{"id":3341,"date":"2021-11-04T16:02:20","date_gmt":"2021-11-04T08:02:20","guid":{"rendered":"https:\/\/epcpmo.com\/?p=3341"},"modified":"2021-11-04T16:02:21","modified_gmt":"2021-11-04T08:02:21","slug":"a-complete-set-of-control-process-solutions-for-the-fine-decoration-process","status":"publish","type":"post","link":"https:\/\/epcpmo.com\/en\/a-complete-set-of-control-process-solutions-for-the-fine-decoration-process\/","title":{"rendered":"A complete set of control process solutions for the fine decoration process"},"content":{"rendered":"<h4 class=\"wp-block-heading\"><a id=\"post-3341-activity-name\"><\/a><a id=\"post-3341-img-content\"><\/a><a id=\"post-3341-page-content\"><\/a><a id=\"post-3341-js_article\"><\/a>Interior finishing process control process(53 cases node anatomy) to give you a full set of engineering solutions! <\/h4>\n\n\n\n<p><a id=\"post-3341-js_content\"><\/a><strong>Share the experience in the construction of interior fine decoration projects, and the fine decoration project construction operation process, for &#8220;hydropower, carpentry, tile, paint and supporting units&#8221; construction methods to be refined, and some nodes with on-site pictures and node highlights. <\/strong> <\/p>\n\n\n\n<p>   To do a good job of fine decoration, not only to control costs, rush the duration but also to protect the quality, for the project team is a great test, <strong>wherein the process index is the key to the entire project management logic! <\/strong> So before we begin, let&#8217;s sort out with you the entire workflow of fine decoration: <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img fetchpriority=\"high\" decoding=\"async\" width=\"949\" height=\"2560\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-227-scaled.jpeg\" alt=\"\" class=\"wp-image-3343\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-227-scaled.jpeg 949w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-227-111x300.jpeg 111w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-227-380x1024.jpeg 380w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-227-768x2071.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-227-600x1618.jpeg 600w\" sizes=\"(max-width: 949px) 100vw, 949px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img decoding=\"async\" width=\"1080\" height=\"2172\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-228.jpeg\" alt=\"\" class=\"wp-image-3344\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-228.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-228-149x300.jpeg 149w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-228-509x1024.jpeg 509w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-228-768x1545.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-228-764x1536.jpeg 764w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-228-1018x2048.jpeg 1018w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-228-600x1207.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Specific process control for <strong>&#8220;hydropower, carpentry, tile, coatings and supporting unit installation projects&#8221;<\/strong> <strong>(downloaded in this issue of the journal at the end of this article).<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img decoding=\"async\" width=\"1080\" height=\"1256\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-229.jpeg\" alt=\"\" class=\"wp-image-3345\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-229.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-229-258x300.jpeg 258w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-229-881x1024.jpeg 881w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-229-768x893.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-229-600x698.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong><em>01.<\/em><\/strong>\n  <br>\n<\/p>\n\n\n\n<p><strong>Hydropower installation &#8211;<\/strong> <strong>18<\/strong> <strong>items<\/strong> in <strong>total<\/strong>\n<\/p>\n\n\n\n<p><strong>1. Roofline laying:<\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"498\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-230.jpeg\" alt=\"\" class=\"wp-image-3346\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-230.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-230-300x138.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-230-1024x472.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-230-768x354.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-230-600x277.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>   Painted pipeline node details <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"562\" height=\"312\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-231.jpeg\" alt=\"\" class=\"wp-image-3347\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-231.jpeg 562w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-231-300x167.jpeg 300w\" sizes=\"(max-width: 562px) 100vw, 562px\" \/><\/figure>\n\n\n\n<p>   A real-life view of the roofline <\/p>\n\n\n\n<p>\n  Industrial control requirements:\n<\/p>\n\n\n\n<p>   PVC lamp headbox from the pipe card distance should be \u2264 200mm, the distance between the tube card and the tube card \u2264500mm, the tube card with 6mm nylon expansion hose fixed, disabled wood will replace.  PVC junction box and wire tube with cup comb glue connection. The wires drawn from the junction box are protected to the lamp position by applying metal hoses to prevent the wires from exposing to the flat top.  <\/p>\n\n\n\n<p><strong>2. Wall line laying<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"388\" height=\"403\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-468.png\" alt=\"\" class=\"wp-image-3348\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-468.png 388w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-468-289x300.png 289w\" sizes=\"(max-width: 388px) 100vw, 388px\" \/><\/figure>\n\n\n\n<p>\n  Wall pipeline slotting details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"391\" height=\"422\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-232.jpeg\" alt=\"\" class=\"wp-image-3349\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-232.jpeg 391w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-232-278x300.jpeg 278w\" sizes=\"(max-width: 391px) 100vw, 391px\" \/><\/figure>\n\n\n\n<p>\n  Wall line laying step\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>\n  According to the electrical construction drawing, in the wall to determine the position of the switch socket and the direction of the line pipe: after the line of the trench, the depth of the side ditch should be the corresponding money pipe after the completion of the pipe distance powder layer l5mm. Groove inner tube Application of mu plum and wire fixing. \n<\/p>\n\n\n\n<p><strong>3. Ground line laying<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"788\" height=\"301\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-469.png\" alt=\"\" class=\"wp-image-3350\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-469.png 788w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-469-300x115.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-469-768x293.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-469-600x229.png 600w\" sizes=\"(max-width: 788px) 100vw, 788px\" \/><\/figure>\n\n\n\n<p>\n  Ground relationship laying details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"361\" height=\"153\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-233.jpeg\" alt=\"\" class=\"wp-image-3351\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-233.jpeg 361w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-233-300x127.jpeg 300w\" sizes=\"(max-width: 361px) 100vw, 361px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"228\" height=\"126\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-234.jpeg\" alt=\"\" class=\"wp-image-3352\"\/><\/figure>\n\n\n\n<p>\n  Ground pipeline crossing practices, and ground multi-pipeline practices\n<\/p>\n\n\n\n<p><strong>4. Roof water pipes are laid<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"343\" height=\"183\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-235.jpeg\" alt=\"\" class=\"wp-image-3353\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-235.jpeg 343w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-235-300x160.jpeg 300w\" sizes=\"(max-width: 343px) 100vw, 343px\" \/><\/figure>\n\n\n\n<p>\n  A realistic picture of the roof water pipe\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>   Indoor water pipe laying order: &#8220;dry pipe first, branch pipe later&#8221;. Wall, roof pipeline to positioning bullet line: water pipe to the left hot right cold, hot and cold.  <\/p>\n\n\n\n<p><strong>5. Wall water pipe laying:<\/strong> \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"348\" height=\"426\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-470.png\" alt=\"\" class=\"wp-image-3354\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-470.png 348w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-470-245x300.png 245w\" sizes=\"(max-width: 348px) 100vw, 348px\" \/><\/figure>\n\n\n\n<p>\n  Hot and cold water pipe spacing\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"526\" height=\"274\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-236.jpeg\" alt=\"\" class=\"wp-image-3355\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-236.jpeg 526w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-236-300x156.jpeg 300w\" sizes=\"(max-width: 526px) 100vw, 526px\" \/><\/figure>\n\n\n\n<p>\n  A real-life view of the hot and cold water pipe\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>   The depth of the trench of the dark water pipe shall be 15mm from the powder level after the pipe is laid.  And label fixed point, fixed point spacing is not greater than 600mm, the terminal fixed point is not greater than 100mmfrom the mouthpart; <\/p>\n\n\n\n<p><strong>6. Gas pipe, water heater installation:<\/strong> \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"684\" height=\"331\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-237.jpeg\" alt=\"\" class=\"wp-image-3356\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-237.jpeg 684w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-237-300x145.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-237-600x290.jpeg 600w\" sizes=\"(max-width: 684px) 100vw, 684px\" \/><\/figure>\n\n\n\n<p>\n  Water heater, gas  pipe real picture\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>\n  Gas pipes shall not be covered in dark, shall not cross the bedroom, and gas pipes that cross the ceiling shall not have joints. Gas pipe fixation needs to be fixed with a special pipe card. Tube card spacing \u2264 1200mm. \n<\/p>\n\n\n\n<p><strong>7. Pipe test pressure:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"418\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-238.jpeg\" alt=\"\" class=\"wp-image-3357\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-238.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-238-300x116.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-238-1024x396.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-238-768x297.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-238-600x232.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Gas pipe test pressure, water pipe test pressure\n<\/p>\n\n\n\n<p><strong>8. The same layer of drainage pipe is laid<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"506\" height=\"275\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-239.jpeg\" alt=\"\" class=\"wp-image-3358\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-239.jpeg 506w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-239-300x163.jpeg 300w\" sizes=\"(max-width: 506px) 100vw, 506px\" \/><\/figure>\n\n\n\n<p>\n  The same layer drainage reality picture\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>   Drainage pipes should be temporarily sealed for the original pipe ports and ground leakage before construction to prevent debris from entering the sewer pipe. Drainpipe laid on the ground cross pipe must have a certain slope, slope size depends on the scene, generally 2% to 3%.  Sewage pipes must not be connected to wastewater pipes.   <\/p>\n\n\n\n<p>\n  9. Underfloor plumbing:\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"832\" height=\"333\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-471.png\" alt=\"\" class=\"wp-image-3359\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-471.png 832w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-471-300x120.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-471-768x307.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-471-600x240.png 600w\" sizes=\"(max-width: 832px) 100vw, 832px\" \/><\/figure>\n\n\n\n<p>\n  A map of the laying of the ground heating\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"261\" height=\"215\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-240.jpeg\" alt=\"\" class=\"wp-image-3360\"\/><\/figure>\n\n\n\n<p>\n  The solid plot of the ground heating laying\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>   Installation preparation A preparation of a polyphenyl plate a spread of reflective film a roll of wire mesh, a row of pipes and installation of water divider a pressure test a   mash-up one debugging <\/p>\n\n\n\n<p>   The underfloor heating pipe shall be calibrated according to the design drawings of the pipe spacing and direction of laying, should be kept straight, before laying should check the appearance quality of the tube, the tube inside must not have impurities. When the installation is interrupted or complete, the exposure should be sealed at all times.  The underfloor heating pipes buried in the filling layer should not have connectors.  <\/p>\n\n\n\n<p>\n  The loop arrangement of the underfloor heating pipe should not pass through the telescopic seams in the filling layer. Flexible sleeves not less than 400mm in length should be installed at the telescopic seam when crossing. After laying, the first test pressure inspection of the water pipe is carried out After the fine stone concrete is leveled, the second test pressure is carried out before the floor is laid. \n<\/p>\n\n\n\n<p><strong>10. Tube throughline<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"861\" height=\"359\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-241.jpeg\" alt=\"\" class=\"wp-image-3361\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-241.jpeg 861w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-241-300x125.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-241-768x320.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-241-600x250.jpeg 600w\" sizes=\"(max-width: 861px) 100vw, 861px\" \/><\/figure>\n\n\n\n<p>\n  A real-life view of the in-tube throughline\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>   (1) PVC pipe installed, uniform wear wire, check whether the mouth of each pipe is complete, if there are omissions and breakages, should be filled and replaced. The reserved length of the wires in the switch box and socket box shall be 15cm, and the reserved length of the wires in the distribution box shall be 1\/2 ofthecircumstantium of the distribution box.  <\/p>\n\n\n\n<p><strong>11. Line test<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"442\" height=\"331\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-242.jpeg\" alt=\"\" class=\"wp-image-3362\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-242.jpeg 442w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-242-300x225.jpeg 300w\" sizes=\"(max-width: 442px) 100vw, 442px\" \/><\/figure>\n\n\n\n<p>\n  Ohm table\n<\/p>\n\n\n\n<p><strong>12. Switch panel installation:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"315\" height=\"459\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-472.png\" alt=\"\" class=\"wp-image-3363\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-472.png 315w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-472-206x300.png 206w\" sizes=\"(max-width: 315px) 100vw, 315px\" \/><\/figure>\n\n\n\n<p>\n  Switch and socket node diagram\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"260\" height=\"215\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-243.jpeg\" alt=\"\" class=\"wp-image-3364\"\/><\/figure>\n\n\n\n<p>\n  The socket reality chart\n<\/p>\n\n\n\n<p><strong>13. Sanitary Jie County Installation<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"544\" height=\"377\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-473.png\" alt=\"\" class=\"wp-image-3365\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-473.png 544w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-473-300x208.png 300w\" sizes=\"(max-width: 544px) 100vw, 544px\" \/><\/figure>\n\n\n\n<p>\n  Toilet node details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"505\" height=\"256\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-244.jpeg\" alt=\"\" class=\"wp-image-3366\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-244.jpeg 505w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-244-300x152.jpeg 300w\" sizes=\"(max-width: 505px) 100vw, 505px\" \/><\/figure>\n\n\n\n<p>\n  Toilet finish face reality picture\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"868\" height=\"441\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-474.png\" alt=\"\" class=\"wp-image-3367\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-474.png 868w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-474-300x152.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-474-768x390.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-474-600x305.png 600w\" sizes=\"(max-width: 868px) 100vw, 868px\" \/><\/figure>\n\n\n\n<p>\n  Details of  the basin node\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"355\" height=\"170\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-245.jpeg\" alt=\"\" class=\"wp-image-3368\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-245.jpeg 355w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-245-300x144.jpeg 300w\" sizes=\"(max-width: 355px) 100vw, 355px\" \/><\/figure>\n\n\n\n<p>\n  The real-life picture of the basin\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"610\" height=\"412\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-475.png\" alt=\"\" class=\"wp-image-3369\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-475.png 610w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-475-300x203.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-475-600x405.png 600w\" sizes=\"(max-width: 610px) 100vw, 610px\" \/><\/figure>\n\n\n\n<p>\n  Bath profile \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"403\" height=\"270\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-246.jpeg\" alt=\"\" class=\"wp-image-3370\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-246.jpeg 403w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-246-300x201.jpeg 300w\" sizes=\"(max-width: 403px) 100vw, 403px\" \/><\/figure>\n\n\n\n<p>\n  A real-life view of the bathtub\n<\/p>\n\n\n\n<p><strong>14. Ground leakage<\/strong> and pit pipe <strong>installation<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"475\" height=\"279\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-476.png\" alt=\"\" class=\"wp-image-3371\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-476.png 475w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-476-300x176.png 300w\" sizes=\"(max-width: 475px) 100vw, 475px\" \/><\/figure>\n\n\n\n<p>\n  Ground leak node details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"341\" height=\"236\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-477.png\" alt=\"\" class=\"wp-image-3372\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-477.png 341w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-477-300x208.png 300w\" sizes=\"(max-width: 341px) 100vw, 341px\" \/><\/figure>\n\n\n\n<p>\n  Details of the toilet outlet node\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"262\" height=\"155\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-247.jpeg\" alt=\"\" class=\"wp-image-3373\"\/><\/figure>\n\n\n\n<p>\n  A real-life view of the toilet&#8217;s lower water mouth\n<\/p>\n\n\n\n<p><strong>15. Kitchen ground treatment:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"825\" height=\"509\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-478.png\" alt=\"\" class=\"wp-image-3374\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-478.png 825w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-478-300x185.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-478-768x474.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-478-600x370.png 600w\" sizes=\"(max-width: 825px) 100vw, 825px\" \/><\/figure>\n\n\n\n<p>\n  The node details\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>   The specific method of operation is to clean up the grassroots, the yin corner should be treated as a 20mm high R arc. Because leakage occurs in the pipe through the floor, ground leakage, sanitary ware, and kitchen and bathroom yin angle, and other parts, so pay attention to the waterproofing of the detail nodes.  <\/p>\n\n\n\n<p><strong>16. Kitchen line guard<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"935\" height=\"419\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-479.png\" alt=\"\" class=\"wp-image-3375\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-479.png 935w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-479-300x134.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-479-768x344.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-479-600x269.png 600w\" sizes=\"(max-width: 935px) 100vw, 935px\" \/><\/figure>\n\n\n\n<p>\n  Pipeline guard node details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"522\" height=\"286\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-248.jpeg\" alt=\"\" class=\"wp-image-3376\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-248.jpeg 522w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-248-300x164.jpeg 300w\" sizes=\"(max-width: 522px) 100vw, 522px\" \/><\/figure>\n\n\n\n<p>\n  Toilet line guard real-life picture\n<\/p>\n\n\n\n<p><strong>17. Tap installation<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1033\" height=\"320\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-249.jpeg\" alt=\"\" class=\"wp-image-3377\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-249.jpeg 1033w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-249-300x93.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-249-1024x317.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-249-768x238.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-249-600x186.jpeg 600w\" sizes=\"(max-width: 1033px) 100vw, 1033px\" \/><\/figure>\n\n\n\n<p>\n  The tap is fitted with a live-view image\n<\/p>\n\n\n\n<p>\n  Control requirements:\n<\/p>\n\n\n\n<p>\n  When taking over, the left hot and right is cold, and the two tubes are 150mm and 200mmapart. Installation must be balanced, choose a suitable wrench, avoid excessive force, force installation, damage components. \n<\/p>\n\n\n\n<p><strong>18. Lamp installation:<\/strong> \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1076\" height=\"309\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-250.jpeg\" alt=\"\" class=\"wp-image-3378\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-250.jpeg 1076w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-250-300x86.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-250-1024x294.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-250-768x221.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-250-600x172.jpeg 600w\" sizes=\"(max-width: 1076px) 100vw, 1076px\" \/><\/figure>\n\n\n\n<p>\n  Light County Installation Live View \n<\/p>\n\n\n\n<p>\n  Control requirements:\n  <br>\n<\/p>\n\n\n\n<p>   The wires drawn from the lightbox box are protected by hoses to the lamp position to prevent the wires from exposing to the flat top. Downlight installation should be careful with the roof seam tight. <\/p>\n\n\n\n<p><strong><em>02.<\/em><\/strong>\n  <br>\n<\/p>\n\n\n\n<p><strong>Carpentry installation works &#8211;<\/strong> <strong>9<\/strong> <strong>items<\/strong> in <strong>total<\/strong>\n<\/p>\n\n\n\n<p><strong>1. Light steel keel roof base:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"813\" height=\"460\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-480.png\" alt=\"\" class=\"wp-image-3379\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-480.png 813w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-480-300x170.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-480-768x435.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-480-600x339.png 600w\" sizes=\"(max-width: 813px) 100vw, 813px\" \/><\/figure>\n\n\n\n<p>\n  The hanging node details |\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"401\" height=\"173\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-251.jpeg\" alt=\"\" class=\"wp-image-3380\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-251.jpeg 401w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-251-300x129.jpeg 300w\" sizes=\"(max-width: 401px) 100vw, 401px\" \/><\/figure>\n\n\n\n<p>\n  Ceiling reality picture\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>   1) The ceiling elevation positioning bullet line, according to the design elevation in each floor of the surrounding wall bullet level control line, bullet line should be clear and accurate.  <\/p>\n\n\n\n<p>\n  2) Rowing keel dividing line, according to the design requirements of the main and second keel spacing in the high-level line of the canopy label has been played to draw keel dividing line, should pay attention to the position of the roof downlight, the main and second keel should avoid the lamp position. \n<\/p>\n\n\n\n<p>   3) Install the main keel boom: To ensure the stability of the skeleton, the b8 full-tooth boom is secured by expansion bolts. After playing the high-level line of the ceiling and the keel divider line, determine the elevation of the lower end of the boom, fix the boom according to the main keel position and the spacing of the boom, and the length of the boom position should be accurate and appropriate.  <\/p>\n\n\n\n<p>   4) Keel installation: using type 50 keel, keel elevation on the same horizontal line. The main keel is installed after the cable correction and then install the second keel.  <\/p>\n\n\n\n<p><strong>2. Curtain box production<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"619\" height=\"519\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-481.png\" alt=\"\" class=\"wp-image-3381\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-481.png 619w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-481-300x252.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-481-600x503.png 600w\" sizes=\"(max-width: 619px) 100vw, 619px\" \/><\/figure>\n\n\n\n<p>\n  Curtain box construction details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"403\" height=\"463\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-252.jpeg\" alt=\"\" class=\"wp-image-3382\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-252.jpeg 403w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-252-261x300.jpeg 261w\" sizes=\"(max-width: 403px) 100vw, 403px\" \/><\/figure>\n\n\n\n<p>\n  Curtain box reality picture\n<\/p>\n\n\n\n<p><strong>3, lamp slot production:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"757\" height=\"399\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-482.png\" alt=\"\" class=\"wp-image-3383\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-482.png 757w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-482-300x158.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-482-600x316.png 600w\" sizes=\"(max-width: 757px) 100vw, 757px\" \/><\/figure>\n\n\n\n<p>\n  Lamp slot node diagram\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"616\" height=\"289\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-253.jpeg\" alt=\"\" class=\"wp-image-3384\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-253.jpeg 616w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-253-300x141.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-253-600x281.jpeg 600w\" sizes=\"(max-width: 616px) 100vw, 616px\" \/><\/figure>\n\n\n\n<p>\n  Light slot reality picture\n<\/p>\n\n\n\n<p><strong>4. Air vents, access, ventilation fans,<\/strong> <strong>bath bar production<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"568\" height=\"486\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-483.png\" alt=\"\" class=\"wp-image-3385\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-483.png 568w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-483-300x257.png 300w\" sizes=\"(max-width: 568px) 100vw, 568px\" \/><\/figure>\n\n\n\n<p>\n  Node details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"456\" height=\"331\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-254.jpeg\" alt=\"\" class=\"wp-image-3386\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-254.jpeg 456w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-254-300x218.jpeg 300w\" sizes=\"(max-width: 456px) 100vw, 456px\" \/><\/figure>\n\n\n\n<p>\n  A realistic picture of the access and outlet\n<\/p>\n\n\n\n<p><strong>5. Cover panel installation<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"998\" height=\"331\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-484.png\" alt=\"\" class=\"wp-image-3387\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-484.png 998w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-484-300x99.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-484-768x255.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-484-600x199.png 600w\" sizes=\"(max-width: 998px) 100vw, 998px\" \/><\/figure>\n\n\n\n<p>\n  Details of the seam nodes of the board\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"279\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-255.jpeg\" alt=\"\" class=\"wp-image-3388\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-255.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-255-300x78.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-255-1024x265.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-255-768x198.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-255-600x155.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Details of the seam nodes of the board\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>   1) The surface layer is generally a double-layered paper gypsum board or waterproof gypsum board (FC board), the surface layer must be firmly connected with the keel, flat, gap 5-8mm.  <\/p>\n\n\n\n<p>\n  2) The first layer of the plasterboard and the second layer of stitching should be staggered installation and glue bonding. \n<\/p>\n\n\n\n<p>   3) Self-tapping screws should be caught in the gypsum plate surface 0.5mm-1mm depth is appropriate, nail distance must not be greater than 200mmin the middle, screw and plate edge distance should be 10 to 15mlm.  <\/p>\n\n\n\n<p>\n  4) The seams of the gypsum board shall be sewn according to the design requirements. The gypsum board and perimeter wall or column should have a 3mm notch, using elastic putty batch embedded.  so that the plasterboard can be stretched. \n<\/p>\n\n\n\n<p>\n  6. Light steel keel partition wall:\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"469\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-485.png\" alt=\"\" class=\"wp-image-3389\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-485.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-485-300x130.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-485-1024x445.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-485-768x334.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-485-600x261.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Click to see the larger picture\n<\/p>\n\n\n\n<p>\n  Process control requires:\n<\/p>\n\n\n\n<p>\n  1) According to the decorative drawings, the light steel keel partition wall site of the ground, wall, roof bullet line to determine the location. \n<\/p>\n\n\n\n<p>   2) Decorative engineering to make light steel keel partition wall generally uses 75 series light steel keels.  <\/p>\n\n\n\n<p>\n  3) After adjusting the verticality by axis, install the heaven and earth keel, fixed to the roof and ground with a medium 6 x 60 U.S. solid nail, and the fixed point spacing is not greater than 400mm. \n<\/p>\n\n\n\n<p>\n  4) Wearing heart keel support card installation: cut the corresponding length of the pericardial keel according to the length of the wall, into the reserved position in the main keel, with the support card fixed firmly, pay attention to ensure that the wearing keel level, straight. \n<\/p>\n\n\n\n<p><strong>7. Carpentry plate door cover grass:<\/strong> \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"371\" height=\"438\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-486.png\" alt=\"\" class=\"wp-image-3390\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-486.png 371w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-486-254x300.png 254w\" sizes=\"(max-width: 371px) 100vw, 371px\" \/><\/figure>\n\n\n\n<p>\n  Door cover node details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"552\" height=\"326\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-256.jpeg\" alt=\"\" class=\"wp-image-3391\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-256.jpeg 552w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-256-300x177.jpeg 300w\" sizes=\"(max-width: 552px) 100vw, 552px\" \/><\/figure>\n\n\n\n<p>\n  A solid picture of a wooden door cover\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>   1) Check whether the civil reserved door hole meets the door cover size requirements, if not in line with the construction should be repaired after rectification, wooden door is set to do a good job of anti-corrosion treatment.  <\/p>\n\n\n\n<p>\n  2) The door cover base is a double-layered carpentry board, which is pressed and molded after bonding with woodworking special glue, and the material is made according to the design size and actual thickness, and the door cover exceeds the wall by 2mm(kitchen, bathroom door cover should exceed the wall by 20mm).  ), the same door frame horizontal, vertical plate uniform specifications. \n<\/p>\n\n\n\n<p>   3) The door cover is fixed, the pre-made door cover is fixed with 3.5 inches galvanized nails on the wooden crucifixion, the fixing needs to be hoisted to correct, the height and width of the door cover and the specified size error is not greater than 1mm.  <\/p>\n\n\n\n<p>   4) The lower part of the door cover should be suspended from the ground, the bottom is 20mmabove the gross floor, the bottom of the kitchen guard cover is 10mmabove the threshold, and the lower 200mm should be moisture-proof.  When there are multiple door covers on the same wall, the side of the door cover should be on the same plane. Same indoor door cover The height should be uniform.  The door cover and the wall gap are sealed with a foaming agent, and the surface layer is flattened with cement mortar.  <\/p>\n\n\n\n<p><strong>8. Woodworking board laying<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"722\" height=\"407\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-487.png\" alt=\"\" class=\"wp-image-3392\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-487.png 722w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-487-300x169.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-487-600x338.png 600w\" sizes=\"(max-width: 722px) 100vw, 722px\" \/><\/figure>\n\n\n\n<p>\n  Overhead wooden floor node details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"389\" height=\"210\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-257.jpeg\" alt=\"\" class=\"wp-image-3393\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-257.jpeg 389w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-257-300x162.jpeg 300w\" sizes=\"(max-width: 389px) 100vw, 389px\" \/><\/figure>\n\n\n\n<p>\n  This corrugated carpentry board lays a realistic picture \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"425\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-488.png\" alt=\"\" class=\"wp-image-3394\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-488.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-488-300x118.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-488-1024x403.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-488-768x302.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-488-600x236.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Overhead wooden floor node details\n<\/p>\n\n\n\n<p><strong>9. Stainless steel plate installation:<\/strong> \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"805\" height=\"535\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-489.png\" alt=\"\" class=\"wp-image-3395\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-489.png 805w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-489-300x199.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-489-768x510.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-489-600x399.png 600w\" sizes=\"(max-width: 805px) 100vw, 805px\" \/><\/figure>\n\n\n\n<p>\n  Stainless steel installation node details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"474\" height=\"240\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-258.jpeg\" alt=\"\" class=\"wp-image-3396\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-258.jpeg 474w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-258-300x152.jpeg 300w\" sizes=\"(max-width: 474px) 100vw, 474px\" \/><\/figure>\n\n\n\n<p>\n  Stainless steel mounting reality picture\n<\/p>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>\n  Wall direct: The construction is applied directly to the wall surface with various stainless steel plates. Our construction approach requires that the wall leveling layer be particularly strong and flat, ensuring that stainless steel is bonded firmly to the wall. The finish edge gap of the stainless steel plate is sealed with silicone.\n<\/p>\n\n\n\n<p><strong><em>03.<\/em><\/strong>\n  <br>\n<\/p>\n\n\n\n<p><strong>Tile installation works &#8211;<\/strong> <strong>12<\/strong> <strong>items<\/strong> in <strong>total<\/strong>\n<\/p>\n\n\n\n<p><strong>1. Pipe masonry<\/strong> <strong>:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"644\" height=\"568\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-490.png\" alt=\"\" class=\"wp-image-3397\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-490.png 644w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-490-300x265.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-490-600x529.png 600w\" sizes=\"(max-width: 644px) 100vw, 644px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"450\" height=\"274\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-259.jpeg\" alt=\"\" class=\"wp-image-3398\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-259.jpeg 450w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-259-300x183.jpeg 300w\" sizes=\"(max-width: 450px) 100vw, 450px\" \/><\/figure>\n\n\n\n<p>   A real-life picture of the pipe wall masonry <\/p>\n\n\n\n<p><strong>2. Now pouring the guide wall:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"735\" height=\"321\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-491.png\" alt=\"\" class=\"wp-image-3399\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-491.png 735w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-491-300x131.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-491-600x262.png 600w\" sizes=\"(max-width: 735px) 100vw, 735px\" \/><\/figure>\n\n\n\n<p>\n  Now pour the wall node diagram\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"458\" height=\"219\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-260.jpeg\" alt=\"\" class=\"wp-image-3400\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-260.jpeg 458w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-260-300x143.jpeg 300w\" sizes=\"(max-width: 458px) 100vw, 458px\" \/><\/figure>\n\n\n\n<p>\n  Now pour the wall reality picture\n<\/p>\n\n\n\n<p><strong>3. Now watering the beam:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"878\" height=\"454\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-492.png\" alt=\"\" class=\"wp-image-3401\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-492.png 878w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-492-300x155.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-492-768x397.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-492-600x310.png 600w\" sizes=\"(max-width: 878px) 100vw, 878px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"459\" height=\"316\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-261.jpeg\" alt=\"\" class=\"wp-image-3402\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-261.jpeg 459w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-261-300x207.jpeg 300w\" sizes=\"(max-width: 459px) 100vw, 459px\" \/><\/figure>\n\n\n\n<p>\n  Now pouring the door over the beam reality picture\n<\/p>\n\n\n\n<p><strong>4. Wall flour brush:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1026\" height=\"532\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-493.png\" alt=\"\" class=\"wp-image-3403\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-493.png 1026w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-493-300x156.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-493-1024x531.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-493-768x398.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-493-600x311.png 600w\" sizes=\"(max-width: 1026px) 100vw, 1026px\" \/><\/figure>\n\n\n\n<p><strong>5.JS Waterproof:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"766\" height=\"366\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-494.png\" alt=\"\" class=\"wp-image-3404\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-494.png 766w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-494-300x143.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-494-600x287.png 600w\" sizes=\"(max-width: 766px) 100vw, 766px\" \/><\/figure>\n\n\n\n<p>\n  JS waterproof layer node \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"415\" height=\"155\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-262.jpeg\" alt=\"\" class=\"wp-image-3405\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-262.jpeg 415w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-262-300x112.jpeg 300w\" sizes=\"(max-width: 415px) 100vw, 415px\" \/><\/figure>\n\n\n\n<p>\n  JS Paints The Real Picture \n<\/p>\n\n\n\n<p><strong>6. Flattening of the floor:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"556\" height=\"373\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-495.png\" alt=\"\" class=\"wp-image-3406\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-495.png 556w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-495-300x201.png 300w\" sizes=\"(max-width: 556px) 100vw, 556px\" \/><\/figure>\n\n\n\n<p>\n  Ground leveling node graph\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"490\" height=\"250\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-263.jpeg\" alt=\"\" class=\"wp-image-3407\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-263.jpeg 490w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-263-300x153.jpeg 300w\" sizes=\"(max-width: 490px) 100vw, 490px\" \/><\/figure>\n\n\n\n<p>\n  The ground is looking for a flat reality map\n<\/p>\n\n\n\n<p><strong>7. Wall tile stickers:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"663\" height=\"375\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-496.png\" alt=\"\" class=\"wp-image-3408\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-496.png 663w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-496-300x170.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-496-600x339.png 600w\" sizes=\"(max-width: 663px) 100vw, 663px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"382\" height=\"205\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-264.jpeg\" alt=\"\" class=\"wp-image-3409\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-264.jpeg 382w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-264-300x161.jpeg 300w\" sizes=\"(max-width: 382px) 100vw, 382px\" \/><\/figure>\n\n\n\n<p>\n  The wall tiles are covered with a realistic picture\n<\/p>\n\n\n\n<p><strong>8. Mosaic Sticker:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"449\" height=\"375\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-497.png\" alt=\"\" class=\"wp-image-3410\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-497.png 449w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-497-300x251.png 300w\" sizes=\"(max-width: 449px) 100vw, 449px\" \/><\/figure>\n\n\n\n<p>\n  Mosaic node details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"351\" height=\"335\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-265.jpeg\" alt=\"\" class=\"wp-image-3411\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-265.jpeg 351w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-265-300x286.jpeg 300w\" sizes=\"(max-width: 351px) 100vw, 351px\" \/><\/figure>\n\n\n\n<p>\n  Mosaics are paved with realistic pictures\n<\/p>\n\n\n\n<p><strong>9. Marble window sill installation:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"774\" height=\"848\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-266.jpeg\" alt=\"\" class=\"wp-image-3412\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-266.jpeg 774w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-266-274x300.jpeg 274w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-266-768x841.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-266-600x657.jpeg 600w\" sizes=\"(max-width: 774px) 100vw, 774px\" \/><\/figure>\n\n\n\n<p>\n  Marble window sill node\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"924\" height=\"523\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-267.jpeg\" alt=\"\" class=\"wp-image-3413\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-267.jpeg 924w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-267-300x170.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-267-768x435.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-267-600x340.jpeg 600w\" sizes=\"(max-width: 924px) 100vw, 924px\" \/><\/figure>\n\n\n\n<p><strong>11. Marble sill installation:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"649\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-268.jpeg\" alt=\"\" class=\"wp-image-3414\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-268.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-268-300x180.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-268-1024x615.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-268-768x462.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-268-600x361.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Marble threshold node\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"871\" height=\"749\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-269.jpeg\" alt=\"\" class=\"wp-image-3415\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-269.jpeg 871w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-269-300x258.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-269-768x660.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-269-600x516.jpeg 600w\" sizes=\"(max-width: 871px) 100vw, 871px\" \/><\/figure>\n\n\n\n<p><strong>12. Marble water barrier installation:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"996\" height=\"791\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-270.jpeg\" alt=\"\" class=\"wp-image-3416\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-270.jpeg 996w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-270-300x238.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-270-768x610.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-270-600x477.jpeg 600w\" sizes=\"(max-width: 996px) 100vw, 996px\" \/><\/figure>\n\n\n\n<p>\n  Marble water-blocking tank detailed node\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"440\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-271.jpeg\" alt=\"\" class=\"wp-image-3417\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-271.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-271-300x122.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-271-1024x417.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-271-768x313.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-271-600x244.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong><em>04.<\/em><\/strong>\n  <br>\n<\/p>\n\n\n\n<p><strong>Painting works<\/strong>\n<\/p>\n\n\n\n<p><strong>1. Powder repair:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1076\" height=\"525\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-272.jpeg\" alt=\"\" class=\"wp-image-3418\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-272.jpeg 1076w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-272-300x146.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-272-1024x500.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-272-768x375.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-272-600x293.jpeg 600w\" sizes=\"(max-width: 1076px) 100vw, 1076px\" \/><\/figure>\n\n\n\n<p>\n  Process control requirements:\n<\/p>\n\n\n\n<p>   1) When cutting the wall groove and peeling off the original paint layer, the edge must first be tilted inward with the cutting. The wall groove must remove the floating sand in the groove before placing the pipe, and the pipe-fixed fastness of the wall groove must be checked before it is sealed, and must be reinforced if loose.  <\/p>\n\n\n\n<p>\n  3) The ash construction must be completed two to three times, not allowed to finish work once, head scraping should master the principle of the first four weeks after the middle, thickness master must not &gt; 5mm. Cement mortar surface after the basic water collection must be used wood smear and then compacted with iron plate, such as the wall to be paved with wall tiles must be added another wood smudge process.  \n<\/p>\n\n\n\n<p>   5) Block walls and concrete walls apply pure cement pulp before plastering to ensure bonding force. At the junction of new and old walls, the grassroots should be equipped with 300mm wide wire mesh plates to avoid cracks in the future.  <\/p>\n\n\n\n<p>   7) The original wall crack repair can be peeled along both sides of the cracks 400 to 500 wide, plus 300mm wire mesh before the ash work. Walls with doors must first be embedded with 1:2 cement mortar.    <\/p>\n\n\n\n<p><strong>2. Grassroots<\/strong> <strong>treatment:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"284\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-273.jpeg\" alt=\"\" class=\"wp-image-3419\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-273.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-273-300x79.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-273-1024x269.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-273-768x202.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-273-600x158.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Grassroots treatment\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"622\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-274.jpeg\" alt=\"\" class=\"wp-image-3420\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-274.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-274-300x173.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-274-1024x590.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-274-768x442.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-274-600x346.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Yin and Yang angle correction\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"514\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-275.jpeg\" alt=\"\" class=\"wp-image-3421\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-275.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-275-300x143.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-275-1024x487.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-275-768x366.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-275-600x286.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Putty batch inlay\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"428\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-276.jpeg\" alt=\"\" class=\"wp-image-3422\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-276.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-276-300x119.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-276-1024x406.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-276-768x304.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-276-600x238.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Paint Engineering\n<\/p>\n\n\n\n<p><strong><em>05.<\/em><\/strong>\n  <br>\n<\/p>\n\n\n\n<p><strong>Supporting installation works<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"952\" height=\"792\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-277.jpeg\" alt=\"\" class=\"wp-image-3423\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-277.jpeg 952w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-277-300x250.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-277-768x639.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-277-600x499.jpeg 600w\" sizes=\"(max-width: 952px) 100vw, 952px\" \/><\/figure>\n\n\n\n<p>\n  Supporting works: Insulation board node details\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"993\" height=\"799\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-278.jpeg\" alt=\"\" class=\"wp-image-3424\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-278.jpeg 993w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-278-300x241.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-278-768x618.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-278-600x483.jpeg 600w\" sizes=\"(max-width: 993px) 100vw, 993px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"1176\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-279.jpeg\" alt=\"\" class=\"wp-image-3425\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-279.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-279-276x300.jpeg 276w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-279-940x1024.jpeg 940w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-279-768x836.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-279-600x653.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Interior finishing process control process(53 cases nod [&hellip;]<\/p>","protected":false},"author":1,"featured_media":3358,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[64],"tags":[],"class_list":["post-3341","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-process-technology"],"_links":{"self":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3341","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/comments?post=3341"}],"version-history":[{"count":0,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3341\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media\/3358"}],"wp:attachment":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media?parent=3341"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/categories?post=3341"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/tags?post=3341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}