{"id":3140,"date":"2021-11-04T15:06:46","date_gmt":"2021-11-04T07:06:46","guid":{"rendered":"https:\/\/epcpmo.com\/?p=3140"},"modified":"2022-09-11T15:26:14","modified_gmt":"2022-09-11T07:26:14","slug":"soundproofing-construction-of-five-star-hotel","status":"publish","type":"post","link":"https:\/\/epcpmo.com\/en\/soundproofing-construction-of-five-star-hotel\/","title":{"rendered":"Soundproofing construction of five-star hotel"},"content":{"rendered":"<h4 class=\"wp-block-heading\"><a id=\"post-3140-activity-name\"><\/a><a id=\"post-3140-img-content\"><\/a><a id=\"post-3140-page-content\"><\/a><a id=\"post-3140-js_article\"><\/a>Acoustic soundproofing construction scheme for five-star hotel rooms<\/h4>\n\n\n\n<p><a id=\"post-3140-js_content\"><\/a>\n<\/p>\n\n\n\n<p>   A five-star hotel on the room sound insulation requirements are very high, construction requirements are also very detailed, this issue we share with you <strong>five-star hotel room soundproofing construction program, integration of relevant acoustic design specifications, and combined with the actual situation on the construction site, to provide a reference for construction experience. <\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1080\" height=\"619\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-121.jpeg\" alt=\"\" class=\"wp-image-3142\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-121.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-121-300x172.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-121-1024x587.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-121-768x440.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-121-600x344.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img decoding=\"async\" width=\"1080\" height=\"806\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-122.jpeg\" alt=\"\" class=\"wp-image-3143\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-122.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-122-300x224.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-122-1024x764.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-122-768x573.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-122-600x448.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>For the above 8<\/strong> <strong>room noise sources, soundproofing schemes and measures are detailed below:<\/strong>\n<\/p>\n\n\n\n<p><strong><em>01<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>Measures to be taken in the area against the curtain wall<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img decoding=\"async\" width=\"1080\" height=\"606\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-123.jpeg\" alt=\"\" class=\"wp-image-3144\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-123.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-123-300x168.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-123-1024x575.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-123-768x431.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-123-600x337.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>1.1<\/strong>\n<\/p>\n\n\n\n<p><strong>Blocked between curtain walls<\/strong>\n<\/p>\n\n\n\n<p><strong>Curtain wall fixed cover sulfate<\/strong> sulfate<strong> s\/he<\/strong> concrete <strong>s\/he<\/strong> <strong>carpet-specific mats<\/strong> <strong>s\/carpets<\/strong>   <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"530\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124.jpeg\" alt=\"\" class=\"wp-image-3145\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124-300x147.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124-1024x503.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124-768x377.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-124-600x294.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Blocking node between curtain wall floors\n<\/p>\n\n\n\n<p><strong>1.2<\/strong>\n<\/p>\n\n\n\n<p><strong>Soundproofing and damping practices on the partition wall against the curtain wall<\/strong>\n<\/p>\n\n\n\n<p><strong>100 Keel smoldering <\/strong>cotton (100kg\/ m3)  s galvanized<strong> steel plate<\/strong> <strong> (1.5mm x 2)s<\/strong> <strong>gypsum plate ().<\/strong> <strong>12mm*2\uff09<\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"483\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-125.jpeg\" alt=\"\" class=\"wp-image-3146\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-125.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-125-300x134.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-125-1024x458.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-125-768x343.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-125-600x268.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  The wall-blocking practices that connect to the curtain wall node diagram \n<\/p>\n\n\n\n<p><strong><em>02<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>Decorative soundproofing and damping measures<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"606\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-126.jpeg\" alt=\"\" class=\"wp-image-3147\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-126.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-126-300x168.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-126-1024x575.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-126-768x431.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-126-600x337.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2.1<\/strong>\n<\/p>\n\n\n\n<p><strong>soundproofing of the door<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"898\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127.jpeg\" alt=\"\" class=\"wp-image-3148\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127-300x249.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127-1024x851.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127-768x639.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-127-600x499.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"699\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-128.jpeg\" alt=\"\" class=\"wp-image-3149\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-128.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-128-300x194.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-128-1024x663.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-128-768x497.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-128-600x388.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2.2<\/strong>\n<\/p>\n\n\n\n<p><strong>The practice of soundproofing and damping of walls<\/strong>\n<\/p>\n\n\n\n<p>\n  STC: Minimum noise transmission level standard for rooms. Five-star hotels generally require STC standards of 39 to 60 rooms. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"785\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-129.jpeg\" alt=\"\" class=\"wp-image-3150\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-129.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-129-300x218.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-129-1024x744.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-129-768x558.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-129-600x436.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"651\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-130.jpeg\" alt=\"\" class=\"wp-image-3151\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-130.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-130-300x181.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-130-1024x617.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-130-768x463.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-130-600x362.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2.3<\/strong>\n<\/p>\n\n\n\n<p><strong>Specific wall-blocking practices<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1018\" height=\"1186\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-131.jpeg\" alt=\"\" class=\"wp-image-3152\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-131.jpeg 1018w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-131-258x300.jpeg 258w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-131-879x1024.jpeg 879w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-131-768x895.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-131-600x699.jpeg 600w\" sizes=\"(max-width: 1018px) 100vw, 1018px\" \/><\/figure>\n\n\n\n<p><strong>(1) Household<\/strong> Wall <strong>Practice<\/strong> <strong>Node Construction:12mm<\/strong> <strong>gypsum board<\/strong> <strong>s5 s75mm(60kg\/m3)rock wool<\/strong> <strong>s2<\/strong> <strong>layers<\/strong> \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"713\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-132.jpeg\" alt=\"\" class=\"wp-image-3153\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-132.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-132-300x198.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-132-1024x676.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-132-768x507.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-132-600x396.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Hotel rooms are divided into wall nodes, click to view the larger picture\n<\/p>\n\n\n\n<p><strong>(2) Showers are separated from public corridor walls<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"672\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-133.jpeg\" alt=\"\" class=\"wp-image-3154\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-133.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-133-300x187.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-133-1024x637.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-133-768x478.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-133-600x373.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  The public corridor is separated from the shower area by a wall node, click to see the larger picture\n<\/p>\n\n\n\n<p><strong>(3) Toilet room and public corridor partition wall<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"660\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-134.jpeg\" alt=\"\" class=\"wp-image-3155\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-134.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-134-300x183.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-134-1024x626.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-134-768x469.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-134-600x367.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  For the public corridor and toilet spacer wall node, click to see the larger picture\n<\/p>\n\n\n\n<p><strong>(4) Pipe wells and public corridor walls<\/strong>\n  <br>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"694\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-135.jpeg\" alt=\"\" class=\"wp-image-3156\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-135.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-135-300x193.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-135-1024x658.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-135-768x494.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-135-600x386.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  For the public corridor and pipe well wall node, click to view the larger picture\n<\/p>\n\n\n\n<p><strong>(5)Pipe well and indoor partition wall<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"637\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-136.jpeg\" alt=\"\" class=\"wp-image-3157\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-136.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-136-300x177.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-136-1024x604.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-136-768x453.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-136-600x354.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Pipe well and indoor partition wall node, click to view the large picture\n<\/p>\n\n\n\n<p><strong>(6)Adjacent room bathroom and sanitary space wall<\/strong>\n  <br>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"649\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-137.jpeg\" alt=\"\" class=\"wp-image-3158\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-137.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-137-300x180.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-137-1024x615.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-137-768x462.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-137-600x361.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Room adjacent sanitary spacer wall node, click to view the large picture\n<\/p>\n\n\n\n<p><strong>2.4<\/strong>\n<\/p>\n\n\n\n<p><strong>Construction practices for wall shock absorption (details)<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"731\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-138.jpeg\" alt=\"\" class=\"wp-image-3159\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-138.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-138-300x203.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-138-1024x693.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-138-768x520.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-138-600x406.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  The 5mm rubber mat is temporarily fixed to the keel  by the used paper\n  <br>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"733\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-139.jpeg\" alt=\"\" class=\"wp-image-3160\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-139.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-139-300x204.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-139-1024x695.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-139-768x521.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-139-600x407.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  The keel is sealed by sealant after it is installed and secured\n  <br>\n<\/p>\n\n\n\n<p><strong>2.5<\/strong>\n<\/p>\n\n\n\n<p><strong>Pipe well walling practice<\/strong> <strong>details<\/strong>\n<\/p>\n\n\n\n<p>\n  Fixed pipe well square steel away from the guide wall, sealing the plate does not touch the plate surface, to prevent pipe vibration to drive the wall gypsum board vibration\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"985\" height=\"553\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-140.jpeg\" alt=\"\" class=\"wp-image-3161\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-140.jpeg 985w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-140-300x168.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-140-768x431.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-140-600x337.jpeg 600w\" sizes=\"(max-width: 985px) 100vw, 985px\" \/><\/figure>\n\n\n\n<p><strong>2.6<\/strong>\n<\/p>\n\n\n\n<p><strong>Smallpox sound insulation practice requirements<\/strong>\n<\/p>\n\n\n\n<p>   Ceiling practices are consistent with acoustic reports providing sound-absorbing ceiling construction, with a minimum of 150mm thick concrete on the ceiling and a minimum of 50mm thick sound-absorbing padding.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"730\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-141.jpeg\" alt=\"\" class=\"wp-image-3162\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-141.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-141-300x203.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-141-1024x692.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-141-768x519.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-141-600x406.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2.7<\/strong>\n<\/p>\n\n\n\n<p><strong>Ground sound insulation practices and requirements<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"892\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-142.jpeg\" alt=\"\" class=\"wp-image-3163\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-142.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-142-300x248.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-142-1024x846.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-142-768x634.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-142-600x496.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>(1)Interior ground practices in the room:65mm<\/strong> <strong>concrete leveling<\/strong> <strong>s10mm<\/strong> <strong>carpet mats<\/strong> <strong>s9mm<\/strong> <strong>carpets<\/strong>\n  <br>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"620\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-143.jpeg\" alt=\"\" class=\"wp-image-3164\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-143.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-143-300x172.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-143-1024x588.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-143-768x441.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-143-600x344.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>(2)Into the corridor: find a flat layer<\/strong> of <strong>soundproofing mats<\/strong> <strong>and<\/strong> stone Four <strong>Seasons<\/strong> <strong>Hotel Entry Corridor Ground Practice:40mm<\/strong> Cement Mortar   <strong>Flattening and<\/strong> <strong>Stone<\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"585\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-144.jpeg\" alt=\"\" class=\"wp-image-3165\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-144.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-144-300x163.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-144-1024x555.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-144-768x416.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-144-600x325.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong><em>03<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>Cooperate with professional sound insulation and shock absorption measures<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"606\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-145.jpeg\" alt=\"\" class=\"wp-image-3166\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-145.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-145-300x168.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-145-1024x575.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-145-768x431.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-145-600x337.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>3.1<\/strong>\n<\/p>\n\n\n\n<p><strong>Electromechanical sound insulation and vibration reduction practices<\/strong>\n<\/p>\n\n\n\n<p>\n  (1) Sound insulation practices for switch and socket back boxes Acoustic reporting requirements The acoustic report states: Sound insulation is required when the distance between the two <strong>bottom<\/strong> <strong>boxes<\/strong> is less <strong>than<\/strong> <strong>150mm.<\/strong> <strong> <\/strong> <strong>The sound insulation practice is as follows:<\/strong> \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"533\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-146.jpeg\" alt=\"\" class=\"wp-image-3167\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-146.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-146-300x148.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-146-1024x505.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-146-768x379.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-146-600x296.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\"><li>\n    Two-back boxes are less than 150mmapart, greater than 75mm, back-to-back sockets,  can be used 2mm thick galvanized steel plate or 12mm thick gypsum board to cover the back box around\n  <\/li><li>\n    When the four back boxes are adjacent, the 2 layers of 12mm thick gypsum plate are used to cover the back box around tianjin Four Seasons with 12mm gypsum board cladding. \n  <\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"564\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-147.jpeg\" alt=\"\" class=\"wp-image-3168\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-147.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-147-300x157.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-147-1024x535.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-147-768x401.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-147-600x313.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>(2) Soundproofing practices through wall bridges<\/strong> The gap between the bridge and the structural wall is <strong>sealed:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"566\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-148.jpeg\" alt=\"\" class=\"wp-image-3169\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-148.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-148-300x157.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-148-1024x537.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-148-768x402.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-148-600x314.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  (1) Acoustic reporting requires a minimum of 60kg\/m3 of rock wool to be filled around the crevices and sealed with fire-resistant sealant at the end;\n  <br>\n<\/p>\n\n\n\n<p>   (2) Tianjin Four Seasons site with 60kg\/m3 rock wool filled gaps and closed with gypsum board.  <\/p>\n\n\n\n<p><strong>3.2<\/strong>\n<\/p>\n\n\n\n<p><strong>Sound insulation and vibration reduction in the air conditioning system<\/strong>\n<\/p>\n\n\n\n<p><strong>(1) Fan coil<\/strong>: When the fan coil is installed, a spring gasket connection should be used between the boom and the winding coil to reduce the noise caused by vibration when the winding coil is running.   <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"426\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-149.jpeg\" alt=\"\" class=\"wp-image-3170\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-149.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-149-300x118.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-149-1024x404.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-149-768x303.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-149-600x237.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>   On-site lifting, due to ceiling height limits, can not be added spring gaskets, so in the boom and wind plate connection to add rubber cushions to reduce vibration noise.  <\/p>\n\n\n\n<p><strong>(2) Silence elbow:<\/strong> When the fan coil is installed, a spring gasket connection should be used between the boom and the wind plate to reduce the noise caused by vibration when the wind turbine is running. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"606\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-150.jpeg\" alt=\"\" class=\"wp-image-3171\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-150.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-150-300x168.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-150-1024x575.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-150-768x431.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-150-600x337.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  The silence elbow and the fan coil are softly connected by aluminum foil, and the construction of the silence elbow can also absorb sound and reduce noise.\n<\/p>\n\n\n\n<p><strong>3.3<\/strong>\n<\/p>\n\n\n\n<p><strong>HVAC sound-absorbing practices<\/strong>\n<\/p>\n\n\n\n<p><strong>(1) Duct sound insulation treatment<\/strong>\n  <br>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"802\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-151.jpeg\" alt=\"\" class=\"wp-image-3172\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-151.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-151-300x223.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-151-1024x760.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-151-768x570.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-151-600x446.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  The duct pierces the wall soundproofing node\n<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>\n    A minimum of 25 mm thick sound padding should be installed on all low-speed gas supply pipes and fittings. \n  <\/li><li>\n    To install pipe soundproof linings, the material can be neoprene rubber or ethylene-coated fiberglass.\n  <\/li><li>\n    The minimum spacing within the inlet and outlet tubes of each low-pressure air treatment unit is 4570mm. \n    <br>\n  <\/li><\/ul>\n\n\n\n<p><strong>(2) Acoustic report requires duct coat sound insulation noise reduction practices:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"520\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-152.jpeg\" alt=\"\" class=\"wp-image-3173\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-152.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-152-300x144.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-152-1024x493.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-152-768x370.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-152-600x289.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Duct soundproofing node\n<\/p>\n\n\n\n<p><strong>3.4<\/strong>\n<\/p>\n\n\n\n<p><strong>Water-resistant nodes for sound insulation and damping measures in the water supply and drainage pipes<\/strong>\n<\/p>\n\n\n\n<p>\n  (1) All lines should be hung with elastic booms. The boom should be a combination of shear-resistant rubber and spring boom\n<\/p>\n\n\n\n<p>\n  (2) All through the wall should be left 25mm gap, with soundproofing seam material (or non-rigid flame retardant seal material) for insulation and sealing. \n<\/p>\n\n\n\n<p>   (3) The vibration break at the perforation of the pipe can be achieved by installing a larger tube sleeve, and the gap between the pipe and the pipe sleeve is filled with glass cotton. There must be a minimum 12mm gap between the pipe and the sleeve.  <\/p>\n\n\n\n<p>\n  (4) The vibration separator between the pipe and the structure is recommended for the installation of steel insulation springs with a minimum 25mm static deflection. Any support for all water pipes associated with the pump must also be accompanied by a damping spring with a minimum 25mm static deflection. \n  <br>\n<\/p>","protected":false},"excerpt":{"rendered":"<p>Acoustic soundproofing construction scheme for five-sta [&hellip;]<\/p>","protected":false},"author":1,"featured_media":3155,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[58,64,63,57,196,269,270,256,276],"tags":[],"class_list":["post-3140","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hotel-project","category-process-technology","category-project-management","category-project-product","category-quality-control","category-269","category-270","category-256","category-276"],"_links":{"self":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3140","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/comments?post=3140"}],"version-history":[{"count":1,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3140\/revisions"}],"predecessor-version":[{"id":11196,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3140\/revisions\/11196"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media\/3155"}],"wp:attachment":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media?parent=3140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/categories?post=3140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/tags?post=3140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}