{"id":3549,"date":"2021-11-04T16:31:58","date_gmt":"2021-11-04T08:31:58","guid":{"rendered":"https:\/\/epcpmo.com\/?p=3549"},"modified":"2021-11-04T16:31:59","modified_gmt":"2021-11-04T08:31:59","slug":"project-construction-plan-to-grab-the-schedule","status":"publish","type":"post","link":"https:\/\/epcpmo.com\/en\/project-construction-plan-to-grab-the-schedule\/","title":{"rendered":"Project construction plan to grab the schedule"},"content":{"rendered":"<h4 class=\"wp-block-heading\"><a id=\"post-3549-activity-name\"><\/a><a id=\"post-3549-img-content\"><\/a><a id=\"post-3549-page-content\"><\/a><a id=\"post-3549-js_article\"><\/a>4 Big Job Grabs, Are You Ready for It? Project preemption experience sharing<\/h4>\n\n\n\n<p><a id=\"post-3549-js_content\"><\/a> Senior project managers, deeper design, and construction staff who have long looked forward to the project know that almost 60% of projects are preemptive for a variety of reasons.<\/p>\n\n\n\n<p>Some due to <strong>the project design program rectification,<\/strong> or because of the project process personnel transfer <strong>adjustment,<\/strong> or because of the political task <strong>requiring the project to rob workers,<\/strong> the <strong>project disorderly management caused by the late rush,<\/strong> the end of the <strong>year rush<\/strong> is also a frequent occurrence.<\/p>\n\n\n\n<p>How to <strong>&#8220;squeeze time, free space, spell<\/strong> <strong>speed&#8221;<\/strong> of the project according to the central guiding ideology of the project construction organization design in the process of clear implementation of the project?<\/p>\n\n\n\n<p>About <strong>the rush to work time to face several engineering difficulties, how to achieve trilateral promotion, grasp the progress control points, annihilate the construction difficulties.<\/strong><\/p>\n\n\n\n<p><strong><em>01<\/em><\/strong><\/p>\n\n\n\n<p><strong>The overall idea of job-snatching<\/strong><\/p>\n\n\n\n<p><strong>1.1<\/strong><\/p>\n\n\n\n<p><strong>Rushing ideas<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img fetchpriority=\"high\" decoding=\"async\" width=\"726\" height=\"280\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-567.png\" alt=\"\" class=\"wp-image-3551\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-567.png 726w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-567-300x116.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-567-600x231.png 600w\" sizes=\"(max-width: 726px) 100vw, 726px\" \/><\/figure>\n\n\n\n<p>Due to the short duration, all plans must be completed on time to meet the schedule requirements.<\/p>\n\n\n\n<p><strong>1.2<\/strong><\/p>\n\n\n\n<p><strong>The determination of the overall schedule<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img decoding=\"async\" width=\"906\" height=\"592\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-568.png\" alt=\"\" class=\"wp-image-3552\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-568.png 906w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-568-300x196.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-568-768x502.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-568-600x392.png 600w\" sizes=\"(max-width: 906px) 100vw, 906px\" \/><\/figure>\n\n\n\n<p>Total schedule<\/p>\n\n\n\n<p>According to the node plan to refine the <strong>specific process construction plan<\/strong> for each period, to develop a rigorous and reasonable overall work schedule.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img decoding=\"async\" width=\"1080\" height=\"545\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-569.png\" alt=\"\" class=\"wp-image-3553\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-569.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-569-300x151.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-569-1024x517.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-569-768x388.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-569-600x303.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>The total schedule is adjusted, and the process is executed<\/p>\n\n\n\n<p><strong>The principle of pre-grabbing does not rob the late, rob the grass-roots<\/strong> <strong>do not rob the face layer. <\/strong><\/p>\n\n\n\n<p><strong>1.3<\/strong><\/p>\n\n\n\n<p><strong>Engineering difficulties and progress control points<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1079\" height=\"740\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-570.png\" alt=\"\" class=\"wp-image-3554\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-570.png 1079w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-570-300x206.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-570-1024x702.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-570-768x527.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-570-600x411.png 600w\" sizes=\"(max-width: 1079px) 100vw, 1079px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"537\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-571.png\" alt=\"\" class=\"wp-image-3555\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-571.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-571-300x149.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-571-1024x509.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-571-768x382.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-571-600x298.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>The overall duration of six months, three months of fine decoration, not only across the Spring Festival, winter construction, but also a typical <strong>side design, side deepening, side construction<\/strong> projects.<\/p>\n\n\n\n<p><strong><em>02<\/em><\/strong><\/p>\n\n\n\n<p><strong>Difficult measures to solve<\/strong><\/p>\n\n\n\n<p><strong>2.1<\/strong><\/p>\n\n\n\n<p><strong>Three-sided project<\/strong> <strong>how to advance? <\/strong><\/p>\n\n\n\n<p><strong>Three-sided: side design, side deepening, side construction<\/strong> project.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Measure 1:<\/strong> <strong>Early intervention, human-sea tactics<\/strong><\/li><\/ul>\n\n\n\n<p>1, early intervention, with the design institute to draw construction drawings; <\/p>\n\n\n\n<p>2, the peak of the number of deepening design up to 23 people;<\/p>\n\n\n\n<p>3, group management to improve the efficiency of deepening.<\/p>\n\n\n\n<p>Deepen the designers to work overtime at night<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Measure 2: Make a plan, responsibility to the person<\/strong><\/li><\/ul>\n\n\n\n<p>Group deepening schedule and joint manufacturers to place an order schedule (responsibility to person).<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Measure 3:BIM<\/strong> <strong>assist, quick order<\/strong><\/li><\/ul>\n\n\n\n<p>1, <strong>the establishment of a professional<\/strong> <strong>BIM<\/strong> <strong>team,<\/strong> the effect map is determined, then began to <strong>model<\/strong> the difficulties;<\/p>\n\n\n\n<p>2, after the model is completed, can find the closing error in <strong>time,<\/strong> can be faster and more intuitive to the designer to provide <strong>a solution, confirmation<\/strong> program;<\/p>\n\n\n\n<p>3, the use of modeling techniques to steel frame conversion layer and metal ceiling surface layer modeling, effectively reduces <strong>errors in construction, rework.<\/strong><\/p>\n\n\n\n<p>VIP lounge white copper stainless steel top surface model, soft film ceiling deepening map, soft film ceiling processing map<\/p>\n\n\n\n<p><strong>2.2<\/strong><\/p>\n\n\n\n<p><strong>How do I rush work in an ultra-short schedule?<\/strong><\/p>\n\n\n\n<p>After the project department analyzes the characteristics of the <strong>construction area and the project milestone node,<\/strong> it is confirmed that only the completion of the main channel can complete the construction task as required.<\/p>\n\n\n\n<p>Through the meeting area key line combing, determine the key nodes, according to the progress of the company trust all-round support, to ensure the key nodes.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>First, determine the main channel<\/strong><\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"824\" height=\"335\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-572.png\" alt=\"\" class=\"wp-image-3556\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-572.png 824w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-572-300x122.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-572-768x312.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-572-600x244.png 600w\" sizes=\"(max-width: 824px) 100vw, 824px\" \/><\/figure>\n\n\n\n<p>The red area is the main waterway, and the full-time responsible person shall be arranged according to the region<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Second, determine the key nodes<\/strong><\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"377\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-573.png\" alt=\"\" class=\"wp-image-3557\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-573.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-573-300x105.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-573-1024x357.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-573-768x268.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-573-600x209.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>The read operation is the top five key nodes in the critical line<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Third, determine the measures to ensure key nodes<\/strong><\/li><\/ul>\n\n\n\n<p><strong>1, to achieve more soldiers will be wide<\/strong> <\/p>\n\n\n\n<p>All work surface areas must be adequately staffed.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"645\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-574.png\" alt=\"\" class=\"wp-image-3558\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-574.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-574-300x179.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-574-1024x612.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-574-768x459.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-574-600x358.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>2, to achieve resource integration<\/strong><\/p>\n\n\n\n<p>Give priority to project experience and preemption capability suppliers to ensure the supply of materials.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"968\" height=\"693\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-575.png\" alt=\"\" class=\"wp-image-3559\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-575.png 968w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-575-300x215.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-575-768x550.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-575-600x430.png 600w\" sizes=\"(max-width: 968px) 100vw, 968px\" \/><\/figure>\n\n\n\n<p>Report materials according to the owner and environmental requirements Brand Table<\/p>\n\n\n\n<p><strong>3, to achieve the sample first<\/strong> <\/p>\n\n\n\n<p>Make a big plan to determine the tracker, responsible person, technical requirements, node completion time, etc.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"92\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-576.png\" alt=\"\" class=\"wp-image-3560\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-576.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-576-300x26.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-576-1024x87.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-576-768x65.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-576-600x51.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>If multiple proofings occur and the design intent is not met, the matter is personally watched by the project manager.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"438\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-577.png\" alt=\"\" class=\"wp-image-3561\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-577.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-577-300x122.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-577-1024x415.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-577-768x311.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-577-600x243.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>Proofing process<\/p>\n\n\n\n<p>In the process of model confirmation, deepening typography, modeling, backfield preparation, and site grass-roots construction are carried out simultaneously;<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"402\" height=\"360\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-578.png\" alt=\"\" class=\"wp-image-3562\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-578.png 402w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-578-300x269.png 300w\" sizes=\"(max-width: 402px) 100vw, 402px\" \/><\/figure>\n\n\n\n<p><strong>2.3<\/strong><\/p>\n\n\n\n<p><strong>How does the material cycle break through the routine?<\/strong><\/p>\n\n\n\n<p>Due to the project duration being very short, resulting in materials after the order material processing, installation time according to the regular winter <strong>construction, across the Spring Festival conditions simply can not be completed. <\/strong><\/p>\n\n\n\n<p>According to the design effect map, the amount of <strong>stone, metal,<\/strong> and hard packaging in the project is not always large, whether to control the supply, installation progress, and installation quality, will become the key to the project can be delivered on time and success.<\/p>\n\n\n\n<p>The Project Department <strong>identifies stone, metal, and hard packs as the main channel for the project<\/strong> materials.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Focus one:<\/strong> <strong>stone supply, installation measures<\/strong><\/li><\/ul>\n\n\n\n<p>The person in charge of the manufacturer signs <strong>a military writ<\/strong> (note penalty clause) as an attachment to the <strong>contract,<\/strong> which is supplied in strict accordance with the plan, otherwise, the contract will be held <strong>accountable.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"501\" height=\"278\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-579.png\" alt=\"\" class=\"wp-image-3563\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-579.png 501w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-579-300x166.png 300w\" sizes=\"(max-width: 501px) 100vw, 501px\" \/><\/figure>\n\n\n\n<p>The company&#8217;s engineering management department arranged a full-time material staff backfield tracking stone supply and quality, to ensure that the Spring Festival logistics stop before the arrival time.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"323\" height=\"169\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-580.png\" alt=\"\" class=\"wp-image-3564\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-580.png 323w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-580-300x157.png 300w\" sizes=\"(max-width: 323px) 100vw, 323px\" \/><\/figure>\n\n\n\n<p>Pick a large plate<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"325\" height=\"172\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-581.png\" alt=\"\" class=\"wp-image-3565\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-581.png 325w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-581-300x159.png 300w\" sizes=\"(max-width: 325px) 100vw, 325px\" \/><\/figure>\n\n\n\n<p>Cutting plate selection and backfield typography<\/p>\n\n\n\n<p>To ensure the duration, the wall, the ground every four teams at the same time flowing water construction.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"351\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-582.png\" alt=\"\" class=\"wp-image-3566\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-582.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-582-300x98.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-582-1024x333.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-582-768x250.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-582-600x195.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Focus two: metal (stainless steel) supply, installation measures<\/strong><\/li><\/ul>\n\n\n\n<p>Stainless steel project as the largest project volume, the construction of the most complex single project, to ensure the duration node and installation accuracy requirements, which the shape of the early molding, while the Spring Festival after the field overtime unified arrangements, by the head office engineering management department for backfield tracking and coordination.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1028\" height=\"623\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-583.png\" alt=\"\" class=\"wp-image-3567\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-583.png 1028w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-583-300x182.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-583-1024x621.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-583-768x465.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-583-600x364.png 600w\" sizes=\"(max-width: 1028px) 100vw, 1028px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1054\" height=\"537\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-584.png\" alt=\"\" class=\"wp-image-3568\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-584.png 1054w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-584-300x153.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-584-1024x522.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-584-768x391.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-584-600x306.png 600w\" sizes=\"(max-width: 1054px) 100vw, 1054px\" \/><\/figure>\n\n\n\n<p>Stainless steel supplier supply military writ<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Focus three: hard package supply, installation measures<\/strong><\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"881\" height=\"183\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-585.png\" alt=\"\" class=\"wp-image-3569\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-585.png 881w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-585-300x62.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-585-768x160.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-585-600x125.png 600w\" sizes=\"(max-width: 881px) 100vw, 881px\" \/><\/figure>\n\n\n\n<p>Project <strong>Hardpack<\/strong> engineering volume is high &#8211; most of the material is PVC material, TVOC and formaldehyde content is difficult to meet the standard.<\/p>\n\n\n\n<p>Project <strong>Environmental requirements are high<\/strong> &#8211; national standard formaldehyde standard 0.08mg\/m2h,on-site requirements 0.02mg\/m2h.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1079\" height=\"409\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-586.png\" alt=\"\" class=\"wp-image-3570\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-586.png 1079w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-586-300x114.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-586-1024x388.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-586-768x291.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-586-600x227.png 600w\" sizes=\"(max-width: 1079px) 100vw, 1079px\" \/><\/figure>\n\n\n\n<p>State inspection sampling of the wall cloth testing is not qualified, resulting in the hard package cloth work being suspended.<\/p>\n\n\n\n<p>If the re-inspection results are still not qualified, may face re-selection of cloth, production, and processing, the duration is difficult to guarantee.<\/p>\n\n\n\n<p>In the face of this issue, the Project Decided:<\/p>\n\n\n\n<p>1, please lead the company <strong>stationed manufacturers,<\/strong> coordinate manufacturers to increase the intensity of measures;<\/p>\n\n\n\n<p>2, invite the inspection group <strong>experts to the backfield to guide<\/strong> the improvement measures;<\/p>\n\n\n\n<p>3, the company material supply line to find a ready replacement manufacturer<strong>,<\/strong> under the conditions of coordination of other programs.<\/p>\n\n\n\n<p>After all the efforts of all parties, the final fabric sampling all qualified.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"428\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-587.png\" alt=\"\" class=\"wp-image-3571\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-587.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-587-300x119.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-587-1024x406.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-587-768x304.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-587-600x238.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>Comparison of the G20 project in Hangzhou with the installation progress of this project<\/p>\n\n\n\n<p><strong>2.4<\/strong><\/p>\n\n\n\n<p><strong>How is three parallel construction managed?<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Civil construction is parallel to decoration<\/strong><\/li><\/ul>\n\n\n\n<p><strong>&#8220;Speculative&#8221;<\/strong> method of work <\/p>\n\n\n\n<p>In the face of construction pressure, <strong>seize any opportunity to advance the progress<\/strong> of construction, that is, &#8220;speculation&#8221;;<\/p>\n\n\n\n<p><strong>Taking all possible steps to facilitate progress <\/strong>is &#8220;trickle-by-grab&#8221;.<\/p>\n\n\n\n<p><strong>1, one<\/strong> <strong>of<\/strong> <strong>the &#8220;speculations&#8221;<\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"498\" height=\"244\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-588.png\" alt=\"\" class=\"wp-image-3572\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-588.png 498w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-588-300x147.png 300w\" sizes=\"(max-width: 498px) 100vw, 498px\" \/><\/figure>\n\n\n\n<p>Construction of steel structural partition walls<\/p>\n\n\n\n<p>The original partition wall design scheme is a <strong>masonry wall.<\/strong><\/p>\n\n\n\n<p>Due to the tight schedule, large engineering volume, cold weather, and insufficient supply of external masonry materials, the masonry scheme does not meet the actual demand. All parties worked together, led by the Architectural Design Institute to eventually adopt <strong>the steel structure partition wall scheme.<\/strong><\/p>\n\n\n\n<p>Once the scenario is determined, the project department takes the initiative to work closely together, from the material entry to the installation completed in only 15 days.<\/p>\n\n\n\n<p><strong>2,<\/strong> <strong>&#8220;speculation&#8221;<\/strong> <strong>II<\/strong><\/p>\n\n\n\n<p>Entering the site begins with a large area of tiles<\/p>\n\n\n\n<p>Entering at the end of December, the temperature is not very low, the <strong>original construction order is the top of the wall.<\/strong> <\/p>\n\n\n\n<p>And because of civil ash and mechanical and electrical progress, large-scale construction can not be. The project department decided decisively, <strong>the adjustment plan to lay<\/strong> the ground first, seize the rare opportunity of wet work for the back to win the opportunity.<\/p>\n\n\n\n<p><strong>3,<\/strong> <strong>&#8220;trickle-by-trick&#8221;<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"902\" height=\"229\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-589.png\" alt=\"\" class=\"wp-image-3573\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-589.png 902w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-589-300x76.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-589-768x195.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-589-600x152.png 600w\" sizes=\"(max-width: 902px) 100vw, 902px\" \/><\/figure>\n\n\n\n<p>One layer of mezzanine and all fire stairs <strong>Original design paste paint,<\/strong> due to the average temperature in Qingdao in January -2 to 5 degrees Celsius, taking into account the civil dust cycle and winter construction environmental factors, I recommend that the owners <strong>change<\/strong> the use of dragon <strong>gypsum board<\/strong> instead of <strong>plaster,<\/strong> It is helpful to mechanical and electrical pipe management, reasonable cost, high flatness, greatly shorten the duration.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Electromechanical and decorative parallel<\/strong><\/li><\/ul>\n\n\n\n<p><strong>&#8220;One center, two basic points&#8221;<\/strong> method of work<\/p>\n\n\n\n<p>One &#8220;center&#8221; is the <strong>decorative progress and effect<\/strong> center, and the two &#8220;basic points&#8221; are functional <strong>and secure.<\/strong><\/p>\n\n\n\n<p>For the project is <strong>the decoration unit in the functional practical and safe basis on the overall effect of absolute responsibility,<\/strong> other mechanical and electrical units unconditionally meet the decoration needs.<\/p>\n\n\n\n<p><strong>1, lead<\/strong> <strong>BIM<\/strong> <strong>collision detection, guide the construction<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"934\" height=\"221\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-590.png\" alt=\"\" class=\"wp-image-3574\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-590.png 934w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-590-300x71.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-590-768x182.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-590-600x142.png 600w\" sizes=\"(max-width: 934px) 100vw, 934px\" \/><\/figure>\n\n\n\n<p>Collision detection of ceiling conversion layer and ducts<\/p>\n\n\n\n<p>Due to the tight schedule, when the decoration unit scaffolding is completed, there will be various mechanical and electrical units and decorative units competing for work surface matters.<\/p>\n\n\n\n<p><strong>Decorative units lead the collision detection of electromechanical BIM<\/strong> <strong>models and ceiling conversion layer models<\/strong> in advance and construct according to the model.<\/p>\n\n\n\n<p>All parties who are wrong who change, to ensure that the speed and do not rip.<\/p>\n\n\n\n<p><strong>2, decorative units forced positioning<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"773\" height=\"584\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-591.png\" alt=\"\" class=\"wp-image-3575\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-591.png 773w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-591-300x227.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-591-768x580.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-591-600x453.png 600w\" sizes=\"(max-width: 773px) 100vw, 773px\" \/><\/figure>\n\n\n\n<p>Forced positioning of electromechanical points; <\/p>\n\n\n\n<p>Ensure that all parties point <strong>unified opening<\/strong> to the decorative unit, to ensure the decorative effect.<\/p>\n\n\n\n<p><strong>3, decorative unit surface installation priority<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"432\" height=\"324\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-592.png\" alt=\"\" class=\"wp-image-3576\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-592.png 432w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-592-300x225.png 300w\" sizes=\"(max-width: 432px) 100vw, 432px\" \/><\/figure>\n\n\n\n<p><strong>Everything takes the installation duration of decorative surfaces as a priority.<\/strong><\/p>\n\n\n\n<p>The electromechanical unit shall not affect the surface installation node, shall be coordinated by the head package, and the parties shall sign and confirm <strong>the relevant regional commitments.<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>The front and backfields are parallel<\/strong><\/li><\/ul>\n\n\n\n<p><strong>&#8220;First-line through, finished<\/strong> <strong>construction&#8221;<\/strong> work method <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"643\" height=\"282\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-593.png\" alt=\"\" class=\"wp-image-3577\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-593.png 643w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-593-300x132.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-593-600x263.png 600w\" sizes=\"(max-width: 643px) 100vw, 643px\" \/><\/figure>\n\n\n\n<p>Effect figure<\/p>\n\n\n\n<p><strong>1, determine the axis<\/strong><\/p>\n\n\n\n<p><strong>Three-axis correspondence &#8211;<\/strong> <strong>spindle through<\/strong><\/p>\n\n\n\n<p>According to the design effect, the door axis determines the accuracy of the interior size. So the use of three-dimensional line, three-axis correspondence, the origin start, spindle through, base point extension.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"643\" height=\"282\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-594.png\" alt=\"\" class=\"wp-image-3578\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-594.png 643w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-594-300x132.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-594-600x263.png 600w\" sizes=\"(max-width: 643px) 100vw, 643px\" \/><\/figure>\n\n\n\n<p>Effect figure<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"620\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-595.png\" alt=\"\" class=\"wp-image-3579\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-595.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-595-300x172.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-595-1024x588.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-595-768x441.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-595-600x344.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>Floor plan<\/p>\n\n\n\n<p><strong>2, selected specifications<\/strong><\/p>\n\n\n\n<p>To ensure a perfect design, maximize the size of the material according to the surface <strong>material specifications.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"375\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-596.png\" alt=\"\" class=\"wp-image-3580\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-596.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-596-300x104.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-596-1024x356.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-596-768x267.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-596-600x208.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>This area <strong>the most complex part<\/strong> is the top surface imitation white copper shape stainless steel, select the site priority layout, <strong>short-term whole, long items by shape block.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"473\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-597.png\" alt=\"\" class=\"wp-image-3581\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-597.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-597-300x131.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-597-1024x448.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-597-768x336.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-597-600x263.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>Stainless steel chunks<\/p>\n\n\n\n<p>The hard-packed <strong>seams of<\/strong> the wall correspond to the top surface, and when coming to the door or corner, adjust the plate size appropriately and do not allow for more than or less than <strong>1\/3<\/strong> of the plate size. To avoid quality problems, when placing an order, ensure that the stainless steel pressure hard pack per side is not less than <strong>10mm.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"315\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-598.png\" alt=\"\" class=\"wp-image-3582\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-598.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-598-300x88.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-598-1024x299.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-598-768x224.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-598-600x175.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>Hard-packed chunks<\/p>\n\n\n\n<p><strong>3, optimize the node<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"845\" height=\"704\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-599.png\" alt=\"\" class=\"wp-image-3583\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-599.png 845w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-599-300x250.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-599-768x640.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-599-600x500.png 600w\" sizes=\"(max-width: 845px) 100vw, 845px\" \/><\/figure>\n\n\n\n<p>Kickline optimization before<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"842\" height=\"693\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-600.png\" alt=\"\" class=\"wp-image-3584\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-600.png 842w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-600-300x247.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-600-768x632.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-600-600x494.png 600w\" sizes=\"(max-width: 842px) 100vw, 842px\" \/><\/figure>\n\n\n\n<p>After the kickline is optimized<\/p>\n\n\n\n<p>After node optimization, the transport deformation is eliminated and the installation convenience is accelerated.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1033\" height=\"620\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-601.png\" alt=\"\" class=\"wp-image-3585\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-601.png 1033w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-601-300x180.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-601-1024x615.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-601-768x461.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-601-600x360.png 600w\" sizes=\"(max-width: 1033px) 100vw, 1033px\" \/><\/figure>\n\n\n\n<p>The top-facing molding node is optimized for two parts, with the molding and connecting plates<\/p>\n\n\n\n<p>After the node optimization, the seams are in the molding groove, which eliminates the seams and is more holistic.<\/p>\n\n\n\n<p><strong>4, set the variable to order<\/strong> <\/p>\n\n\n\n<p><strong>The quantitative first, complex process first<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"990\" height=\"572\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-602.png\" alt=\"\" class=\"wp-image-3586\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-602.png 990w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-602-300x173.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-602-768x444.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-602-600x347.png 600w\" sizes=\"(max-width: 990px) 100vw, 990px\" \/><\/figure>\n\n\n\n<p>Top faux white copper stainless steel fixed variable under the order<\/p>\n\n\n\n<p><strong>Find quantitative, quantitative maximization in variables<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"987\" height=\"594\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-603.png\" alt=\"\" class=\"wp-image-3587\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-603.png 987w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-603-300x181.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-603-768x462.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-603-600x361.png 600w\" sizes=\"(max-width: 987px) 100vw, 987px\" \/><\/figure>\n\n\n\n<p><strong>Find quantitative, variable minimized, in variables<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"908\" height=\"565\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-604.png\" alt=\"\" class=\"wp-image-3588\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-604.png 908w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-604-300x187.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-604-768x478.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-604-600x373.png 600w\" sizes=\"(max-width: 908px) 100vw, 908px\" \/><\/figure>\n\n\n\n<p>Closing relationship:<\/p>\n\n\n\n<p><strong>Metal door cover pressure hard bag, first hard package order, and ensure that<\/strong> <strong>the door cover pressure<\/strong> hard bag not <strong>less than<\/strong> <strong>15mm. <\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1056\" height=\"580\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-605.png\" alt=\"\" class=\"wp-image-3589\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-605.png 1056w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-605-300x165.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-605-1024x562.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-605-768x422.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-605-600x330.png 600w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/figure>\n\n\n\n<p><strong>5, the grass-roots modular construction<\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"543\" height=\"724\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-606.png\" alt=\"\" class=\"wp-image-3590\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-606.png 543w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-606-225x300.png 225w\" sizes=\"(max-width: 543px) 100vw, 543px\" \/><\/figure>\n\n\n\n<p>The Wall surface layer pushes<strong> back the grass-roots line,<\/strong> horizontal, vertical steel frame according to the specification spacing molded construction. At the door, ensure that the steel frame is not less than 300MM from the door cover stop.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"480\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-607.png\" alt=\"\" class=\"wp-image-3591\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-607.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-607-300x133.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-607-1024x455.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-607-768x341.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-607-600x267.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>Top surface layer <strong>anti-push conversion layer elevation,<\/strong> horizontal, vertical steel frame according to the specification spacing molded construction.<\/p>\n\n\n\n<p><strong>6, backfield product processing<\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"578\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-608.png\" alt=\"\" class=\"wp-image-3592\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-608.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-608-300x161.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-608-1024x548.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-608-768x411.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-608-600x321.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>Stainless steel rear field product processing<\/p>\n\n\n\n<p><strong>7, assembly installation<\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"983\" height=\"564\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-609.png\" alt=\"\" class=\"wp-image-3593\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-609.png 983w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-609-300x172.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-609-768x441.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-609-600x344.png 600w\" sizes=\"(max-width: 983px) 100vw, 983px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1068\" height=\"517\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-610.png\" alt=\"\" class=\"wp-image-3594\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-610.png 1068w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-610-300x145.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-610-1024x496.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-610-768x372.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-610-600x290.png 600w\" sizes=\"(max-width: 1068px) 100vw, 1068px\" \/><\/figure>\n\n\n\n<p>Finished installation process<\/p>\n\n\n\n<p><strong>8, difficult to change bright spots: (to ultra-high door for example).<\/strong> <\/p>\n\n\n\n<p><strong>1) Optimize the front and rear field ratios:<\/strong><\/p>\n\n\n\n<p>Reduce the construction content of the site, increase the number of backfield productization, modularization.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"718\" height=\"411\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-611.png\" alt=\"\" class=\"wp-image-3595\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-611.png 718w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-611-300x172.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-611-600x343.png 600w\" sizes=\"(max-width: 718px) 100vw, 718px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"573\" height=\"416\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-612.png\" alt=\"\" class=\"wp-image-3596\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-612.png 573w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-612-300x218.png 300w\" sizes=\"(max-width: 573px) 100vw, 573px\" \/><\/figure>\n\n\n\n<p>Red site construction, blue backfield product construction<\/p>\n\n\n\n<p><strong>2) Optimize the process order:<\/strong><\/p>\n\n\n\n<p>The door frame part places an order before the door cover does not delay the installation of the door fan, effectively guarantees the continuity of the wood finish operation, and works of the Concorde construction.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"147\" height=\"243\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-613.png\" alt=\"\" class=\"wp-image-3597\"\/><\/figure>\n\n\n\n<p>(1) door fan fixed steel frame positioning;(2) door sleeve stop to place an order;(3) door cover line field The order is placed under the gauge.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"909\" height=\"398\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-614.png\" alt=\"\" class=\"wp-image-3598\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-614.png 909w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-614-300x131.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-614-768x336.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-614-600x263.png 600w\" sizes=\"(max-width: 909px) 100vw, 909px\" \/><\/figure>\n\n\n\n<p>(1) Door cover port installation (2) Installation door fan (3) door sleeve installation<\/p>\n\n\n\n<p><strong>3) Optimize the installation and construction program:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"458\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-615.png\" alt=\"\" class=\"wp-image-3599\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-615.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-615-300x127.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-615-1024x434.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-615-768x326.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-615-600x254.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>The over-gate installation process<\/p>\n\n\n\n<p>More than three days in advance to do enough to withstand the weight of the copper door concrete pit, copper door weight 900KG, the bottom of the pit should be left about 12mm cement grout layer to ensure sufficient leveling space and grout layer cement strength.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"470\" height=\"341\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-616.png\" alt=\"\" class=\"wp-image-3600\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-616.png 470w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-616-300x218.png 300w\" sizes=\"(max-width: 470px) 100vw, 470px\" \/><\/figure>\n\n\n\n<p>Optimization measures for pre-buried springs<\/p>\n\n\n\n<p><strong>Optimization measures for over-gate installation:<\/strong><\/p>\n\n\n\n<p>Copper door installation is completed under the empty 10mm, above the empty 7mm, copper finished door (with the copper door to form the whole picture) high out of the fan distance is very small, in the lifting process specially equipped with <strong>2<\/strong> <strong>lifting safety personnel,<\/strong> keep an eye on the finished product protection in the lifting link.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"315\" height=\"419\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-617.png\" alt=\"\" class=\"wp-image-3601\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-617.png 315w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-617-226x300.png 226w\" sizes=\"(max-width: 315px) 100vw, 315px\" \/><\/figure>\n\n\n\n<p>Actively listen to the views of the workers master, the use of <b>hoistway<\/b> installation, efficiency festival.<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"627\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-618.png\" alt=\"\" class=\"wp-image-3602\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-618.png 750w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-618-300x251.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-618-600x502.png 600w\" sizes=\"(max-width: 750px) 100vw, 750px\" \/><\/figure>\n\n\n\n<p><strong><em>03<\/em><\/strong><\/p>\n\n\n\n<p><strong>Live reality view<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"442\" height=\"274\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-619.png\" alt=\"\" class=\"wp-image-3603\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-619.png 442w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-619-300x186.png 300w\" sizes=\"(max-width: 442px) 100vw, 442px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>4 Big Job Grabs, Are You Ready for It? Project preempti [&hellip;]<\/p>","protected":false},"author":1,"featured_media":3576,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[64,63,57,59,202],"tags":[],"class_list":["post-3549","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-process-technology","category-project-management","category-project-product","category-restaurant-project","category-schedule-management"],"_links":{"self":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/comments?post=3549"}],"version-history":[{"count":0,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/3549\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media\/3576"}],"wp:attachment":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media?parent=3549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/categories?post=3549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/tags?post=3549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}