\"\" class=\"wp-image-3051\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-340.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-340-300x113.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-340-1024x385.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-340-768x289.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-340-600x226.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Guide CAD drawings, according to the material photos for specifications layout;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"579\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-341.png\" alt=\"\" class=\"wp-image-3052\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-341.png 1000w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-341-300x174.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-341-768x445.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-341-600x347.png 600w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<p><strong>Specification <\/strong>typography by materialized photo;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"444\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-342.png\" alt=\"\" class=\"wp-image-3053\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-342.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-342-300x123.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-342-1024x421.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-342-768x316.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-342-600x247.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>After <\/strong>the installation is completed, according to the color layout for on-site acceptance;\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1015\" height=\"564\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-343.png\" alt=\"\" class=\"wp-image-3054\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-343.png 1015w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-343-300x167.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-343-768x427.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-343-600x333.png 600w\" sizes=\"(max-width: 1015px) 100vw, 1015px\" \/><\/figure>\n\n\n\n<p><strong>Almost 60% of<\/strong> <strong>the projects have the phenomenon of rush work, large volume, tight schedule, workers are not enough, temporary scheduling must rob! <\/strong> The formulation of the work-snatching scheme must be an effective process of <strong>&#8220;squeezing time, freeing up space and spelling<\/strong> <strong>speed&#8221;.<\/strong>   <\/p>\n\n\n\n<p><strong>3.2<\/strong>\n<\/p>\n\n\n\n<p><strong>A job-snatching scheme<\/strong>\n<\/p>\n\n\n\n<p>   Identify key lines, deploy resources, favorable coordination of Party A, supervision, cooperation units, and other peripheral relations; <\/p>\n\n\n\n<p>\n  Horizontal segmentation, subregional rush;\n<\/p>\n\n\n\n<p><strong>A <\/strong>clear division of labor, the regional division of management, responsible for the person; <\/p>\n\n\n\n<p>\n  To clarify the completion time of key nodes, award and penalty points clearly, improve the execution;\n<\/p>\n\n\n\n<p>\n  Wood finishes and stone should be manned to prevent accidents in the middle. \n<\/p>\n\n\n\n<p>   To achieve the &#8220;perfect&#8221;   effect, the project construction needs to control too many factors, from the <strong>project start,<\/strong> intermediate <strong>process, until the completion of the final stage, including the line, bottom, process supervision, management experience, and team construction quality requirements awareness,<\/strong> need to be managed, supervision in place.  <\/p>\n\n\n\n<p><strong>3.3<\/strong>\n<\/p>\n\n\n\n<p><strong>quality control<\/strong>\n<\/p>\n\n\n\n<p><strong>1, process nodes, quality disease, effect map on the wall<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"776\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-344.png\" alt=\"\" class=\"wp-image-3055\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-344.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-344-300x216.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-344-1024x736.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-344-768x552.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-344-600x431.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>Case 1:<\/strong> <strong>Top anti-hanging stone does not meet the relevant standards<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"526\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89.jpeg\" alt=\"\" class=\"wp-image-3056\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89-300x146.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89-1024x499.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89-768x374.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-89-600x292.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"786\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90.jpeg\" alt=\"\" class=\"wp-image-3057\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90-300x218.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90-1024x745.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90-768x559.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-90-600x437.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>Pre-control of general disease:<\/strong>\n<\/p>\n\n\n\n<p>\n  (1) The pre-design consideration of the use of imitation stone material for local replacement, or layout size should not be too large. \n<\/p>\n\n\n\n<p>\n  (2) When the top marble is dry hanging, the dry hanging point and seam position should be reinforced twice to increase the back strip. \n<\/p>\n\n\n\n<p>\n  (3) Paste with AB glue, do not use cloud stone glue. \n<\/p>\n\n\n\n<p><strong>Case two: bathroom steel frame directly landing, do not do ground beams<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"486\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-91.jpeg\" alt=\"\" class=\"wp-image-3058\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-91.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-91-300x135.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-91-1024x461.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-91-768x346.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-91-600x270.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"1018\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92.jpeg\" alt=\"\" class=\"wp-image-3059\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92-300x283.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92-1024x965.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92-768x724.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-92-600x566.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>Pre-control of general disease:<\/strong>\n<\/p>\n\n\n\n<p>\n  (1) clear requirements kitchen or bathroom and other areas with clear waterproof requirements to do guide beams, do a good job of the team&#8217;s construction process. \n<\/p>\n\n\n\n<p>\n  (2) Familiarize yourself with drawings and focus on areas with waterproofing requirements. \n<\/p>\n\n\n\n<p>\n  (3) Concrete guide wall with waterproof function requirements, recommended to 200mm high. \n<\/p>\n\n\n\n<p><strong>2, productized construction process arrangements and delivery bottom<\/strong>\n<\/p>\n\n\n\n<p><strong>Division <\/strong>of the zoning flow section;\n<\/p>\n\n\n\n<p><strong>The <\/strong>installation and construction process arrangement from the release line to the surface material;\n<\/p>\n\n\n\n<p><strong>Standardized <\/strong>size control of the line, easy to standardize the deep-processed materials;\n<\/p>\n\n\n\n<p><strong>Supplier <\/strong>production delivery sequence planning arrangements;\n<\/p>\n\n\n\n<p>   Project members, cooperation units, and supply chain to carry out the bottom.  <\/p>\n\n\n\n<p>\n  What is the process like under product-based decoration? How is it different from traditional decorative process practices?\n<\/p>\n\n\n\n<p>   What can you tell you in the project Manager with20 years of experience that is the correct workflow for &#8220;productized <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247492860&amp;idx=1&amp;sn=a8b2d3a798b706c679744f8088948795&amp;scene=21#wechat_redirect\">decoration&#8221;?<\/a> <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247492860&amp;idx=1&amp;sn=a8b2d3a798b706c679744f8088948795&amp;scene=21#wechat_redirect\"> This<\/a> article learns the workflow of productized decoration.  <\/p>\n\n\n\n<p><strong>3, technical bottom<\/strong>\n<\/p>\n\n\n\n<p><strong>Technical bottoming is an extremely important technical management work of construction enterprises, is the continuation and improvement of construction programs, but also the last pass of project quality pre-control.<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"720\" height=\"539\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-93.jpeg\" alt=\"\" class=\"wp-image-3060\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-93.jpeg 720w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-93-300x225.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-93-600x449.jpeg 600w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n\n\n<p>\n  Bathroom basin cabinet installation of the bottom \n<\/p>\n\n\n\n<p>\n  (1) The back of the basin installation uses a hanging horse strip.  \n<\/p>\n\n\n\n<p>   (2) Installation must be installed, specially opened, the opening must be using special opening equipment, the opening must be processed in the factory to the site.  <\/p>\n\n\n\n<p>\n  (3) The plumber must be notified before installation to check that the water pipe on the wall meets the requirements. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"601\" height=\"466\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-94.jpeg\" alt=\"\" class=\"wp-image-3061\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-94.jpeg 601w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-94-300x233.jpeg 300w\" sizes=\"(max-width: 601px) 100vw, 601px\" \/><\/figure>\n\n\n\n<p>\n  The door cover and door fan mounting cross-bottom \n<\/p>\n\n\n\n<p>   Door cover grass should do impermeable treatment, the stone door can be extended into the door cover, to prevent mold.  <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"810\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95.jpeg\" alt=\"\" class=\"wp-image-3062\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95-300x225.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95-1024x768.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95-768x576.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-95-600x450.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Wipe the seams, make the seams and cross the bottom\n<\/p>\n\n\n\n<p>   (1) the ground crevices using resin glue plus cloud stone glue tint for filling treatment (two fillings, after the seam should be 1mmhigher than the stone surface); <\/p>\n\n\n\n<p>\n  (2) The ground stone should be dry after laying in the seam. \n<\/p>\n\n\n\n<p><strong>3.4<\/strong>\n<\/p>\n\n\n\n<p><strong>Finished product protection<\/strong>\n<\/p>\n\n\n\n<p>   Set up a special packaging group, organize visits and training, do a good job before packing, different methods of different components (ware, etc.), strengthen safety education, increase inspection efforts, maintain packaged finished products, dynamic zoning, responsibility to people, strengthen the protection of corners, which is the most vulnerable place in the face, strengthen the security of small valuables, pay attention to human safety, at this time can not be paralyzed, more can not be a safety accident. <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"544\" height=\"201\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-345.png\" alt=\"\" class=\"wp-image-3063\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-345.png 544w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-345-300x111.png 300w\" sizes=\"(max-width: 544px) 100vw, 544px\" \/><\/figure>\n\n\n\n<p>\n  Hardware protection: Wrap with original packaging materials\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"530\" height=\"201\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-346.png\" alt=\"\" class=\"wp-image-3064\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-346.png 530w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-346-300x114.png 300w\" sizes=\"(max-width: 530px) 100vw, 530px\" \/><\/figure>\n\n\n\n<p>\n  Switch panel protection: Wrap  with original package material\n<\/p>\n\n\n\n<p><strong><em>04<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>The closing phase of the project<\/strong>\n<\/p>\n\n\n\n<p><strong>4.1<\/strong>\n<\/p>\n\n\n\n<p><strong>The elimination plan<\/strong>\n<\/p>\n\n\n\n<p>\n  Quite like this table, since there is a schedule, there must be a sales table, daily update records, not finished into a timely collation of the notification, the next day the project department to take appropriate measures, to ensure that the time to recover. \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"573\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96.jpeg\" alt=\"\" class=\"wp-image-3065\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96-300x159.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96-1024x543.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96-768x407.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-96-600x318.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>4.2<\/strong>\n<\/p>\n\n\n\n<p><strong>Details corrected<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"332\" height=\"249\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-347.png\" alt=\"\" class=\"wp-image-3066\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-347.png 332w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-347-300x225.png 300w\" sizes=\"(max-width: 332px) 100vw, 332px\" \/><\/figure>\n\n\n\n<p>\n  Stone yang angle detail correction by the manufacturer specially polished 3mm bevel angle\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"345\" height=\"251\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-348.png\" alt=\"\" class=\"wp-image-3067\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-348.png 345w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-348-300x218.png 300w\" sizes=\"(max-width: 345px) 100vw, 345px\" \/><\/figure>\n\n\n\n<p>\n  Earless door cover grooves and correction with wall brick closing details:\n<\/p>\n\n\n\n<p>\n  The door cover and the wall brick gap are treated with porcelain white glue \n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"332\" height=\"245\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-349.png\" alt=\"\" class=\"wp-image-3068\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-349.png 332w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-349-300x221.png 300w\" sizes=\"(max-width: 332px) 100vw, 332px\" \/><\/figure>\n\n\n\n<p>\n  Door-to-page correction details:\n<\/p>\n\n\n\n<p>   Screw carpentry adjusts the cross, the  door frame, and the joint sheet repair flat <\/p>\n\n\n\n<p><strong>4.4<\/strong>\n<\/p>\n\n\n\n<p><strong>The final accounts are sent for trial<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"710\" height=\"400\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-97.jpeg\" alt=\"\" class=\"wp-image-3069\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-97.jpeg 710w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-97-300x169.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-97-600x338.jpeg 600w\" sizes=\"(max-width: 710px) 100vw, 710px\" \/><\/figure>\n\n\n\n<p>   Project management is a complex and systematic project, with good ideas, good methods, good tools, but also needs strong implementation, only to complete a satisfactory work, the real implementation of the customer-centered concept. <\/p>","protected":false},"excerpt":{"rendered":"<p>Construction management, management core, decoration co [&hellip;]<\/p>","protected":false},"author":1,"featured_media":3011,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[201,63,61,56],"tags":[],"class_list":["post-3006","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-office-project","category-project-management","category-project-planning","category-project-preparation"],"_links":{"self":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3006","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/comments?post=3006"}],"version-history":[{"count":0,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3006\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media\/3011"}],"wp:attachment":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media?parent=3006"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/categories?post=3006"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/tags?post=3006"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}