{"id":4410,"date":"2021-11-05T09:07:41","date_gmt":"2021-11-05T01:07:41","guid":{"rendered":"https:\/\/epcpmo.com\/?p=4410"},"modified":"2021-11-05T09:07:42","modified_gmt":"2021-11-05T01:07:42","slug":"from-the-beginning-to-the-completion-the-whole-construction-process-of-the-hardcover-room","status":"publish","type":"post","link":"https:\/\/epcpmo.com\/en\/from-the-beginning-to-the-completion-the-whole-construction-process-of-the-hardcover-room\/","title":{"rendered":"From the beginning to the completion, the whole construction process of the hardcover room"},"content":{"rendered":"<h4 class=\"wp-block-heading\"><a id=\"post-4410-activity-name\"><\/a><a id=\"post-4410-img-content\"><\/a><a id=\"post-4410-page-content\"><\/a><a id=\"post-4410-js_article\"><\/a>From start to finish, the hardcover building construction process is revealed.<a id=\"post-4410-js_content\"><\/a><\/h4>\n\n\n\n<p>   We combined with the previous project interior decoration project construction experience, the preparation of the fine decoration project construction <strong>process.<\/strong>  For <strong>hydropower, carpentry, tile, paint, and supporting unit construction methods<\/strong> to be refined, and some nodes with on-site pictures and node diagram key description.  <strong>Let<\/strong> the relevant <strong>management personnel on the custom<\/strong> <strong>installation<\/strong> of a system <strong>of understanding, system ideas. <\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img fetchpriority=\"high\" decoding=\"async\" width=\"704\" height=\"305\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-532.jpeg\" alt=\"\" class=\"wp-image-4412\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-532.jpeg 704w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-532-300x130.jpeg 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-532-600x260.jpeg 600w\" sizes=\"(max-width: 704px) 100vw, 704px\" \/><\/figure>\n\n\n\n<p><strong><em>01<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>Preparation phase<\/strong>\n<\/p>\n\n\n\n<p><strong>1.1 Site standardization<\/strong>\n<\/p>\n\n\n\n<p>   Comply with the construction safety and civilization image management regulations, in the construction site in the appropriate location to correctly post signs and stickers, set up signs, and fire-fighting facilities. <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img decoding=\"async\" width=\"1080\" height=\"427\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1147.png\" alt=\"\" class=\"wp-image-4413\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1147.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1147-300x119.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1147-1024x405.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1147-768x304.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1147-600x237.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Custom hardcover finished product protection dimensions list\n<\/p>\n\n\n\n<p><strong>1.2 On-site preparation<\/strong>\n<\/p>\n\n\n\n<p><strong>On-site:<\/strong>\n<\/p>\n\n\n\n<p>   Whether the original hydropower, electricity, and water are normal, the degree of hydropower is confirmed. Whether there is a water leak under the upper floor; <\/p>\n\n\n\n<p>\n  Whether or not to save and remove the project, if any, determine the demolition project and location (the demolition project must be approved by the property management department). copy documents, customer signatures, project department filings);\n<\/p>\n\n\n\n<p>\n  The water improvement scheme, such as water point and pipeline arrangement, is determined and marked;\n<\/p>\n\n\n\n<p>\n  Go through the start-up procedures, confirm the start time, fill in the on-site delivery slip. \n<\/p>\n\n\n\n<p><strong>Technical bottom:<\/strong>\n<\/p>\n\n\n\n<p>\n  The bottom bit of the cross;\n<\/p>\n\n\n\n<p>\n  The content of the cross-section should be targeted, and the project situation is consistent;\n<\/p>\n\n\n\n<p>\n  The team needs to sign the confirmation;\n<\/p>\n\n\n\n<p>\n  If necessary, provide on-site guidance. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img decoding=\"async\" width=\"1080\" height=\"704\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1148.png\" alt=\"\" class=\"wp-image-4414\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1148.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1148-300x196.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1148-1024x667.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1148-768x501.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1148-600x391.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>1.3<\/strong> <strong>Pre-release line<\/strong>\n<\/p>\n\n\n\n<p>   The &#8220;crosshairs&#8221; of each room are released according to the civil axis, and the &#8220;center control line&#8221; of each room is released according to the drawing requirements.  <strong>Line release work should be done after the original earthen putty is eradicated. <\/strong> <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"632\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1149.png\" alt=\"\" class=\"wp-image-4415\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1149.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1149-300x176.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1149-1024x599.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1149-768x449.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1149-600x351.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>\n  Control line plan model\n<\/p>\n\n\n\n<p>\n  <img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"807\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1150.png\" class=\"wp-image-4416\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1150.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1150-300x224.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1150-1024x765.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1150-768x574.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1150-600x448.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/>\n  <br><strong>1.4 Hydropower point confirmation<\/strong>\n<\/p>\n\n\n\n<p><strong>The distance,<\/strong> quantity confirmation of the inlet, outlet, water meter;\n<\/p>\n\n\n\n<p>   The distance and quantity of gas pipes, exhaust vents, and gas meters are confirmed; <\/p>\n\n\n\n<p>\n  The distance and quantity of switches and sockets are confirmed;\n<\/p>\n\n\n\n<p>   On-site marker pen, fill out the room water and electrical location survey form, on-site deepening designers, and other signature confirmation; <\/p>\n\n\n\n<p>\n  All water and electricity sites must be confirmed by the owner, and make a confirmation record. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1014\" height=\"598\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1151.png\" alt=\"\" class=\"wp-image-4417\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1151.png 1014w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1151-300x177.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1151-768x453.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1151-600x354.png 600w\" sizes=\"(max-width: 1014px) 100vw, 1014px\" \/><\/figure>\n\n\n\n<p><strong><em>02<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>Hydropower phase<\/strong>\n<\/p>\n\n\n\n<p><strong>2.1 Auxiliary material entry<\/strong>\n<\/p>\n\n\n\n<p>   Acceptance of inbound materials, check whether the delivery order number, brand, and the company&#8217;s requirements of auxiliary materials are consistent; Whether the material is damaged.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"609\" height=\"328\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1152.png\" alt=\"\" class=\"wp-image-4418\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1152.png 609w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1152-300x162.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1152-600x323.png 600w\" sizes=\"(max-width: 609px) 100vw, 609px\" \/><\/figure>\n\n\n\n<p><strong>2.2<\/strong> <strong>Hydropower starts<\/strong>\n<\/p>\n\n\n\n<p>   Strong and weak electrical tubes should be color separation installation, respectively, using red, blue PVC tubes to distinguish;  <\/p>\n\n\n\n<p>\n  The parallel spacing between the weak power line and the lighting socket line should not be less than 300mm;\n<\/p>\n\n\n\n<p>\n  When cross laying must be vertical distribution and the same system must not have more than one intersection, strong and weak wires can not be placed in the same pipeline or line slot. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"476\" height=\"322\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1153.png\" alt=\"\" class=\"wp-image-4419\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1153.png 476w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1153-300x203.png 300w\" sizes=\"(max-width: 476px) 100vw, 476px\" \/><\/figure>\n\n\n\n<p><strong>2.3<\/strong> <strong>Hydropower demolition<\/strong>\n<\/p>\n\n\n\n<p>   Wall ground dark tube installation, wall ground groove should be straight, no distortion, slotting horizontal vertical, a wall should not allow the appearance of cross groove<strong>.<\/strong>   It is recommended to use environmental protection professional slotting machine construction.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"661\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1154.png\" alt=\"\" class=\"wp-image-4420\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1154.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1154-300x184.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1154-1024x627.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1154-768x470.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1154-600x367.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>Bullet positioning:<\/strong> According to the construction drawings and hydropower piping scheme in the wall, the top surface of the bullet line marked the groove, hole position, and direction.  <\/p>\n\n\n\n<p><strong>Dark dressing grooves: When <\/strong>the embedded wall is dark, use special tools to cut the grooves.  The groove depth is 15mm larger than the outer diameter of the tube, the groove width ratio is 20 to 30 mm larger than the outer diameter of the tube, and the size of the part of the tube and tube card is appropriately increased.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"967\" height=\"352\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1155.png\" alt=\"\" class=\"wp-image-4421\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1155.png 967w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1155-300x109.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1155-768x280.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1155-600x218.png 600w\" sizes=\"(max-width: 967px) 100vw, 967px\" \/><\/figure>\n\n\n\n<p><strong>2.4<\/strong> <strong>Hydropower covert<\/strong>\n<\/p>\n\n\n\n<p>   When installed at a hot and cold level, the hot water pipe should be above the cold water pipe <strong>(hot and cold<\/strong>); <\/p>\n\n\n\n<p>   When vertical installation (facing the water pipe) is left hot and right <strong>cold,<\/strong> the appliance connection should be left hot right cold;  <\/p>\n\n\n\n<p>   The hot and cold water pipe is parallel to <strong>150 to 200mm, <\/strong>and the horizontal error of the hot and cold water outlet is \u00b15mm <\/p>\n\n\n\n<p>\n  Hot and cold water pipe should be color-coded installation, hot and cold water pipe should be used in <strong>blue, red<\/strong> <strong>PPR<\/strong> <strong>pipe<\/strong> <strong>(or<\/strong> <strong>use color-coded<\/strong> <strong>pipe). <\/strong>\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"409\" height=\"238\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1156.png\" alt=\"\" class=\"wp-image-4422\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1156.png 409w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1156-300x175.png 300w\" sizes=\"(max-width: 409px) 100vw, 409px\" \/><\/figure>\n\n\n\n<p><strong>Pipe fixation:<\/strong> with a special tube card or copper wire to secure the pipe in the pipe tank, the nominal diameter of DN20 pipe fixed spacing is not greater than 800mm;  The end and corner are not greater than 200mm;\n<\/p>\n\n\n\n<p><strong>Pipe laying: <\/strong>water and electricity pipeline ceiling installation and laying, should follow the wire pipe on, water pipe under <strong>(electric underwater), <\/strong>parallel spacing is not less than 200mm.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"904\" height=\"395\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1157.png\" alt=\"\" class=\"wp-image-4423\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1157.png 904w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1157-300x131.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1157-768x336.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1157-600x262.png 600w\" sizes=\"(max-width: 904px) 100vw, 904px\" \/><\/figure>\n\n\n\n<p>\n     P<strong>PR<\/strong> <strong>shower locator:<\/strong> hot and cold water pipe outlet level position must be accurate, installation level, height, depth consistent, no special requirements of the shower room hot and cold outlet spacing 150mm&#8212;;   Double inline wire elbow. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"445\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1158.png\" alt=\"\" class=\"wp-image-4424\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1158.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1158-300x130.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1158-768x334.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1158-600x261.png 600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Second drainage leakage: sinking toilet<\/strong> In the case of long-term use, sewage may leak into the tank, and then accumulate in the deposit box, the tank long-term soaked sewage, may spill into the room, or will leak to the downstairs owner&#8217;s home, can use the secondary drainage practice to add a <strong>deodorant<\/strong> <strong>PVC<\/strong> <strong>same-layer drainage leakage<\/strong> can solve this problem. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"892\" height=\"399\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1159.png\" alt=\"\" class=\"wp-image-4425\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1159.png 892w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1159-300x134.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1159-768x344.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1159-600x268.png 600w\" sizes=\"(max-width: 892px) 100vw, 892px\" \/><\/figure>\n\n\n\n<p><strong>2.5<\/strong> <strong>Underfloor heating installation<\/strong>\n<\/p>\n\n\n\n<p><strong>The <\/strong>shower area does not allow the laying of underfloor heating coils;\n<\/p>\n\n\n\n<p>\n  No joints must be in the same underfloor heating coil;\n<\/p>\n\n\n\n<p>\n  C20 concrete surface edge with 10mm thick extruded insulation plate as a telescopic seam;\n<\/p>\n\n\n\n<p>\n  After the solidification pouring is completed, the maintenance is not less than 7 days. The concrete surface does not allow any material to be nailed in. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"534\" height=\"168\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1160.png\" alt=\"\" class=\"wp-image-4426\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1160.png 534w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1160-300x94.png 300w\" sizes=\"(max-width: 534px) 100vw, 534px\" \/><\/figure>\n\n\n\n<p>\n  Cross-sectional  practice\n<\/p>\n\n\n\n<p><strong><em>03<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>Woodwork oil stage<\/strong>\n<\/p>\n\n\n\n<p><strong>3.1 Bathroom waterproof<\/strong>\n<\/p>\n\n\n\n<p><strong>Shower area waterproof: shower room by <\/strong>shower    Rainshower wall  Waterproof layer without special design requirements, waterproof layer height must not be <strong>less than<\/strong> <strong>1800mm;<\/strong>  The height of the waterproof layer at the <strong>basin<\/strong> is not <strong>less than<\/strong> <strong>1200m.<\/strong>  <\/p>\n\n\n\n<p><strong>Corner waterproof: <\/strong>Non-shower position waterproof height is not less <strong>than<\/strong> <strong>300mm.<\/strong> \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"395\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1161.png\" alt=\"\" class=\"wp-image-4427\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1161.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1161-300x110.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1161-1024x375.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1161-768x281.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1161-600x219.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>Angle treatment:<\/strong> 1:2 cement mortar is smeared with an arc with an arc-shaped iron smear with a diameter of  50mm, and a nonwoven or glass fiber cloth not less than 300mm wide is used as an additional layer, with a vertical joining length of no less than  50mm\u3002 \n<\/p>\n\n\n\n<p><strong>Waterproof brush direction: <\/strong>Waterproof coating brush at least 3 times, each brush direction is <strong>vertical<\/strong> to each other. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"357\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1162.png\" alt=\"\" class=\"wp-image-4428\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1162.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1162-300x99.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1162-1024x338.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1162-768x254.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1162-600x198.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>Ground leak waterproof treatment:<\/strong> ground leak waterproof to do bowl mouth treatment, waterproof must be painted to the inside of the ground leak 10mm. \n<\/p>\n\n\n\n<p><strong>Strengthening treatment: <\/strong>pipe roots and other parts 1:1 Cement mortar for arc angle protection for sealing treatment, and then non-woven or fiberglass cloth as an additional layer, and waterproof enhancement treatment. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"480\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1163.png\" alt=\"\" class=\"wp-image-4429\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1163.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1163-300x133.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1163-1024x455.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1163-768x341.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1163-600x267.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>Dry and wet<\/strong> partition <strong>do<\/strong> Stop <strong>water bar:<\/strong> water stop can be used concrete, galvanized iron, or flat iron to construct, the edge needs to be sealed with cement mortar and waterproof layer tight. If the use of metal water stop belt, bathroom concrete bottom and side need to open a depth of 10mm small groove, water bar installation into the slot, and with waterproof material sealed tight.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"861\" height=\"433\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1164.png\" alt=\"\" class=\"wp-image-4430\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1164.png 861w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1164-300x151.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1164-768x386.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1164-600x302.png 600w\" sizes=\"(max-width: 861px) 100vw, 861px\" \/><\/figure>\n\n\n\n<p><strong>Bathroom threshold stone waterproof:1<\/strong> can be in the lower part of the threshold stone and the wall the same width of the dark concrete water stop belt.  <strong>2,<\/strong> priority installation threshold stone, the use of wet paste method installation, maintenance 3 to 7 days after four weeks with waterproof material blocking.  Then paste the bathroom wall tiles or stone.   <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"848\" height=\"448\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1165.png\" alt=\"\" class=\"wp-image-4431\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1165.png 848w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1165-300x158.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1165-768x406.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1165-600x317.png 600w\" sizes=\"(max-width: 848px) 100vw, 848px\" \/><\/figure>\n\n\n\n<p><strong>3.2<\/strong> <strong>Sinking toilet drainage on the same floor<\/strong>\n<\/p>\n\n\n\n<p>   After the sinking toilet tank test water pass, fill in the sink box <strong>with ceramic grain,<\/strong> and then use 40 thick C20 concrete water to find flat, built-in s4-200 cold pull wire, pouring concrete, with a wipe, maintenance 7 After the day, do waterproof layer and closed water test.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"992\" height=\"355\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1166.png\" alt=\"\" class=\"wp-image-4432\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1166.png 992w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1166-300x107.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1166-768x275.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1166-600x215.png 600w\" sizes=\"(max-width: 992px) 100vw, 992px\" \/><\/figure>\n\n\n\n<p><strong>3.3<\/strong> <strong>Closed water test<\/strong>\n<\/p>\n\n\n\n<p><strong>Closed water test: The water storage depth of the closed water test is not less than <\/strong>20mm above ground, which is suitable for 30 to 50mm and the water storage time is 24 hours.  <\/p>\n\n\n\n<p><strong>Downstairs inspection: <\/strong>in the early stage of the closed water test every 1 hour should be downstairs inspection, the latter 2 hours downstairs inspection, if the water seepage situation is found, should immediately stop the water test, re-water layer perfect treatment. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"983\" height=\"406\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1167.png\" alt=\"\" class=\"wp-image-4433\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1167.png 983w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1167-300x124.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1167-768x317.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1167-600x248.png 600w\" sizes=\"(max-width: 983px) 100vw, 983px\" \/><\/figure>\n\n\n\n<p><strong>3.4<\/strong> <strong>Wall tiles<\/strong>\n<\/p>\n\n\n\n<p><strong>Tile selection: <\/strong>When selecting tiles, you can select two tiles of the same model opposite the front, and then use ordinary copperplate paper folded into the gap, if you can easily enter the tile flatness is defective.  <\/p>\n\n\n\n<p><strong>Sticky front bullet line layout:<\/strong> reserve the position of wall brick press tiles, and use this brick upper line as the wall tile starting layer, can use aluminum alloy ruler as the support brick bezel until the ground is completed and then the bottom layer of the wall, to achieve the purpose of wall brick cover floor tiles.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"276\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1168.png\" alt=\"\" class=\"wp-image-4434\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1168.png 640w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1168-300x129.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1168-600x259.png 600w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p><strong>The health between the fur treatment:<\/strong> clean the waterproof layer of the bathroom, and then use cement, fine sand, glue stirred into a paste uniform roll coating on the wall, hair treatment, enhance the tile bonding force, prevent and control shedding.  <\/p>\n\n\n\n<p><strong>Tile gap control: <\/strong>Tile crevices are uniform and wide. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"276\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1169.png\" alt=\"\" class=\"wp-image-4435\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1169.png 640w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1169-300x129.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1169-600x259.png 600w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p><strong>3.5<\/strong> <strong>Floor tile construction<\/strong>\n<\/p>\n\n\n\n<p><strong>Floor tile paving: <\/strong>floor tile laying, first on-site layout, and then the test tile back scraped 10mm thick cement slurry;   \n<\/p>\n\n\n\n<p><strong>Wall brick press tiles: <\/strong>Finally, a leather wall brick is pressed on top of the floor tiles, to avoid the appearance of seams, affecting the aesthetic.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1013\" height=\"389\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1170.png\" alt=\"\" class=\"wp-image-4436\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1170.png 1013w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1170-300x115.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1170-768x295.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1170-600x230.png 600w\" sizes=\"(max-width: 1013px) 100vw, 1013px\" \/><\/figure>\n\n\n\n<p><strong>Paving slope:<\/strong>  the ground paving to the ground leakage to find slope, slope 5 to 1%. \n<\/p>\n\n\n\n<p><strong>Floor brick closing: <\/strong>in the wall yin and yang corner, the thickness of the kick line should be fully considered when feeding, the completion of the face angle line should cross with yin and yang angle;\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"454\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1171.png\" alt=\"\" class=\"wp-image-4437\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1171.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1171-300x126.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1171-1024x430.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1171-768x323.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1171-600x252.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>3.6<\/strong> <strong>Wall tile paving acceptance<\/strong>\n<\/p>\n\n\n\n<p><strong>Surface flatness acceptance: <\/strong>Use a 2m ruler and stopper to check the surface flatness, with an allowable deviation of 3mm.  <\/p>\n\n\n\n<p><strong>Surface Verticality Acceptance: Check the surface verticality with the <\/strong>Vertical Inspection Ruler, allowing a deviation of 2mm. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"639\" height=\"276\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1172.png\" alt=\"\" class=\"wp-image-4438\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1172.png 639w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1172-300x130.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1172-600x259.png 600w\" sizes=\"(max-width: 639px) 100vw, 639px\" \/><\/figure>\n\n\n\n<p><strong>Yin and Yang angle square acceptance:<\/strong> with right angle detection ruler checks yin and yang angle square positive, allowing deviation of 3mm. <\/p>\n\n\n\n<p><strong>Hydropower warning sticker: tile <\/strong>shop after the completion, to paste the hydropower warning sticker, showing the direction of hydropower lines, to prevent the installation of products when the wrong hole.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"637\" height=\"276\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1173.png\" alt=\"\" class=\"wp-image-4439\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1173.png 637w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1173-300x130.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1173-600x260.png 600w\" sizes=\"(max-width: 637px) 100vw, 637px\" \/><\/figure>\n\n\n\n<p><strong>3.7<\/strong> <strong>window sill mounting<\/strong>\n<\/p>\n\n\n\n<p>   The installation of window sill board is consistent with ordinary tile practice, <strong>both ends should be extended into the wall<\/strong> <strong>20 to 30mm, <\/strong>all yang angles need to chamfer.  The corner closing of the window sill board should be polished on three sides, the lower part of the outside should not have an angular and smooth surface, and the window sill board and the wall end should be smooth and clean.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"969\" height=\"402\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1174.png\" alt=\"\" class=\"wp-image-4440\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1174.png 969w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1174-300x124.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1174-768x319.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1174-600x249.png 600w\" sizes=\"(max-width: 969px) 100vw, 969px\" \/><\/figure>\n\n\n\n<p><strong>3.8<\/strong> <strong>Carpentry started<\/strong>\n<\/p>\n\n\n\n<p><strong>Positioning bullet line: <\/strong>Position the bullet line, determine the keel gear and sling point.  \n<\/p>\n\n\n\n<p><strong>Main keel spacing: <\/strong>The main keel spacing is not greater than 900mm to 1000mm; \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"798\" height=\"352\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1175.png\" alt=\"\" class=\"wp-image-4441\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1175.png 798w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1175-300x132.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1175-768x339.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1175-600x265.png 600w\" sizes=\"(max-width: 798px) 100vw, 798px\" \/><\/figure>\n\n\n\n<p><strong>Sub-keel spacing: <\/strong>The spacing of the para-keel is generally 300 to 400mm, depending on the design.  <\/p>\n\n\n\n<p><strong>Side keel fixation: <\/strong>Side keel fixation should be fixed with wooden screws on the wooden needle or the use of expansion bolts, strictly prohibited use of wooden nails or nails fixed. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"829\" height=\"352\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1176.png\" alt=\"\" class=\"wp-image-4442\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1176.png 829w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1176-300x127.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1176-768x326.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1176-600x255.png 600w\" sizes=\"(max-width: 829px) 100vw, 829px\" \/><\/figure>\n\n\n\n<p><strong>Stretching seam settings:<\/strong> Some of the ceilings with a span greater than 15m and an area greater than 100 m2 should be left in the appropriate place.  \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"614\" height=\"320\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1177.png\" alt=\"\" class=\"wp-image-4443\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1177.png 614w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1177-300x156.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1177-600x313.png 600w\" sizes=\"(max-width: 614px) 100vw, 614px\" \/><\/figure>\n\n\n\n<p><strong>3.9<\/strong> <strong>Carpentry acceptance<\/strong>\n<\/p>\n\n\n\n<p><strong>Gypsum plate seam and nail eye<\/strong> <strong>treatment:1,<\/strong> gypsum board indirect seam can be set up inverted V-type seam, seam width 5to10mm, or reserved 5 to 8mm  Gaps, and uniform;<strong>2,<\/strong> the installation of gypsum board of self-tapping screw nail cap needs to sink into the surface 0.5 to 0.7mm, but do not break the paper;<strong>3,<\/strong>  Nail cap coated with rust-proof paint, putty with rust-proof paint to make up.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"359\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1178.png\" alt=\"\" class=\"wp-image-4444\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1178.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1178-300x100.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1178-1024x340.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1178-768x255.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1178-600x199.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>Gypsum board treatment at corner:<\/strong> Gypsum board ceiling must not be set at the corner gap, yin or yang corner gypsum board must be <strong>L-type<\/strong> set-up, galvanizing special parts reinforcement or other reinforcement measures.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"401\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1179.png\" alt=\"\" class=\"wp-image-4445\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1179.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1179-300x111.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1179-1024x380.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1179-768x285.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1179-600x223.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>3.10<\/strong> Oil works<strong> start<\/strong> <\/p>\n\n\n\n<p><strong>Gypsum board crevice treatment: <\/strong>Gypsum board seams are first sewn with high-strength gypsum, and then attached to anti-cracking paper tape or fiberglass mesh cloth. \n<\/p>\n\n\n\n<p><strong>Wall scraping putty: <\/strong>The number of scratch putty passes is determined by the flatness of the wall, usually three times. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"636\" height=\"276\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1180.png\" alt=\"\" class=\"wp-image-4446\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1180.png 636w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1180-300x130.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1180-600x260.png 600w\" sizes=\"(max-width: 636px) 100vw, 636px\" \/><\/figure>\n\n\n\n<p><strong>Putty grinding:<\/strong> Putty drying with fine sandpaper polishing delicate flat. \n<\/p>\n\n\n\n<p><strong>Brush latex paint: <\/strong>latex paintbrush evenly, generally coated primer once, face paint twice.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"637\" height=\"276\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1181.png\" alt=\"\" class=\"wp-image-4447\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1181.png 637w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1181-300x130.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1181-600x260.png 600w\" sizes=\"(max-width: 637px) 100vw, 637px\" \/><\/figure>\n\n\n\n<p><strong>3.11<\/strong> Oil works<strong> acceptance<\/strong> <\/p>\n\n\n\n<p><strong>Latex paint perception acceptance: <\/strong>the surface layer without pan-alkali, bite color, flow fall, mole, powder, peeling, permeable bottom, sand eye, and brush pattern phenomenon.  <\/p>\n\n\n\n<p><strong>Yin and Yang angle square positive acceptance: <\/strong>Yin and Yang angle square error is not large\u00b1 3mm. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"642\" height=\"277\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1182.png\" alt=\"\" class=\"wp-image-4448\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1182.png 642w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1182-300x129.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1182-600x259.png 600w\" sizes=\"(max-width: 642px) 100vw, 642px\" \/><\/figure>\n\n\n\n<p><strong>Surface flatness acceptance:<\/strong> surface flatness error is not large\u00b1 3mm. \n<\/p>\n\n\n\n<p><strong>Vertical acceptance: <\/strong>The verticality error is not greater than \u00b13mm\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"653\" height=\"277\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1183.png\" alt=\"\" class=\"wp-image-4449\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1183.png 653w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1183-300x127.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1183-600x255.png 600w\" sizes=\"(max-width: 653px) 100vw, 653px\" \/><\/figure>\n\n\n\n<p><strong>3.12<\/strong> <strong>Wallpaper construction<\/strong>\n<\/p>\n\n\n\n<p><strong>Wallpaper paving:1, <\/strong>clean the wall, to ensure that the grass-roots flatness;2, with colorless and non-positioned base film covered in the wall;<strong>3,<\/strong> draw vertical lines;<strong>4,<\/strong> after cutting wallpaper, the use of professional matching wallpaper, Wall cloth paste;<strong>5,<\/strong> flattened with scraper, compacted. The finished product needs to be flat, the seam needs to be tight, yin and yang angle to straight, good perception.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"835\" height=\"551\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1184.png\" alt=\"\" class=\"wp-image-4450\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1184.png 835w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1184-300x198.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1184-768x507.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1184-600x396.png 600w\" sizes=\"(max-width: 835px) 100vw, 835px\" \/><\/figure>\n\n\n\n<p><strong><em>04<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>Installation acceptance phase<\/strong>\n<\/p>\n\n\n\n<p><strong>4.1 Intermediate acceptance<\/strong>\n<\/p>\n\n\n\n<p><strong>Project acceptance personnel on the overall acceptance of the house: <\/strong>to determine the pre-process is standardized following construction standards construction, to ensure that the next finished product one-time installation success  <\/p>\n\n\n\n<p><strong>Project acceptance personnel reference: <\/strong>to determine that the site has installed finished product conditions, to ensure that the product and the site match consistently.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"714\" height=\"306\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1185.png\" alt=\"\" class=\"wp-image-4451\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1185.png 714w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1185-300x129.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1185-600x257.png 600w\" sizes=\"(max-width: 714px) 100vw, 714px\" \/><\/figure>\n\n\n\n<p><strong>Item acceptance personnel to the kitchen and bathroom acceptance:<\/strong> confirm the completion of the hidden pipeline and identification, the completion surface to meet the accepted standards.  <\/p>\n\n\n\n<p><strong>Project acceptance personnel to the bedroom acceptance: whether the <\/strong>ground is flat, the elevation is accurate, the surface is flat, dry; \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"703\" height=\"306\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1186.png\" alt=\"\" class=\"wp-image-4452\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1186.png 703w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1186-300x131.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1186-600x261.png 600w\" sizes=\"(max-width: 703px) 100vw, 703px\" \/><\/figure>\n\n\n\n<p><strong>4.2<\/strong> <strong>Integrated ceiling installation<\/strong>\n<\/p>\n\n\n\n<p><strong>Ceiling defense and positioning, installation<\/strong> <strong>corner line,<\/strong> and <strong>keel:<\/strong> confirm the ceiling height and mark, keel slings are installed securely and leveled,  spacing meets design requirements.  <\/p>\n\n\n\n<p><strong>Installation of buckle board and module equipment: <\/strong>following product installation requirements to install buckle board, lighting modules, heating templates, ventilation modules.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"695\" height=\"302\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1187.png\" alt=\"\" class=\"wp-image-4453\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1187.png 695w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1187-300x130.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1187-600x261.png 600w\" sizes=\"(max-width: 695px) 100vw, 695px\" \/><\/figure>\n\n\n\n<p><strong>Fine repair and commissioning:<\/strong> confirm that the integrated ceiling is not uneven, neat, and beautiful, no obvious gaps, the modules are operating normally, the top is not an obvious resonance phenomenon.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"745\" height=\"312\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1188.png\" alt=\"\" class=\"wp-image-4454\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1188.png 745w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1188-300x126.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1188-600x251.png 600w\" sizes=\"(max-width: 745px) 100vw, 745px\" \/><\/figure>\n\n\n\n<p><strong>4.3<\/strong> <strong>Bathroom installation<\/strong>\n<\/p>\n\n\n\n<p><strong>Toilet installation: <\/strong>the early use of the installation template, but also the structure of the reservation hole to play a dimensional review role. \n<\/p>\n\n\n\n<p><strong>Glue: <\/strong>seat toilet installation template positioning after glue, note: glue position must be in the inside of the contour about 3mm inward, after the installation of the toilet, the surrounding silicone wipe can be. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"940\" height=\"375\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1189.png\" alt=\"\" class=\"wp-image-4455\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1189.png 940w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1189-300x120.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1189-768x306.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1189-600x239.png 600w\" sizes=\"(max-width: 940px) 100vw, 940px\" \/><\/figure>\n\n\n\n<p><strong>Toilet acceptance:<\/strong> whether the appearance of the toilet is intact, the cover is solid, water parts in place, water smooth, no leakage phenomenon, the bottom of the glue flat.  \n<\/p>\n\n\n\n<p><strong>4.4 Under-basin installation<\/strong>\n<\/p>\n\n\n\n<p>   The iron frame of the basin may use the national standard galvanized angle steel, welding place to do anti-rust treatment, or the use of horizontal galvanized square steel fixed holding table basin; <\/p>\n\n\n\n<p>   For ease of removal and maintenance of the basin, the basin is fixed on the fixed components, the fixed components and stone blocks are secured with stainless steel or galvanized bolts, the back of the pad and the back of the countertop bonding area needs to be hair treatment with marble bonding fixed, the basin and fixed components at the connection need to use rubber pads, the basin and the table panel under the mouth with weather-resistant glue seal; <\/p>\n\n\n\n<p>\n  When installing a basin or sink, it is prohibited to install only with cloud stone adhesive, not steel frame or galvanized square steel;\n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"806\" height=\"734\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1190.png\" alt=\"\" class=\"wp-image-4456\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1190.png 806w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1190-300x273.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1190-768x699.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1190-600x546.png 600w\" sizes=\"(max-width: 806px) 100vw, 806px\" \/><\/figure>\n\n\n\n<p><strong>4.5<\/strong> <strong>bath installation<\/strong>\n<\/p>\n\n\n\n<p>\n  The bathtub and stone joint part according to the bathtub edge press stone practice construction, stone countertop according to the size of the bathtub cutting hollow grinding edge factory after the completion of on-site installation, stone and bathtub junction with weather-resistant glue closing;\n<\/p>\n\n\n\n<p>   The stone part around the bathtub is made of a 4&#215;4 galvanized angle steel support frame, and the steel wire mesh cement sand paddle is painted before the stone is installed. The bathtub, which weighs more heavily than recast iron and other materials, is left with stone Access to dark doors, access door specifications, and direction to meet the maintenance requirements;  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"951\" height=\"634\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1191.png\" alt=\"\" class=\"wp-image-4457\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1191.png 951w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1191-300x200.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1191-768x512.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1191-600x400.png 600w\" sizes=\"(max-width: 951px) 100vw, 951px\" \/><\/figure>\n\n\n\n<p><strong>4.6<\/strong> <strong>Cabinet installation<\/strong>\n<\/p>\n\n\n\n<p><strong>Cabinet installation: <\/strong>The kitchen cabinet is installed as a single body, according to the design drawings placed in place, all the inside gaps do not exceed 3mm. \n<\/p>\n\n\n\n<p><strong>Table panel installation: <\/strong>the table panel and cabinet using neutral glass glue concealed connection,  table panel and wall using neutral white glass glue uniform glue connection, the width of the glue is 5to8mm. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"670\" height=\"293\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1192.png\" alt=\"\" class=\"wp-image-4458\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1192.png 670w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1192-300x131.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1192-600x262.png 600w\" sizes=\"(max-width: 670px) 100vw, 670px\" \/><\/figure>\n\n\n\n<p><strong>4.7 Indoor door<\/strong> <strong>installation<\/strong>\n<\/p>\n\n\n\n<p><strong>Indoor door installation:1,<\/strong> ordinary door configuration three 100mm joint, installation position: the first page from the top edge of the door 180mm, the second from the first 350mm, the bottom one from the bottom of the door  180mm;2, the door fan on the hardware, such as hidden closed door, page, keyhole, and another slotting, the opening must be opened before the completion of the factory paint, door sealing edge must not have burst edge, cracking phenomenon.  <\/p>\n\n\n\n<p><strong>Indoor door acceptance:<\/strong> bathroom, kitchen door panel from the threshold stone reserved 6 to 8mm, verticality, diagonal and other requirements.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1018\" height=\"434\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1193.png\" alt=\"\" class=\"wp-image-4459\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1193.png 1018w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1193-300x128.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1193-768x327.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1193-600x256.png 600w\" sizes=\"(max-width: 1018px) 100vw, 1018px\" \/><\/figure>\n\n\n\n<p><strong>4.8<\/strong> <strong>Floor mounting<\/strong>\n<\/p>\n\n\n\n<p><strong>Ground leveling and cleaning: <\/strong>according to the thickness of the floor and measurement of the line-height to do a good job of ground leveling, and maintenance for a week. Before the wooden floor is installed, the moisture content of the ground is measured with a professional measuring instrument, and the moisture content is not higher than 8%.  <\/p>\n\n\n\n<p><strong>Floor pre-layout:<\/strong> the floor should be laid before moisture-proof mats, and then pre-layout, in case of heavy color difference, should be adjusted promptly.  <\/p>\n\n\n\n<p><strong>Floor installation: <\/strong>Consider the deformation of the wooden floor, the expansion seam width between the floor and the wall, and the floor fixture 8-10mm,  and then install the kickline.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"630\" height=\"283\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1194.png\" alt=\"\" class=\"wp-image-4460\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1194.png 630w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1194-300x135.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1194-600x270.png 600w\" sizes=\"(max-width: 630px) 100vw, 630px\" \/><\/figure>\n\n\n\n<p><strong>Groundwood flooring with threshold stone closing practice:<\/strong> <\/p>\n\n\n\n<p><strong>Method 1:<\/strong> The floor and threshold stone junction should be reserved for 3mm floor telescopic seams,  using the same color system as the floor of the anti-hugely filling seam. To prevent the finished product from being contaminated and to control the width and straightness of the glue, the glue needs to be located with the textured paper first.  The threshold stone is angled 3mmand the wooden floor is 3mmlower than the threshold stone.   <\/p>\n\n\n\n<p><strong>Method 2:<\/strong> Wood floor and threshold stone seam treatment, requires wood floor cutting to pay special attention to the cutting angle, pay attention to the straightness of the seam. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1047\" height=\"688\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1195.png\" alt=\"\" class=\"wp-image-4461\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1195.png 1047w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1195-300x197.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1195-1024x673.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1195-768x505.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1195-600x394.png 600w\" sizes=\"(max-width: 1047px) 100vw, 1047px\" \/><\/figure>\n\n\n\n<p>   The method I and Method II  <\/p>\n\n\n\n<p><strong>Kickline installation: <\/strong>kick line and wall can not have a large gap, installation needs to be solid, yin and yang angle to the seam straight.  <\/p>\n\n\n\n<p><strong>Floor acceptance: <\/strong>flat floor, appearance without breakage, floor and kickline no obvious color difference, no obvious installation defects, walking is no noise.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"428\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1196.png\" alt=\"\" class=\"wp-image-4462\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1196.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1196-300x119.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1196-1024x406.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1196-768x304.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1196-600x238.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>4.9<\/strong> <strong>Hydro installation<\/strong>\n<\/p>\n\n\n\n<p><strong>Waterway survey: <\/strong>the waterway is free of leakage, the connection port silk buckle exposed, and wall tiles flush.  <\/p>\n\n\n\n<p><strong>Switch installation: <\/strong>switch upper port from the ground decoration finish surface height of 1.4m, the same indoor installation height is consistent, the switch opening direction is consistent, the phase line must be in the switch, the open and close panel must not be installed behind the door.  <\/p>\n\n\n\n<p><strong>Circuit test: <\/strong>the socket power is normal, the switch commissioning is normal, the lighting line is normal, the other routes are smooth. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"324\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1197.png\" alt=\"\" class=\"wp-image-4463\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1197.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1197-300x90.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1197-1024x307.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1197-768x230.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1197-600x180.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>4.10<\/strong> <strong>Beautification and refinement<\/strong>\n<\/p>\n\n\n\n<p><strong>No scratches in detail: <\/strong>A small number of walls, floor tile scratches were polished during the construction process. \n<\/p>\n\n\n\n<p><strong>Hardware without scratches: <\/strong>in the construction or furniture handling process hardware pieces encountered a small number of scratches, polishing, and polishing.  <\/p>\n\n\n\n<p><strong>House beautification: <\/strong>the overall cleaning of the house, cleaning furniture residue paint or glue, no dust residue. \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"324\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1198.png\" alt=\"\" class=\"wp-image-4464\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1198.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1198-300x90.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1198-1024x307.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1198-768x230.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1198-600x180.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong>4.11<\/strong> <strong>Finished cleaning<\/strong>\n<\/p>\n\n\n\n<p>\n  Cleaning should be done window clear a few net, spotless, especially dead corner out need to strengthen treatment, cleaning order should be rough cleaning &#8211; fine strengthening treatment &#8211; fine cleaning &#8211; final stone crystallization, focus on checking toilet macula, ground leakage inside, light belt, door cover mouth.  \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"481\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1199.png\" alt=\"\" class=\"wp-image-4465\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1199.png 1080w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1199-300x134.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1199-1024x456.png 1024w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1199-768x342.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1199-600x267.png 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p><strong><em>05<\/em><\/strong>\n<\/p>\n\n\n\n<p><strong>The project delivery phase<\/strong>\n<\/p>\n\n\n\n<p><strong>5.1 Check for gaps before delivery<\/strong>\n<\/p>\n\n\n\n<p>   Before delivery carefully check the existing problems in the house, and urge the construction team to repair promptly, with the developer to review the gaps, the site found can be quickly resolved, need to be resolved promptly.  <\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"965\" height=\"645\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1200.png\" alt=\"\" class=\"wp-image-4466\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1200.png 965w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1200-300x201.png 300w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1200-768x513.png 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-1200-600x401.png 600w\" sizes=\"(max-width: 965px) 100vw, 965px\" \/><\/figure>\n\n\n\n<p><strong>5.2<\/strong> <strong>After-sales repair<\/strong>\n<\/p>\n\n\n\n<p>\n  For the classification of the problems raised by the owners To prepare accounts, the project department shall formulate a detailed schedule of completion time to carry out centralized sales maintenance treatment, track the property and housekeeper each household to ensure the completion of quality and quantity within the time, and prevent the owner from sending letters, complaints, claims and even check-out due to improper maintenance or repair. \n<\/p>\n\n\n\n<p><strong>Finally, we use a diagram to summarize the<\/strong> whole process of hardcover <strong>construction:<\/strong> \n<\/p>\n\n\n\n<figure class=\"wp-block-image is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"949\" height=\"2560\" src=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-533-scaled.jpeg\" alt=\"\" class=\"wp-image-4467\" srcset=\"https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-533-scaled.jpeg 949w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-533-111x300.jpeg 111w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-533-380x1024.jpeg 380w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-533-768x2071.jpeg 768w, https:\/\/epcpmo.com\/wp-content\/uploads\/2021\/11\/word-image-533-600x1618.jpeg 600w\" sizes=\"(max-width: 949px) 100vw, 949px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>From start to finish, the hardcover building constructi [&hellip;]<\/p>","protected":false},"author":1,"featured_media":4415,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[58,64,63],"tags":[],"class_list":["post-4410","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hotel-project","category-process-technology","category-project-management"],"_links":{"self":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/4410","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/comments?post=4410"}],"version-history":[{"count":0,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/posts\/4410\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media\/4415"}],"wp:attachment":[{"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/media?parent=4410"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/categories?post=4410"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epcpmo.com\/en\/wp-json\/wp\/v2\/tags?post=4410"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}