EICM Introduce
EICMIt is an engineering consulting project management team in Shenzhen, which provides design management, construction application management, project contracting and material procurement management, construction management and trial operation (completion acceptance) and other services for the owners (investors, developers, employers, construction units) of new construction, reconstruction and expansion engineering construction projects of Sino-foreign enterprises, energy enterprises and industrial enterprises, and assists the owners in the management and control of the quality, safety, schedule, cost, contract and information of the project.
Why do we need to be chosen?
Ensure the safety of the project construction, ensure the quality of the project construction, ensure the project investment control, ensure the project duration target, ensure that the process is in accordance with the law, and ensure the use of the function.
Ensure the safe use of the project, the project is conducive to environmental protection, the project is conducive to energy saving, is conducive to reducing the cost of use, is conducive to extending the life of the project, is conducive to property maintenance, and management.
Engineering management consulting does not usually make decisions itself, but it can bridge the gap between the responsibilities and capabilities of decision-makers. According to the entrustment of decision-makers, consultants make use of their own knowledge, experience, and survey data to provide decision-makers with one or more scientific and reasonable alternative suggestions or schemes, so as to reduce decision-making errors. Decision-makers here can be government agencies at all levels, enterprise leaders, or owners of specific construction projects.
PM companies tend to concentrate a certain number of engineering experts, engineering technicians, and project managers, with a large amount of information, knowledge, experience, and advanced technology, who can at any time according to the needs of owners provide information and technical services, to make up for the lack of owners in engineering technology and information
Design management is the most critical link in the process of project construction. The quality of design work directly determines the final quality level of the project, and also determines the order degree and cost level of the project implementation. Any flaw in the design will be expanded and amplified in the planning, construction, and operation, resulting in greater errors and losses. In view of this, PM company can make use of its own professional experience to effectively control the design scheme, technical scheme, construction drawings, etc., so as to ensure that the project achieves the effective unity of "functional quality, cost, duration, and safety" on the premise of satisfying the use of functions.
It is the duty of every project builder to consciously safeguard the legitimate rights and interests of the state, the collective, and the parties involved. The managers of PM companies are generally professionals engaged in project management all year long. They are familiar with and understand national and local laws, regulations, and working procedures related to construction projects. Therefore, they can effectively prevent and reduce the occurrence of violations of laws, disciplines, and regulations, and ensure the realization of construction projects under the sun.
Due to the one-off nature of construction projects and the numerous complex management tasks involved in their implementation, owners are often unable to manage themselves. PM company and personnel have professional knowledge and experience in this aspect, they are responsible for the management of the project implementation process, can timely discover and deal with the problems, greatly improve the efficiency and effect of the project implementation process management, reduce management errors, so as to ensure the smooth implementation of the project.
With the application of green environmental protection, low carbon, and energy-saving concepts in the construction industry, the connotation of the project cost has changed from the past construction cost to the "full cycle cost" including operation cost and maintenance cost. Therefore, an experienced PM company should not only calculate the construction cost, but also take into account the safety, quality, function, operation cost, maintenance, and repair cost of the project, and strive to achieve "optimal cost in the whole cycle" when estimating the cost target.
Design management, bidding management, construction application management, quality management, schedule management, security management, contract management, information management, pre-settlement management, investment management, etc.
EICM Project Team
Project Organization And Equipment Requirements
In general, the organizational structure of the project management team should meet at least the following requirements (ultimately determined by the delegation model).
1. Abilities required by the manager of project Management Department: have certain technical foundation and business technical ability; Strong organization, coordination and control, analysis and decision-making, expression and strain, social skills.
2. Project submission team: 1 to 2 people, familiar with project management workflow, master application procedures, strong coordination, expression and social skills.
3. Engineering technology group: it shall be composed of technical personnel specialized in architecture, structure, HVAC, water supply and drainage, electrical, intelligent building, etc., with design experience or familiar with design management.
4. Recruitment and contract management team: 2 to 3 people, familiar with the construction process of the project, bidding and contract laws and regulations, strong organization, expression and social skills.
5. Investment control group: composed of civil engineering, plumbing, electrical cost personnel, should have strong coordination and control, analysis and expression ability.
6. Planning and coordination group: 2 members. Should be familiar with engineering construction process, should have strong organization and coordination, strain and control ability.
7. Integrated Administration Group: 2 to 3 people, consisting of data and information management personnel and other personnel. Data and information management personnel should be familiar with the construction process and data management regulations.
Project Covers
Navigation
A recent article
- 新能源 | 别墅空气能与光伏离网组合解决方案技术分析
- 新能源政策 | 什么是新能源大路条、小路条、竞配、纳归、指标、以及指标如何获取?都懂的称的上是“行家”了
- 光充 | 2MW光伏车棚+充电桩(CAD清单、EXCEL计算书和物料表)
- 项目管理 | 当你带项目的时候,遇到某些人不尊重你、轻视你时,不要沟通,不要愤怒,只需……
- 分布式光伏 | 光伏组件横装 vs 竖装:发电量差 8%?90% 的人忽略了这个核心因素!
- 重卡充电站 | 新能源重卡充电站建站流程及投资回报测算
- 重卡充电站 | 新能源重卡充电站15%利用率是生死线,如何实现盈利?
- 储能系统 | 2026年起储能电站可两层布置,禁止地下布局,电池并联成历史?
- 光储充 | 0.6MW光伏 + 7MW/14MWh储能 + 400kW充电桩光储充一体化项目器材清单
- 充电站 | 5种环境下充电桩安装注意事项有哪些?
- 分布式光伏 | 工商业光伏电站并网4类关键技术
- 光储充 | 充电站的投建运营
- 光储充 | 光储充一体化充电站项目设备白名单
- 光储充 | 储能PCS与光伏逆变器,二者有哪些区别?
- 光储充 | 光储充一体化充电站项目洽谈资料清单与要点
- 项目管理 | 项目经理才发现:一个人最大的愚蠢,不是顶撞领导,不是拒绝站队,更不是不懂提升,而是深陷这3个致命误区
- 分布式光伏|项目投运后发现消纳比例低于预期,投资方能否拒付居间费?
- 分布式光伏 | 光伏电站所依托的房屋对外转让,投资者可否向业主索赔?
- 分布式光伏|安装施工期间,台风吹落物砸毁光伏组件,应由哪一方承担损失?
- 分布式光伏 | 以“合同能源管理”模式在商业办公楼屋顶上投资光伏,应如何确定签约主体?
- 分布式光伏 |案例研究: 若用户拒绝在抄表单上签字,投资方单方面制作的抄表单能否作为计算电费的依据?
- 分布式光伏 | 光伏设施安装后,发现屋顶漏水且结构承载力不足,屋顶业主要求解除EMC协议并拆除光伏设施
- 储能电站 | 广东工商业储能项目设计实例
- 光储离网 | 印尼项目:日发电 80-100 度
- 光储离网 | 别墅区:3 套定制化技术方案解析
- 1000kVA变压器可以承受多少kW的用电量?
- 光储充换一体化电站解决方案
- 光伏结构设计 I 轻钢屋面增加光伏,檩条如何加固?
- 生物质热电联产项目开发工作流程
- 电力服务(涉电维护、检测等)收费项目及标准
- 储能电站 | 运营与监管
- 储能电站 | 建设、调试与验收
- 储能电站 | 设计与招标
- 储能电站 | 项目立项与审批
- 储能电站 | 前期规划与可行性研究
- 工程国际 | 东南亚—马来西亚,从图纸到投产
- 工程国际 | 东南亚光储充政策补贴详解
- 当前虚拟电厂的主要盈利模式汇总
- 沙特阿拉伯工作签证办理:流程、材料与注意事项
- 沙特工程项目清关流程与注意事项