{"id":3510,"date":"2021-11-04T16:24:51","date_gmt":"2021-11-04T08:24:51","guid":{"rendered":"https:\/\/epcpmo.com\/?p=3510"},"modified":"2022-09-11T15:15:32","modified_gmt":"2022-09-11T07:15:32","slug":"ways-and-methods-of-project-bidding","status":"publish","type":"post","link":"https:\/\/epcpmo.com\/en\/ways-and-methods-of-project-bidding\/","title":{"rendered":"Ways and methods of project bidding"},"content":{"rendered":"<h4 class=\"wp-block-heading\"><a id=\"post-3510-activity-name\"><\/a><a id=\"post-3510-img-content\"><\/a><a id=\"post-3510-page-content\"><\/a><a id=\"post-3510-js_article\"><\/a>How can bidding for tens of millions of construction projects be destroyed on the tender? The way to fix the label is all here! <\/h4>\n\n\n\n<p><a id=\"post-3510-js_content\"><\/a>   For tenders\/tenders, nothing is more painful than working overtime to stay up late to make tenders, the site less than 2 minutes to scrap. We have studied many cases of tender failure, <strong>found that most of<\/strong> the <strong>&#8220;abandoned bid&#8221;<\/strong>  <strong>is due<\/strong> to  <strong>&#8220;insufficient<\/strong> <strong>in-depth study of tender documents, unclear grasp of the focus of the tender, the company team professionalism reflects insufficient, the details of mishandling&#8221;<\/strong>  resulting in the scrapping of the bid.  <\/p>\n\n\n\n<p><strong>What should I do with a good label plan? <\/strong>\n<\/p>\n\n\n\n<p><strong>Why are so many large-scale companies bidding &#8220;<\/strong> <strong>repeatedly in the middle<\/strong> of the project <strong>&#8220;? <\/strong>\n<\/p>\n\n\n\n<p><strong>What is the most important &#8220;bonus<\/strong> <strong>item&#8221;<\/strong> for <strong>Party A?<\/strong> <strong> <\/strong>\n<\/p>\n\n\n\n<p><strong>How to do a good job of the description? Let&#8217;s talk to you about the following:<\/strong>\n<\/p>\n\n\n\n<p><strong>The whole process of the project description is explained from the following aspects<\/strong> <\/p>\n\n\n\n<p><strong>First, the project management team structure<\/strong>\n<\/p>\n\n\n\n<p>\n  Project team architecture diagram\n<\/p>\n\n\n\n<p>\n  The professional competence of the project team is reflected\n<\/p>\n\n\n\n<p><strong>Second, the project overview<\/strong>\n<\/p>\n\n\n\n<p>\n  The overall project understanding and the company&#8217;s attention, management objectives\n<\/p>\n\n\n\n<p><strong>Third, combined with drawings and the scene to do a good job of early deepening work<\/strong>\n<\/p>\n\n\n\n<p>\n  Deepening thinking and direction\n<\/p>\n\n\n\n<p>\n  Drill down nodes and big samples\n<\/p>\n\n\n\n<p>\n  Deepen the integration point\n<\/p>\n\n\n\n<p><strong>Fourth, the construction of key difficulties analysis and solution measures<\/strong>\n<\/p>\n\n\n\n<p>\n  Several key difficulties are analyzed according to the characteristics of the project (in this issue we take the anti-cracking, anti-aircraft drum, anti-leakage as examples in &#8216;Three Defenses&#8217;).\n<\/p>\n\n\n\n<p><strong>Fifth, professional and technical support<\/strong>\n<\/p>\n\n\n\n<p>\n  Application of 3D scanning technology\n<\/p>\n\n\n\n<p>\n  Lighting design\n<\/p>\n\n\n\n<p>\n  The use of BIM systems\n<\/p>\n\n\n\n<p>\n  The use of remote monitoring\n<\/p>\n\n\n\n<p><strong>Six, emphasize the total package with<\/strong> <strong>management<\/strong>\n<\/p>\n\n\n\n<p>\n  Project resource integration\n<\/p>\n\n\n\n<p>\n  Coordinate subcontracting\n<\/p>\n\n\n\n<p><strong>Seven, construction progress, quality, safety management ideas<\/strong>\n<\/p>\n\n\n\n<p>\n  Project management process\n<\/p>\n\n\n\n<p>\n  Safe and civilized management\n<\/p>\n\n\n\n<p>\n  Progress management\n<\/p>\n\n\n\n<p>\n  quality control\n<\/p>\n\n\n\n<p><strong>Eight, the company&#8217;s service support for the project<\/strong>\n<\/p>\n\n\n\n<p>\n  Support from the management team\n<\/p>\n\n\n\n<p>\n  Technically qualified management support\n  <br>\n<\/p>\n\n\n\n<p><strong>With these aspects in hand, let&#8217;s share a set of &#8220;Report<\/strong> <strong>Success Stories&#8221;<\/strong> with you<strong>. <\/strong> <\/p>\n\n\n\n<p><strong>01<\/strong>\n<\/p>\n\n\n\n<p><strong>Management structure<\/strong>\n<\/p>\n\n\n\n<p>   My company will send the company&#8217;s leadership supervision, and sent my company decoration experience is extremely rich, and has similar performance decoration projects such as XXXX international hotel decoration engineering construction experience xxx as the executive project manager, the professional knowledge of the first-level mechanical and electrical builder xxx as executive manager, won the Luban Award project xxxx  Xxx, a supporting project, leads the entire project management team as the project manager to undertake the construction of the project.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1080\" height=\"636\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-548.png\" alt=\"\" class=\"wp-image-3512\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-548.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-548-300x177.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-548-1024x603.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-548-768x452.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-548-600x353.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img decoding=\"async\" width=\"1080\" height=\"514\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-307.jpeg\" alt=\"\" class=\"wp-image-3513\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-307.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-307-300x143.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-307-1024x487.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-307-768x366.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-307-600x286.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Management Structure\n<\/p>\n\n\n\n<p><strong>02<\/strong>\n<\/p>\n\n\n\n<p><strong>Engineering overview<\/strong>\n<\/p>\n\n\n\n<p>   The xxx project is the first to enter a first-tier city in southern China and is of great significance to your strategic layout. Division I attaches great importance to this project, the company set up a special working group at the top, and assigned the first-class level, with relevant rich experience of the lean team to manage the implementation.  Strive for the two sides of the first project cooperation to create a boutique project.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img decoding=\"async\" width=\"820\" height=\"582\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-549.png\" alt=\"\" class=\"wp-image-3514\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-549.png 820w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-549-300x213.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-549-768x545.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-549-600x426.png 600w\" sizes=\"(max-width: 820px) 100vw, 820px\" \/><\/figure>\n\n\n\n<p><strong>03<\/strong>\n<\/p>\n\n\n\n<p><strong>Deepen the design and management system<\/strong>\n<\/p>\n\n\n\n<p><strong>1, deepen the overall design ideas and direction<\/strong>\n<\/p>\n\n\n\n<p>   Analyze the key difficulties of the project construction, organize the list of problems, and finally, by deepening the design of 3D modeling optimization, the development of construction plans, the implementation of the technical bottom.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"579\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-550.png\" alt=\"\" class=\"wp-image-3515\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-550.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-550-300x161.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-550-1024x549.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-550-768x412.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-550-600x322.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2, deepen the design of the purpose and requirements<\/strong>\n<\/p>\n\n\n\n<p><strong>Drawing deepening process:<\/strong> clear completion surface size, grass-roots finish surface size, grass-roots materials, different material interface closing relationship, different materials grass-roots finish face control size.  \n<\/p>\n\n\n\n<p>\n  Under the premise of fully understanding the design intention, perfect the <strong>ominous, unworkable and unreasonable node closing scheme of the construction<\/strong> drawings. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"733\" height=\"676\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-551.png\" alt=\"\" class=\"wp-image-3516\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-551.png 733w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-551-300x277.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-551-600x553.png 600w\" sizes=\"(max-width: 733px) 100vw, 733px\" \/><\/figure>\n\n\n\n<p>\n  According to the node closing drawings drawn above, the corresponding <strong>grass-roots practices and clear grass-roots materials<\/strong> (the types of sheets can be distinguished according to the pattern fill). \n<\/p>\n\n\n\n<p>   Recommendations | We are <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247518154&amp;idx=1&amp;sn=ae237a23336276db9f452b7318056ead&amp;scene=21#wechat_redirect\">\u261e, &#8220;What grass-roots material construction processes should resident deepening designers be familiar with?&#8221; This <\/a>article explains in detail the basic materials technology.  <\/p>\n\n\n\n<p><strong>Comprehensive cloth point mapping,<\/strong> for multi-professional coordination and orderly construction to create conditions, integrated cloth points are divided into wall ground cloth points and top surface integrated cloth points. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"586\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-552.png\" alt=\"\" class=\"wp-image-3517\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-552.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-552-300x163.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-552-1024x556.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-552-768x417.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-552-600x326.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>04<\/strong>\n<\/p>\n\n\n\n<p><strong>Construction key difficulties analysis and solution measures<\/strong>\n<\/p>\n\n\n\n<p>   Several important key points control in the construction process of the project, according to our experience in construction management, which is very important difficulty control here is summarized as &#8221;three defense&#8217;, &#8216;three defense&#8217;  in the anti-cracking, anti-aircraft drum, anti-leakage can be said to be the most important for the construction process.  <\/p>\n\n\n\n<p><strong>1, wall cracking smallpox cracking why is difficult to solve? <\/strong>\n<\/p>\n\n\n\n<p>\n  Wall paint cracking, top corner cracking is the most important quality control point of fine decoration, fine decoration wall top surface is a large area of latex paint finish, if the grass-roots slightly improper construction, will cause a large area cracking, resulting in a large area of rework phenomenon, is a great loss to the project.\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"924\" height=\"369\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-308.jpeg\" alt=\"\" class=\"wp-image-3518\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-308.jpeg 924w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-308-300x120.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-308-768x307.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-308-600x240.jpeg 600w\" sizes=\"(max-width: 924px) 100vw, 924px\" \/><\/figure>\n\n\n\n<p>   First of all, whether the top surface cracking or wall cracking, one of the common external causes of their cracking is after the construction of the building settlement is stable? Is the junction processing of civil secondary structure reasonable? <\/p>\n\n\n\n<p><strong>&#8220;Settling&#8221;<\/strong>  is the vertical deformation or subsidence of <strong>the foundation soil caused by<\/strong> compression under the action of building <strong>load.<\/strong> <strong> <\/strong>\n<\/p>\n\n\n\n<p>   Uneven settlement is more harmful to the building, will cause additional stress on the building and cause cracks, and even local components break, endangering the safety of the building, etc., the project department should get the relevant departments before the project building subsidence observation data, to ensure that it will not affect the decoration construction can be carried out normally. <\/p>\n\n\n\n<p><strong>In addition to external factors, the elements that effectively control the cracking of the wall, let&#8217;s talk to you about 3<\/strong> <strong>points. <\/strong>\n<\/p>\n\n\n\n<p><strong>(1) To solve the material&#8217;s <\/strong>shortcomings: such as the lack of adhesion of the grass-roots material, the surface base material being too dry, wet, or the wall base material being too smooth, cement mortar raw materials are not qualified, and so on.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"613\" height=\"243\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-309.jpeg\" alt=\"\" class=\"wp-image-3519\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-309.jpeg 613w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-309-300x119.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-309-600x238.jpeg 600w\" sizes=\"(max-width: 613px) 100vw, 613px\" \/><\/figure>\n\n\n\n<p><strong>2, the standard construction process is improper:<\/strong> such as improper bottoming in the construction, wall plastering did not according to the requirements of the net processing, super-thick plaster, not secondary hanging net, not timely water conservation, and so on.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"578\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-310.jpeg\" alt=\"\" class=\"wp-image-3520\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-310.jpeg 800w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-310-300x217.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-310-768x555.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-310-600x434.jpeg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<p><strong>3, do a good job in the construction site environmental maintenance:<\/strong> multi-job simultaneous work when the uncoordinated decorative construction process errors, interference with each other, resulting in the wall has completed the ash layer by the surrounding construction operations to shock, impact, fracking, cracking,  so the protection of finished products need timely maintenance. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"424\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-311.jpeg\" alt=\"\" class=\"wp-image-3521\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-311.jpeg 640w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-311-300x199.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-311-600x398.jpeg 600w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p><strong>And you summarize the preventive measures mentioned above, in terms of materials, construction details, the content of the mind map is more detailed:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"722\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-312.jpeg\" alt=\"\" class=\"wp-image-3522\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-312.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-312-300x201.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-312-1024x685.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-312-768x513.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-312-600x401.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2, the owner likes to use<\/strong> <strong>glass<\/strong> <strong>brick, but empty drum problem how to do? <\/strong>\n<\/p>\n\n\n\n<p>   In hardcover repair projects, glass brick is often the owner&#8217;s priority surface material, but because glass brick construction is prone to empty drums, shedding, and other phenomena, but also over the years decoration works a piece of heart disease.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"561\" height=\"498\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-313.jpeg\" alt=\"\" class=\"wp-image-3523\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-313.jpeg 561w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-313-300x266.jpeg 300w\" sizes=\"(max-width: 561px) 100vw, 561px\" \/><\/figure>\n\n\n\n<p><strong>It is divided<\/strong> into three <strong>main areas:<\/strong>\n<\/p>\n\n\n\n<p><strong>(1) From the material properties, grass-roots treatment, construction points,<\/strong> and what you analyze as what glass brick difficult to bond, easy to produce empty drum, shedding, arch cracking, and other common causes of quality.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"479\" height=\"653\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-314.jpeg\" alt=\"\" class=\"wp-image-3524\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-314.jpeg 479w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-314-220x300.jpeg 220w\" sizes=\"(max-width: 479px) 100vw, 479px\" \/><\/figure>\n\n\n\n<p><strong>(2) <\/strong>Understand the &#8220;Difference between glass tiles and ordinary tiles&#8221; &#8220;The difference between tile binders and cement mortar&#8221; &#8220;Adhesives, back glues, sewing agent selection&#8221;. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"594\" height=\"299\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-553.png\" alt=\"\" class=\"wp-image-3525\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-553.png 594w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-553-300x151.png 300w\" sizes=\"(max-width: 594px) 100vw, 594px\" \/><\/figure>\n\n\n\n<p><strong>(3) 7<\/strong> aspects <strong>of the construction points<\/strong> <strong>analysis,<\/strong> respectively, the sticker control points, grass-roots treatment, adhesive treatment, method analysis, seam retention treatment, construction environment requirements, and technical management processes; <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"632\" height=\"1263\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-315.jpeg\" alt=\"\" class=\"wp-image-3526\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-315.jpeg 632w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-315-150x300.jpeg 150w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-315-512x1024.jpeg 512w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-315-600x1199.jpeg 600w\" sizes=\"(max-width: 632px) 100vw, 632px\" \/><\/figure>\n\n\n\n<p><strong>About the<\/strong> <strong>glass<\/strong> <strong>brick quality empty drum problem, below and you summarize<\/strong> the <strong>glass<\/strong> <strong>brick empty drum prevention key nodes:<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"862\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-316.jpeg\" alt=\"\" class=\"wp-image-3527\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-316.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-316-300x239.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-316-1024x817.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-316-768x613.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-316-600x479.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>3, the bathroom area how to pre-control<\/strong> the <strong>&#8220;leak&#8221;<\/strong>   <strong>problem? <\/strong> <\/p>\n\n\n\n<p>   Waterproofing project is an important part of construction engineering, especially the quality of toilet waterproofing project, which directly affects the life of buildings and structures, follow-up rework, maintenance bring endless distress. <\/p>\n\n\n\n<p><strong>In the actual waterproofing project, the effect of construction operation factors on the quality of the waterproof layer is becoming more and more significant<\/strong> <\/p>\n\n\n\n<p>   If the grass-roots treatment, waterproof paint mixing, coating, maintenance, and other aspects of improper treatment, it is very easy to appear waterproof layer cracking, foaming, pinholes, peeling, powdering, breakage, and other issues, to the waterproof layer quality, has a great negative impact.   <br> <\/p>\n\n\n\n<p>\n  The same layer in the waterproofing process requirements will do grass-roots clean-up, yin angle need to do arc treatment, water does not leak seal, new and old wall sewing mesh cloth\n<\/p>\n\n\n\n<p>   The waterproof control point requires the threshold to use a water-stopping belt brush waterproof, waterproof brush to the dry area (walkway) and turn 30MM, ground leakage position processed into a funnel-like, shower room water belt, and so on.  <\/p>\n\n\n\n<p><strong>But waterproofing engineering is a systematic project, design, materials, construction, management of these aspects will have an impact on the quality of waterproofing. <\/strong>\n<\/p>\n\n\n\n<p><strong>After analyzing the waterproof breakdown, here&#8217;s a summary with you:<\/strong>\n<\/p>\n\n\n\n<p><strong>05<\/strong>\n<\/p>\n\n\n\n<p><strong>Support for technical expertise<\/strong>\n<\/p>\n\n\n\n<p><strong>1, the application of 3D scanning technology<\/strong>\n<\/p>\n\n\n\n<p>\n  The point cloud display after the scan file is imported into the REVIT software. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"924\" height=\"516\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-554.png\" alt=\"\" class=\"wp-image-3528\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-554.png 924w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-554-300x168.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-554-768x429.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-554-600x335.png 600w\" sizes=\"(max-width: 924px) 100vw, 924px\" \/><\/figure>\n\n\n\n<p>   Through the software, synthesis is very intuitive to find the field structure and floor to highlight the decorative design finish surface. <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"806\" height=\"454\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-555.png\" alt=\"\" class=\"wp-image-3529\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-555.png 806w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-555-300x169.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-555-768x433.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-555-600x338.png 600w\" sizes=\"(max-width: 806px) 100vw, 806px\" \/><\/figure>\n\n\n\n<p><strong>2, lighting design<\/strong>\n<\/p>\n\n\n\n<p>   Lighting is one of the important components of commercial space, effective lighting design can attract and guide the eyes of consumers, to create a comfortable, safe and harmonious lighting environment. Through the creation of each space light environment and consumers communicate emotional exchanges. <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"956\" height=\"310\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-556.png\" alt=\"\" class=\"wp-image-3530\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-556.png 956w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-556-300x97.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-556-768x249.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-556-600x195.png 600w\" sizes=\"(max-width: 956px) 100vw, 956px\" \/><\/figure>\n\n\n\n<p><strong>3, the use<\/strong> of<strong>BIM<\/strong> <strong>system<\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"532\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-557.png\" alt=\"\" class=\"wp-image-3531\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-557.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-557-300x148.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-557-1024x504.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-557-768x378.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-557-600x296.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>Collision check:<\/strong> Refers to finding and reporting conflicts between different parts of an engineering project in advance. \n<\/p>\n\n\n\n<p>   Collision points Hard collision and soft collision (gap collision) are two kinds, hard collision refers to the cross-collision between solid and solid, soft collision refers to the actual collision between solids, but the spacing and space can not meet the relevant construction requirements.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"790\" height=\"487\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-558.png\" alt=\"\" class=\"wp-image-3532\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-558.png 790w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-558-300x185.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-558-768x473.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-558-600x370.png 600w\" sizes=\"(max-width: 790px) 100vw, 790px\" \/><\/figure>\n\n\n\n<p>\n  Pre-check the problem and pay attention to checking the site height\n<\/p>\n\n\n\n<p>\n  Left:2830,right:2840\n<\/p>\n\n\n\n<p>\n  Required top height:3000 plus construction space \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"969\" height=\"559\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-559.png\" alt=\"\" class=\"wp-image-3533\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-559.png 969w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-559-300x173.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-559-768x443.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-559-600x346.png 600w\" sizes=\"(max-width: 969px) 100vw, 969px\" \/><\/figure>\n\n\n\n<p>\n  Multi-line BIM collision simulation in smallpox\n<\/p>\n\n\n\n<p><strong>4, the use of remote monitoring<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"567\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-560.png\" alt=\"\" class=\"wp-image-3534\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-560.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-560-300x158.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-560-1024x538.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-560-768x403.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-560-600x315.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>06<\/strong>\n<\/p>\n\n\n\n<p><strong>The total package is managed in conjunction with the management<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"935\" height=\"585\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-561.png\" alt=\"\" class=\"wp-image-3535\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-561.png 935w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-561-300x188.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-561-768x481.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-561-600x375.png 600w\" sizes=\"(max-width: 935px) 100vw, 935px\" \/><\/figure>\n\n\n\n<p>\n  Organizational structure\n<\/p>\n\n\n\n<p><strong>1, project resource integration<\/strong>\n<\/p>\n\n\n\n<p>   This project involves structural transformation, air conditioning, fire protection, strong and weak electricity, water supply and drainage, and other supporting projects. Division I will be the decorative general contracting status of the active integration of professional resources, to determine the following points: <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"378\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-562.png\" alt=\"\" class=\"wp-image-3536\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-562.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-562-300x105.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-562-1024x358.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-562-768x269.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-562-600x210.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2, professional docking<\/strong>\n<\/p>\n\n\n\n<p>\n  Total package single-bit set eight one-room, our department also set the corresponding responsible person docking, specific docking content see the table. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"619\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-563.png\" alt=\"\" class=\"wp-image-3537\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-563.png 600w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-563-291x300.png 291w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p><strong>3, coordinate subcontracting<\/strong>\n<\/p>\n\n\n\n<p>\n  Under the unified management of the total package, other subcontracting orders are required to complete the construction task according to the hardcover construction node,  and to line up the pipeline according to my mandatory positioning point. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"764\" height=\"584\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-564.png\" alt=\"\" class=\"wp-image-3538\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-564.png 764w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-564-300x229.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-564-600x459.png 600w\" sizes=\"(max-width: 764px) 100vw, 764px\" \/><\/figure>\n\n\n\n<p><strong>07<\/strong>\n<\/p>\n\n\n\n<p><strong>Construction progress, quality, safety control ideas<\/strong>\n<\/p>\n\n\n\n<p>\n  The whole process of using our company&#8217;s management system to organize the construction, the management system detailed construction process is divided into several stages, for the progress, quality, safety aspects of each phase of the work of the control focus and methods listed analysis, to ensure that the construction process clear thinking. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"605\" height=\"641\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-317.jpeg\" alt=\"\" class=\"wp-image-3539\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-317.jpeg 605w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-317-283x300.jpeg 283w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-317-600x636.jpeg 600w\" sizes=\"(max-width: 605px) 100vw, 605px\" \/><\/figure>\n\n\n\n<p><strong>1, project safety and civilized management<\/strong>\n  <br>\n<\/p>\n\n\n\n<p><strong>First of all, it is necessary to clarify the actual situation of the project;<\/strong> Each project varies depending on the volume\/nature\/category\/security objective requirements of the project, so the way\/methods of security management vary for different projects. It is particularly important to configure a reasonable security management team according to the actual situation of the project, to clarify the rights and responsibilities, to carry out zoning management\/focus management, and to clarify the safety objectives of the common project, to achieve &#8220;zero accident&#8221;.    <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"524\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-318.jpeg\" alt=\"\" class=\"wp-image-3540\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-318.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-318-300x146.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-318-1024x497.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-318-768x373.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-318-600x291.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>We should comb the key points and difficulties of project safety and civilization management according to the actual situation of each project.<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"591\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-319.jpeg\" alt=\"\" class=\"wp-image-3541\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-319.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-319-300x164.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-319-1024x560.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-319-768x420.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-319-600x328.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>To develop strict security planning;<\/strong> Including the security organization&#8217;s structural responsibility, the establishment of security management organization, full participation in security planning, everyone in the security management, responsibility to people;     \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"691\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320.jpeg\" alt=\"\" class=\"wp-image-3542\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320-300x192.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320-1024x655.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320-768x491.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-320-600x384.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Break down the key points of security planning: include\n<\/p>\n\n\n\n<p>   (1),fire operation;(2),climbing operations;(3),full of scaffolding;(4),implement management;(5),temporary electricity;(6),civilized construction; and other work of the specific arrangements and responsibilities.    <br> <\/p>\n\n\n\n<p>   The work and supervision of various safety management work on the construction site are carried out and the procedures and methods are clear. <\/p>\n\n\n\n<p>\n  In short, the core of safety construction management is to improve the management of human consciousness, in the premise of safety planning is the most important implementation.\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"542\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321.jpeg\" alt=\"\" class=\"wp-image-3543\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321-300x151.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321-1024x514.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321-768x385.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-321-600x301.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2, project progress management<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"569\" height=\"438\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-565.png\" alt=\"\" class=\"wp-image-3544\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-565.png 569w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-565-300x231.png 300w\" sizes=\"(max-width: 569px) 100vw, 569px\" \/><\/figure>\n\n\n\n<p>\n  &#8220;532&#8221; management ideas (grain and grass first, before not after)\n<\/p>\n\n\n\n<p><strong>&#8220;532&#8221; management ideas, specifically:<\/strong>\n<\/p>\n\n\n\n<p><strong>&#8220;5&#8221; &#8211; Treat every project as a job grab<\/strong>\n<\/p>\n\n\n\n<p>\n  All grass-roots and covert construction is completed, at least 50% of latex paint has been finished, with the next process such as stone, wallpaper, wood finish construction. \n<\/p>\n\n\n\n<p>   All surface material orders are completed (except for the replacement list), wood, stone, and other major surface materials began to partially install <\/p>\n\n\n\n<p><strong>&#8220;3&#8221; &#8211; order in advance, to ensure the processing cycle<\/strong>\n<\/p>\n\n\n\n<p>   Backfield wood and stone and other products processing can only generally account for about 30% of the total duration, to control the quality of processing, it is necessary to ensure a reasonable processing cycle, and ensure its necessary operational continuity, so the project department must place an order in advance, do a good job of prior communication, remove obstacles, such as design, material confirmation, line, order, bidding process.  <\/p>\n\n\n\n<p>   That is to say, our stone, wood finish, stainless steel, and other backyard processing products, must start in the middle and late stage, the basic completion of the middle and late period. Here 30% of the processing time can not be compressed, that is, the previous mention of the snatch order can not rob processing truth.  <\/p>\n\n\n\n<p><strong>&#8220;2&#8221; &#8211; eye the<\/strong> <strong>backfield, ranking order, quality assurance<\/strong>\n<\/p>\n\n\n\n<p>   Understanding as the workload, rather than the period, the installation period basically from the middle start, the middle and late stage of the end, the installation cycle should be roughly equivalent to the processing cycle, but the input of human resources is different; Guan Jian is at this time the site grass-roots need to be finished products, and with the relevant technical personnel to enter the back yard, to ensure processing progress, supervision of processing order, to ensure that every wholesale good is qualified products.  <\/p>\n\n\n\n<p><strong>3, project quality management<\/strong>\n<\/p>\n\n\n\n<p><strong>Why is quality management in management?<\/strong>\n<\/p>\n\n\n\n<p>   85% of quality management comes from managers, and project managers need to be active as team members to ensure that team members comply with the rules and processes associated with project management and use this as an opportunity to create a &#8220;quality-seeking&#8221;  work environment.  <\/p>\n\n\n\n<p><strong>Regarding project quality management, we have selected some content for you to consult in previous<\/strong> <strong>articles. <\/strong>\n<\/p>\n\n\n\n<p><strong>Five-step line-out method<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"868\" height=\"710\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322.jpeg\" alt=\"\" class=\"wp-image-3545\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322.jpeg 868w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322-300x245.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322-768x628.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-322-600x491.jpeg 600w\" sizes=\"(max-width: 868px) 100vw, 868px\" \/><\/figure>\n\n\n\n<p>   Recommendations | <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247518154&amp;idx=3&amp;sn=8f2637c3d333051e820d8ae78e492760&amp;scene=21#wechat_redirect\">\u261e&#8221;construction unit implementation<\/a> <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247518154&amp;idx=3&amp;sn=8f2637c3d333051e820d8ae78e492760&amp;scene=21#wechat_redirect\">&#8220;<\/a> <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247518154&amp;idx=3&amp;sn=8f2637c3d333051e820d8ae78e492760&amp;scene=21#wechat_redirect\">fine&#8221;<\/a>  <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247518154&amp;idx=3&amp;sn=8f2637c3d333051e820d8ae78e492760&amp;scene=21#wechat_redirect\">line, the project is ultimately increased costs or reduced costs? \u300b<\/a> <\/p>\n\n\n\n<p><strong>Quality of common diseases and prevention<\/strong>\n<\/p>\n\n\n\n<p>   When we accept the construction decoration project, the quality standard of the first project must meet the national decoration acceptance specifications, at the same time to meet the enterprise acceptance standards. Decorative enterprises to &#8220;fine&#8221;,    &#8220;fine&#8221; as the quality of the soul, leading, every detail, each node has strived for perfection.  <\/p>\n\n\n\n<p>\n  Recommendations | <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247519912&amp;idx=1&amp;sn=d090f8cffdfdd2affe2f440329e19840&amp;scene=21#wechat_redirect\">\u261e&#8221;fine decoration process control and common quality general disease prevention and control compilation, rather than repeated rectification, it is better<\/a> to do the right thing from <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247519912&amp;idx=1&amp;sn=d090f8cffdfdd2affe2f440329e19840&amp;scene=21#wechat_redirect\">the<\/a> <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247519912&amp;idx=1&amp;sn=d090f8cffdfdd2affe2f440329e19840&amp;scene=21#wechat_redirect\">beginning!&#8221; \u300b<\/a>\n<\/p>\n\n\n\n<p><strong>Product construction<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"864\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-566.png\" alt=\"\" class=\"wp-image-3546\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-566.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-566-300x240.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-566-1024x819.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-566-768x614.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-566-600x480.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Recommendations | <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247516652&amp;idx=1&amp;sn=3e39f6510e8953f74e32cdf5c826f951&amp;scene=21#wechat_redirect\">\u261ethe<\/a> <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247516652&amp;idx=1&amp;sn=3e39f6510e8953f74e32cdf5c826f951&amp;scene=21#wechat_redirect\">top 10<\/a> <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247516652&amp;idx=1&amp;sn=3e39f6510e8953f74e32cdf5c826f951&amp;scene=21#wechat_redirect\">workflows for<\/a>  <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247516652&amp;idx=1&amp;sn=3e39f6510e8953f74e32cdf5c826f951&amp;scene=21#wechat_redirect\">&#8220;Productized<\/a>  <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247516652&amp;idx=1&amp;sn=3e39f6510e8953f74e32cdf5c826f951&amp;scene=21#wechat_redirect\">Decorations.&#8221; Why are head-mounting companies transitioning to<\/a> <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247516652&amp;idx=1&amp;sn=3e39f6510e8953f74e32cdf5c826f951&amp;scene=21#wechat_redirect\">a &#8220;productized<\/a> <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247516652&amp;idx=1&amp;sn=3e39f6510e8953f74e32cdf5c826f951&amp;scene=21#wechat_redirect\">decoration&#8221;<\/a>  <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247516652&amp;idx=1&amp;sn=3e39f6510e8953f74e32cdf5c826f951&amp;scene=21#wechat_redirect\">management model? \u300b<\/a>\n<\/p>\n\n\n\n<p><strong>Forced intensive management<\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"198\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323.jpeg\" alt=\"\" class=\"wp-image-3547\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323.jpeg 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323-300x55.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323-1024x188.jpeg 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323-768x141.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-323-600x110.jpeg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>   Recommendations | <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247495956&amp;idx=1&amp;sn=82456368124f1c7be0f6fac907868fea&amp;scene=21#wechat_redirect\">\u261e&#8221;force finishing&#8221;,<\/a>  <a href=\"https:\/\/mp.weixin.qq.com\/s?__biz=MzI0MTU0NjU1MA==&amp;mid=2247495956&amp;idx=1&amp;sn=82456368124f1c7be0f6fac907868fea&amp;scene=21#wechat_redirect\">strictly observe the decoration project product quality of the last level! \u300b<\/a> <\/p>\n\n\n\n<p><strong>08<\/strong>\n<\/p>\n\n\n\n<p><strong>The company&#8217;s service support for the project<\/strong>\n<\/p>\n\n\n\n<p><strong>The high-quality design service team<\/strong> <\/p>\n\n\n\n<p>   For this project, the company will set up a professional deep design team, relying on deep professionalism and long-term practical experience, from a professional point of view, actively cooperating with the original design to do a good job of drawing deepening. Can be very good for the owners to provide deep-level design services.  <\/p>\n\n\n\n<p><strong>The advanced project management team<\/strong> <\/p>\n\n\n\n<p>   The company has several people registered first and second-level builders, project managers team, for each project to provide adequate performance and quality of personnel assurance. Over the years, the company has formed a sound construction management system, &#8220;productized decoration&#8221; and scientific &#8220;project management&#8221;  of the use of our project is a strong guarantee of success.  <\/p>\n\n\n\n<p><strong>Adequate labor security<\/strong> <\/p>\n\n\n\n<p>   Division I has a long-term cooperation team, adequate human resources. At the same time, according to the site situation promptly supplement, to ensure that the construction requirements of the project. <\/p>\n\n\n\n<p><strong>\u00b7\u00b7\u00b7\u00b7\u00b7\u00b7<\/strong>\n<\/p>\n\n\n\n<p><strong>09<\/strong>\n<\/p>\n\n\n\n<p><strong>summary<\/strong>\n<\/p>\n\n\n\n<p><strong>Project Manager&#8217;s<\/strong> <strong>Guide<\/strong> to Labeling Thinking\n<\/p>","protected":false},"excerpt":{"rendered":"<p>How can bidding for tens of millions of construction pr [&hellip;]<\/p>","protected":false},"author":1,"featured_media":3517,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[63,259],"tags":[],"class_list":["post-3510","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-259"],"_links":{"self":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3510","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/comments?post=3510"}],"version-history":[{"count":1,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3510\/revisions"}],"predecessor-version":[{"id":11186,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3510\/revisions\/11186"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media\/3517"}],"wp:attachment":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media?parent=3510"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/categories?post=3510"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/tags?post=3510"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}