EICM Engineering Consulting Management Mode
Design and design phase construction application management
Project contracting and material purchasing management
Project management during the construction process
Project management for complete acceptance and closing phase
EICM engineering consulting management basic work content
Project decision stage (owner preparation)
(1) Project feasibility report; (2) Evaluate the construction project and propose the project implementation plan; (3) Other procedures needed for the decision-making and approval of construction projects.
Work content of the owner: propose project ideas and requirements; Make decisions on a project implementation plan.
Assist the owner to handle planning, construction and other approval procedures.
Responsible for organizing the coordination of the relationship between the local government and management departments of the project, and maintaining or improving the relationship between the project and neighboring units based on the full understanding and acceptance of the relationship between the project and the surrounding units, in order to safeguard the interests of the owners.
Job description of the owner: Responsible for project approval; To cooperate or coordinate together.
Project Design Management
According to the functional requirements and construction objectives of the building proposed by the owner, organize the preparation of the project design task book.
Work content of the owner: put forward functional requirements; To examine and approve the design specification.
(1) Formulate work plans and plans for design bidding; ② To organize the preparation of bidding documents, contract documents and carry out bidding work; ③ Organize the negotiation of the design contract, and assist the owner to sign the design contract with the winning design unit after the approval of the owner.
Work content of the owner: approve the design bidding organization plan; Sign the contract with the winning bidder
① Organize design units to submit professional scheme designs according to the agreed time and requirements in the contract; (2) Organize the scheme review and put forward review opinions, and organize expert meetings when necessary; ③ After summarizing the opinions of all parties and obtaining the approval of the owner, the design company shall be organized to optimize the professional design scheme until the scheme design is recognized by the owner.
Work content of the owner: confirm the design scheme
(1) Organize the selection of the preparation unit of the feasibility study report, and sign the contract with the preparation unit after the approval of the owner; (2) Organize the preparation of feasibility study report according to the determined design scheme; ③ The feasibility study report shall be submitted to the owner for review and modification according to the owner's review opinions, and then submitted to the Owner for approval.
Work content of the owner: determine the unit for compiling the feasibility study report; To approve the feasibility study report
1. Responsible for organizing the compilation of engineering design task book and submitting it to the owner for approval.
Work content of the owner: to approve the design specification
2. Organize and hold regular design meetings, timely organize and solve problems in preliminary/expanded design.
3. Review the preliminary/expanded preliminary design results by stages, check whether the design content meets the functional requirements proposed by the owner, organize the design unit to modify, and report to the owner in writing in time.
Work content of the owner: put forward suggestions for functional review
4. Organize design units to prepare design budget estimates in time and organize review, urge design units to carry out quota design, organize preliminary design and budget estimates to be submitted to the owner for approval, and the preliminary design and budget estimates approved by the owner shall be regarded as the primary investment control target of the project.
The work content of owner: approve preliminary design estimates
5. Organize expert argumentations for important technical schemes, organize economic and technical analysis, put forward decision-making suggestions and submit them to the owner for approval.
Work content of the owner: approval of important technical schemes
1. Responsible for tracking and managing the design progress, and urging timely submission of construction drawings.
2. Organize the joint review of drawings and technical disclosure.
3. Coordinate and deal with design defects, review and deal with design changes, engineering negotiations, etc.
4. Organize design units to review the secondary in-depth design submitted by professional contractors.
5. Organize the design company to provide on-site cooperation services and timely solve on-site problems.
Work content of the owner:
Design stage cost control.
Design quality control.
Design phase schedule control.
Design coordination and information management.
Professional and in-depth design management.
Design units in the construction, completion phase of cooperation.
Work content of the owner:
Contract management
1. Compile contract network diagram and put forward reasonable suggestions on the division of project contract scope to the owner.
Job description of the owner: review the contract planning of the project
2. Organize the preparation or review of various contract texts required by the project.
Job content of the owner: review and approve various contract texts
3. Organize all kinds of contract negotiation and signing.
Job content of the owner: Signing contracts
4. Supervised the implementation of various contracts and managed the whole process of the implementation of contracts.
5. Review claims or counterclaims according to the contract and report to the Owner in time.
6. In case of supplementary adjustment of relevant contracts, responsible for organizing preparation and negotiation of relevant supplementary agreements, and organizing signing of such supplementary agreements after the approval of the owner.
Job content of the owner: Signing the supplementary agreement
7. Timely report the contract management to the owner
Bidding and purchasing management
1. Organize and formulate procurement plans and plans for the project and submit them to the owner for approval.
Job description of the owner: Approve the purchase plan
2. Organize and formulate the procurement procedures of the project.
3. Organize the preparation of procurement (bidding) documents, bill of quantities and control prices, and organize bidding (or selection), bid evaluation and bid clearance.
The owner's job content: review all kinds of bidding documents and control prices
4. Organize the bidding and procurement of supervision, general contracting and professional subcontracting projects, provisional appraisal materials and equipment, accept the supervision and inspection of the Owner, and timely report the bidding situation and results to the Owner.
Job content of the owner: assign the owner's representative to participate in bid evaluation and selection
5. Deal with the problems in the bidding and purchasing process.
6. Timely report the relevant situation of purchasing management to the owner.
Construction preparation management
1. Apply for construction permit.
2. Prepare the construction site and hand it over (including measurement control points, underground pipelines, etc.).
3. Provide water, electricity, transportation and telecommunication facilities that meet the construction needs and hand them over.
4. Provide necessary construction drawings, organize design disclosure and drawing review.
5. Review the construction organization design and overall schedule.
6. Prepare funds according to the contract, review the payment application and report to Party A.
7. Review the quality and safety management, guarantee system and implementation of the construction unit.
8. Prepare the management system and work plan for the construction stage of the construction unit.
9. To examine and approve project supervision plans and inspect the implementation of supervision personnel.
10. Organize and hold the first site meeting and issue the commencement order.
Work content of the owner:
Construction stage management
1. Schedule management during construction.
2. Quality management during construction.
3. Cost management during construction.
4. Contract management during construction.
5. Design and technical management during construction.
6. Safe and civilized management during construction.
7. Organization, coordination and management during construction.
8. Information and document management during construction.
Work content of the owner:
Project management and coordination
1. Responsible for preparing the overall schedule control plan of the project and establishing the schedule management system.
2. Organized the implementation management and supervision of the progress plan, found problems and urged rectification.
3. Responsible for coordinating and managing the work of survey, design, bidding agency, cost consulting, supervision, material suppliers and all contractors (including but not limited to general contractors, professional contractors and subcontractors), and timely reporting the relevant management and coordination work to the Owner.
4. Organize the review of claims or counterclaims related to the construction period, and report to the owner.
Work content of the owner:
Project investment management
1. Responsible for organizing the establishment of investment management system and system suitable for the project.
2. Responsible for organizing the preparation of the general investment control plan of the project and submitting it to the entrusting party for examination and approval.
3. Urge the cost consulting company to timely submit the bill of quantities, bidding control price, etc.
4. Organize the preparation of projects and annual fund use plans to examine and approve annual fund use plans.
5. Review the cost application documents such as quotation, unit price and bill of quantities submitted by the contractors.
6. Review the project progress payment, and report to the owner for appropriating the project progress payment after review.
7. Audit the engineering expenses involved in design change, engineering negotiation, visa and claim, submit audit report, and report to the owner for examination and approval of major change expenses.
8. Review the price of provisional valuation materials and equipment.
9. Examine the project settlement statement of the contractor, and submit the project settlement statement to the owner or the auditor it employs for examination and approval.
Work content of the owner:
Engineering File management
1. Organized the establishment of project archive information management system, timely sorted out and filed various approvals, certificates, all contracts, agreements, design drawings, design changes and engineering negotiations, visas and important sending and receiving documents issued by the government.
2. Organize the supervision and construction units to file and keep the supervision materials and construction materials in time, check and find problems regularly, and request the owners to rectify the work content in time.
3. After the completion of the project, the supervision unit and the construction unit shall collect and compile the completion materials and hand over the project files and electronic files to the Owner as required by the owner after passing the acceptance inspection.
Work content of the owner:
Completion acceptance handover and finishing work
1. Joint project debugging.
2. Urge the supervision unit to organize pre-acceptance and rectification for completion.
3. Cooperate with relevant government departments to carry out special project acceptance.
4. The project is officially completed and accepted.
5. Record the completion and acceptance of engineering projects.
6. Settlement and appraisal of project completion.
7. Handle project handover.
8. Project warranty management.
9. Final accounts and auditing of engineering projects.
Work content of the owner:
Engineering Consulting Management
In order to achieve the project objectives, we plan, organize, coordinate and control a series of activities for the construction cycle of engineering projects by using scientific ideas, procedures and methods, and adopting advanced management techniques and means.
Navigation
Classification of management and technical articles
- A-EICM工程咨询管理文件
- A-EICM工程成本管理
- A-EICM开工前的项目管理
- A-EICM施工阶段的项目管理
- A-EICM竣工验收及收尾项目管理
- A-EICM英文工程技术资料
- A-EICM设计及设计阶段报批管理
- A-EICM项目合同及物资采购管理
- A-EICM项目咨询的组织策划
- A-EICM项目咨询的规划策划
- A-EICM项目投资管理
- A-EPC项目管理
- Apartment decoration project
- Batch fine decoration project
- Computer room project
- Cost management
- Data management
- Deepen the design
- Fire Engineering
- Home renovation project
- Hotel Project
- Large shopping mall project
- Mechanical and Electrical Engineering
- Office project
- PPP project management
- Prefabricated decoration
- Process technology
- Project Design
- Project management
- Project planning
- Project preparation
- Project product
- Property management
- Quality Control
- Restaurant project
- Schedule management
- Special project
- Standardization of fine decoration
- Strong and weak electricity project
- Teaching Building Project
- Uncategorized
- 业主项目管理
- 医院项目管理
- 咨询项目管理
- 安装工程管理
- 安防工程管理
- Engineering intermediation data
- Engineering policies and regulations
- Engineering planning
- Project contract
- 工程项目安全
- Project building materials
- Project bidding
- Submit the project for approval
- Project bidding
- Project construction
- Completion of project
- Engineering project management
- Engineering project organization
- Engineering project design
- Project quality
- Project data
- Project schedule
- Project cost
- Engineering project procurement
- 市政项目管理
- 建筑项目管理
- Digital exhibition hall project
- 施工企业管理
- 施工项目管理
- 暖通项目管理
- 消防项目管理
- 环保项目管理
- 监理项目管理
- 能源项目管理
- 营建项目管理
- 装饰项目管理
A recent article
- 光伏设计流程
- 风电项目设计管理思路和方法
- 境外经贸合作区运营中的劳动用工风险及应对
- 沙特工程项目物流进口要点解析
- 海外市场标前成本控制分析
- 海外投资项目建设管理模式研究
- 国际工程NEC-F合同框架中项目管理的创新实践
- 国际工程项目营地标准化建设与属地化管理融合探索
- CIAC:菲律宾建设工程争议绕不开的解决机构
- 工程国际 | 沙特工程物资清关运输风险与对策
- 孟加拉国电站投资项目电价机制设计与电费结算实践
- 工程国际 | 投标报价外部影响因素分析
- 工程国际 | 房建项目常见延误原因与应对策略
- 工程国际 | 项目五级劳务管理体系建设
- 工程国际|基于项目的方法vs基于产品的方法(八大不同)
- 50种常见的认知偏见
- 工程国际|非洲未来的基建局面已定
- 工程国际|建筑类央企海外业务的“操盘手”们
- 工程国际|“行家一出手,就知有没有”
- 工程国际|对待这种业主,让友谊的归友谊,索赔的归索赔
- 工程国际|向曾国藩学习和外商打交道
- 一文破解风光配储并网难题
- 光伏电站运维应该遵循哪些安全规范?
- 国际工程|想做管理先学财务(一)
- 工程国际|管好外籍员工才是最有效的“本土化”
- 工程国际|价格最低也不能中标的背后
- 工程国际|从一个巴西发电项目的获取过程谈国际市场里be humble的商业伦理
- 工程国际|一个海外项目Min的国内派遣人员配置
- 工程国际|国际项目中总包商与设计分包商
- 工程国际|国际项目中总包商与设备供应商
- 工程国际|国际项目中总包商与施工分包商
- 工程国际 | 为什么中国公司做不好国际工程咨询
- 工程国际|合同就是战略
- 工程国际|项目管理者眼里的关键风险领域
- 工程国际|中国工程师出海有成本优势吗?
- 工程国际|不同类型公司面对中东发电项目上的能力比较
- 工程国际|驻外人员的派遣管理应当注意些什么?
- 工程国际|掌握项目监控的综合指南
- 工程国际|设计管理(Engineering Management)流程纲要
- 工程国际|说说项目管理中的“阶段门(stage gate)”管理
- 工程国际|从项目管理理论的变迁的看项目管理的重心
- 工程国际|国际项目的承包商文档管理员须知
- 工程国际|那些被重新定义的工程词汇表
- 工程国际|Build to Delivery:EPC大型项目中的分专业施工排序
- 新能源光伏项目工程建设关键节点以及建设单位质量监督检查的内容及要求
- 新能源光伏项目光伏发电单元启动前(含集电线路)工程实体质量监督检查的内容及要求
- 新能源项目居间(中介)服务法律风险探析
- 能源纠纷 | 风电项目“路条费”收取路径及法律风险
- 揭秘,央、国企是如何玩转的居间?怎么走账的?
- 从分布式光伏的视角学习虚拟电厂相关政策
- 光伏发电站施工规范
- 新能源光伏电气设计
- 储能收益测算工具………
- 企业配储案例分析………
- 储能投资人必看:什么样的企业才是储能项目的”良配”?
- 分时电价与偏差考核新规解读
- 工程审计审什么?看完你就全明白!
- 掌握安全管理十懂九会、八查七控、六严五责、四不三违、二制一线
- 风电项目现场主要风险点有哪些?
- 新能源风力发电场常用术语及定义