Project 1 Property Takeover Acceptance
Section 1 Key Interpretations
Point 01:Train engineering personnel who take part in the acceptance
Point 02:Engineering professionals should enter the site early
Point 03:Acceptance tools and materials should be fully prepared
Point 04:The handover and acceptance of information should not be taken lightly
Point 05:The problems identified by the early intervention should be the focus of the acceptance
Point 06:It is important to insist on qualifying one to take over one
Point 07:Nonconformity issues should be dealt with in a timely manner
Point 08:The acceptance of the outstanding construction must be signed legal documents
Point 09:Protect the finished product of the facility before entering the group after acceptance
Point 10:The end of the warranty period should be clearly filled in
Section II Workflow
Process 01:Property detail quality inspection workflow
– Process 02:Physical part acceptance process
Process 03:The data section is handed over to the workflow
Section III Job documents (take over acceptance).
Document 01:Property Details Inspection Management Operations Guidelines
Document 02:Property Engineering Details Quality Inspection Program
File 03:Notice of quality correction
File 04:Quality Issues Record Form
File 05:Central air conditioning system quality checklist
File 06:Outdoor companion quality checklist
File 07:Water pipe stress test quality checklist
File 08:Gas closure test quality checklist
File 09:Roof part quality checklist
File 10:Granite Ground Quality Checklist
File 11:Paint Quality Checklist for Process colors
Document 12:Quality Checklist for Greening Trees Planting Project
Section 4 Troubleshooting
Question 01:What conditions must be met for property acceptance?
Question 02:What should be rejected for acceptance
Question 03:What technical information should the developer be required to provide when taking over acceptance
Question 04:Acceptance should require the contractor to provide what operation and maintenance manual
Question 05:What are the methods for property engineering to undertake inspection?
Question 06:What are the causes of the quality problems of property projects?
Question 07:How to deal with the problems found in undertaking inspections
Q08:Who is responsible for repairs after the warranty expires
Item 2 Occupancy decoration management
Section 1 Key Interpretations
Point 01:To clarify the engineering personnel’s responsibility for the inspection of the house
Point 02:To prepare the inspection material
Point 03:Timely resolution of the owners in the acceptance of the issue
Point 04:Anticipate possible situations in the house and respond positively
Point 05:Do a good job of engineering warranty management
Point 06:To review the decoration drawings
Point 07:To strengthen the management of decoration materials supplies
Point 08:The renovation construction process should be monitored
Point 09:Regular inspection of the renovation site
Point 10:To prevent illegal decoration
Point 11:Renovation violations are dealt with in a timely manner
Point 12:Careful acceptance, no hidden dangers
Point 13:Remind the owner to eliminate indoor odors at the end
Section 2 Job flow
Process 01:Owner-owned property maintenance process
— Process 02:Common equipment Facility maintenance process
Process 03:Owner renovation approval process
Section III Job file
File 01:During the new building into the group inspection work specifications
Document 02:Engineering Department decoration inspection regulations
Document 03: House inspection submissions
Document 04:Building handover registration form
Document 05:House (indoor) acceptance handover form
File 06:House Repair Record Sheet
File 07:Home Repair Notice
File 08: House Repair Reminder
File 09:Renovation Commitment
File 10:Responsibility for Fire Prevention
File 11:Temporary Fire Application Form
Document 12:Application form for temporary electricity plan
Document 13:Application form for temporary water plan
Document 14:Renovation construction permit
File 15:Renovation site inspection record
File 16:Interior decoration violation record form
Document 17:House (indoor) decoration acceptance form
Section 4 Troubleshooting
Question 01: What is the focus of the house inspector during the joining period?
Question 02:How to do a good job of engineering warranty management
Question 03:How to understand the owner’s true intention of decoration
Question 04:What formalities should the decoration unit go to the engineering department?
Question 05:How to manage the construction of water and electric lines
Question 06:How to prevent the structural transformation of the owner
Question 07:What advice should be made for the owner’s flooring and floor tile laying
Question 08:How to manage the construction of the owner’s sewer pipe and flue
Question 09:How to manage the owner’s carpentry construction
Question 10:How to manage the owner’s paint construction
Question 11:What are the contents of the second decoration inspection?
Project 3 Daily maintenance of facilities and equipment
Section 1 Key Interpretations
Point 01:Establish a facility ledger
Point 02:Develop a reasonable operating plan
Point 03:Provide a good operating environment
Point 04:Establish the necessary rules and regulations
Point 05:Equipped with qualified operations managers
Point 06:Clarify the technical responsibilities of individual professionals
Point 07:Do a good job of maintaining the system
Point 08:Strengthen the state management of facility equipment
Section II Workflow
Process 01:Infrastructure and work environment management processes
Process 02:Normal maintenance of the equipment
Process 03:Equipment emergency repair process
Process 04:Electrical and mechanical equipment management process
Process 05:Fire alarm signal processing process
Process 06:Elevator troubleshooting process
Process 07:Constant pressure variable frequency living water supply system operating process
Process 08:Low-voltage power distribution equipment repair and maintenance process
Section III Job file
Document 01:Regulations on the Management of Electrical and Mechanical Equipment Facilities
File 02:Power distribution room operation management regulations
File 03:Emergency generator set operation management regulations
File 04:Elevator (ladder) operation management regulations
File 05:Central air conditioning operation management regulations
File 06:Fire linkage system operating procedures
File 07:Pump Operation Regulations
File 08:Equipment registration form
Document 09:Approval form for maintenance of electrical and mechanical equipment facilities
File 10:Action ticket
File 11:Power distribution room run inspection records
File 12:Power distribution equipment operation record
File 13:Power distribution room inspection maintenance record sheet
File 14: Electric room fault record table
File 15:Emergency generator operation record
File 16:Emergency generator inspection records
File 17:Generator set fault record
File 18:Generator maintenance record sheet
File 19:Elevator Run Inspection Record
File 20:Elevator Fault Handling Record Form
File 21:Elevator maintenance record sheet
File 22:Fire linkage system inspection records
File 23:Fire linkage system failure (or alarm) processing record sheet
File 24:Pump room operation inspection record
File 25:Pump fault handling record sheet
File 26:Water pump room maintenance record
Document 27:Parts replacement and equipment large, medium repair plan
File 28:Device Tour Record Sheet
Section 4 Troubleshooting
Q01:What are the requirements for filling out the account of property equipment and facilities?
Q02:How to manage the account of property equipment and facilities
Q03:How to determine the shutdown plan for facility equipment
Question 04:Determine what issues to consider when starting a device startup plan
Question 05:Which contingency plans should be developed?
Question 06:How to troubleshoot and coordinate facility equipment
Q07:How to implement the facility equipment maintenance plan
Project IV House body maintenance management
Section 1 Key Interpretations
Point 01:Do a good job of safety inspection of the house under management
Point 02:Sporadic conservation should be taken seriously
Point 03:Planned maintenance should be carried out on a predetermined period
Point 04:Establish a housing inspection system and a reporting system
Point 05:Do a good job of housing survey and identification work
Point 06: House damage rating
Point 07:The management of dangerous housing should be strengthened
Section II Workflow
Process 01:The owner’s home for their own use and facilities equipment repair (warranty period) process
Process 02:Owner’s home for their own use and facilities and equipment repair (out-of-warranty) process
Process 03:Home commons and utility equipment reporting (off-warranty) process
Process 04:The process of reporting for repair (warranty period) of facilities and equipment in common parts of the house and public areas
Process 05:The renovation process for the main house facility
Section III Job file
Document 01:Housing maintenance regulations
File 02:House Body Maintenance Management Plan and Implementation Plan
Document 03: House damage rating Assessment implementation management measures
File 04:(Large) repair schedule in the house
File 05:Daily checklist of common parts of the house body
File 06:Daily checklist for shared facility equipment
File 07:Sporadic minor repair records of housing facilities
File 08:Home Facility Maintenance Record Form
Document 09:Maintenance Fund Use Approval Form
File 10:Report form on the use of the Housing Body Maintenance Fund
File 11:Housing Body Maintenance Fund Account
File 12:Houses Are Divided Into Damage Ratings
File 13: House Damage Level Summary
File 14:Company Home Damage Rating Summary
File 15:House Integrity Statistics Table
Section 4 Troubleshooting
Question 01:House maintenance management can be divided into several stages of work
Question 02:How to collect minor repair maintenance items
Q03:How to prepare a housing maintenance plan
Question 04:How to implement the housing maintenance task
Question 05:How to do a good job of foundation maintenance
Question 06:How to do a good job in the maintenance of the floor works
Question 07:How to do a good job in the maintenance of wall countertops and ceiling works
Question 08:How to do a good job in the maintenance of doors and windows projects
Question 09:How to do a good job of roofing maintenance
Question 10:How to do a good job in the maintenance and management of ventilation ducts
Question 11:How to calculate the rate of house integrity, risk rate
Question 12: What should be done to rate the damage to the house?
Question 13:How to organize and carry out the house survey
Question 14:How to do a good job of the housing damage level of the summary statistics
Question 15:How to control the quality of the house damage rating
Item 5 Daily maintenance services
Section 1 Key Interpretations
Point 01:Schedule the owner’s daily maintenance
Point 02:Develop a commitment to repair services
Point 03:Clarify repair service procedures and basic requirements
Point 04:Establish a system of three inspections and three visits
Section II Workflow
Process 01:Engineering repair process
Process 02:Daily maintenance workflow
Process 03:Repair the reception language process
Process 04:On-site repair language process
Section III Job file
File 01:Repair service commitment
File 02:The operating requirements for the service order
File 03:Customer Repair Service Management Regulations
File 04:Public service procedures
Document 05:Inspection of the repair process
File 06:Repair service standards
Document 07:Owners report for registration
File 08:Repair business dispatch
File 09:On-site repair record sheet
Document 10:Engineering Paid Service Registration Form
File 11: Zero Repair Timely Rate Statistics Table
Document 12:Public Maintenance Registration Form of the Ministry of Engineering
Section 4 Troubleshooting
Q01:How to get equipment repair information
Question 02:How to repair walls and roofs (plasterboard base).
Q03:How to replace floor or wall tiles, tiles
Q04:How to replace the exterior wall, ground mosaic
Question 05:How to plug holes in the basement wall
Question 06:How to repair damaged sidewalks and driveways
Question 07:How to repair cracked walls and floors
Issue 08:How to fix a broken step
Question 09:How to patch the plaster layer
Question 10:How to repair the seepage wall
Q11:How to repair a roofing pool (or water tank).
Question 12:How roofing leaks (rigid roofing).
Q13:How to repair doors and windows
Q14:How to change the lock (wooden door, iron door).
Q15:How to troubleshoot the power distribution room switch
Question 16:What to do without electricity in a household
Item 6 Energy saving and consumption reduction management
Project 7 Departmental affairs communication and coordination