EICM Introduce
EICMIs engineering consulting management companies (hereinafter referred to as PM company), for the enterprises, commercial enterprises and industrial enterprises in the building, rebuilding and reconstruction engineering construction project owners, investors, developers, the developer, the construction unit) provide bidding agent, design management, procurement management, construction management and commissioning (completion acceptance), and other services, Assist the owner to manage and control the quality, safety, schedule, cost, contract and information of the project.
Why do we need to be chosen?
Ensure the safety of the project construction, ensure the quality of the project construction, ensure the project investment control, ensure the project duration target, ensure that the process is in accordance with the law, and ensure the use of the function.
Ensure the safe use of the project, the project is conducive to environmental protection, the project is conducive to energy saving, is conducive to reducing the cost of use, is conducive to extending the life of the project, is conducive to property maintenance, and management.
Engineering management consulting does not usually make decisions itself, but it can bridge the gap between the responsibilities and capabilities of decision-makers. According to the entrustment of decision-makers, consultants make use of their own knowledge, experience, and survey data to provide decision-makers with one or more scientific and reasonable alternative suggestions or schemes, so as to reduce decision-making errors. Decision-makers here can be government agencies at all levels, enterprise leaders, or owners of specific construction projects.
PM companies tend to concentrate a certain number of engineering experts, engineering technicians, and project managers, with a large amount of information, knowledge, experience, and advanced technology, who can at any time according to the needs of owners provide information and technical services, to make up for the lack of owners in engineering technology and information
Design management is the most critical link in the process of project construction. The quality of design work directly determines the final quality level of the project, and also determines the order degree and cost level of the project implementation. Any flaw in the design will be expanded and amplified in the planning, construction, and operation, resulting in greater errors and losses. In view of this, PM company can make use of its own professional experience to effectively control the design scheme, technical scheme, construction drawings, etc., so as to ensure that the project achieves the effective unity of "functional quality, cost, duration, and safety" on the premise of satisfying the use of functions.
It is the duty of every project builder to consciously safeguard the legitimate rights and interests of the state, the collective, and the parties involved. The managers of PM companies are generally professionals engaged in project management all year long. They are familiar with and understand national and local laws, regulations, and working procedures related to construction projects. Therefore, they can effectively prevent and reduce the occurrence of violations of laws, disciplines, and regulations, and ensure the realization of construction projects under the sun.
Due to the one-off nature of construction projects and the numerous complex management tasks involved in their implementation, owners are often unable to manage themselves. PM company and personnel have professional knowledge and experience in this aspect, they are responsible for the management of the project implementation process, can timely discover and deal with the problems, greatly improve the efficiency and effect of the project implementation process management, reduce management errors, so as to ensure the smooth implementation of the project.
With the application of green environmental protection, low carbon, and energy-saving concepts in the construction industry, the connotation of the project cost has changed from the past construction cost to the "full cycle cost" including operation cost and maintenance cost. Therefore, an experienced PM company should not only calculate the construction cost, but also take into account the safety, quality, function, operation cost, maintenance, and repair cost of the project, and strive to achieve "optimal cost in the whole cycle" when estimating the cost target.
Design management, bidding management, construction application management, quality management, schedule management, security management, contract management, information management, pre-settlement management, investment management, etc.
EICM Project Team
Project Organization And Equipment Requirements
In general, the organizational structure of the project management team should meet at least the following requirements (ultimately determined by the delegation model).
1. Abilities required by the manager of project Management Department: have certain technical foundation and business technical ability; Strong organization, coordination and control, analysis and decision-making, expression and strain, social skills.
2. Project submission team: 1 to 2 people, familiar with project management workflow, master application procedures, strong coordination, expression and social skills.
3. Engineering technology group: it shall be composed of technical personnel specialized in architecture, structure, HVAC, water supply and drainage, electrical, intelligent building, etc., with design experience or familiar with design management.
4. Recruitment and contract management team: 2 to 3 people, familiar with the construction process of the project, bidding and contract laws and regulations, strong organization, expression and social skills.
5. Investment control group: composed of civil engineering, plumbing, electrical cost personnel, should have strong coordination and control, analysis and expression ability.
6. Planning and coordination group: 2 members. Should be familiar with engineering construction process, should have strong organization and coordination, strain and control ability.
7. Integrated Administration Group: 2 to 3 people, consisting of data and information management personnel and other personnel. Data and information management personnel should be familiar with the construction process and data management regulations.
Project Covers
Navigation
A recent article
- 工商业光伏:为何大多数业主偏爱自投?
- 工商业光伏验收及并网流程及注意事项
- 工商业分布式光伏电站项目施工环节的质量控制
- 工商业光伏电站运维步骤、难点与人员培养
- 工商业光伏的屋顶踏勘及承载力核算
- 工商业光伏发电备案、电网接入、施工与运维
- 工商业光伏运维与检修
- 从头规划:工商业光伏电站设计手册
- 工商业光伏施工的‘品控秘籍’
- 分布式光伏装机量如何估算?
- 工商业光伏成本控制,这些信息你掌握了吗?
- MW与MWh是用来表示电池储能系统的什么参数,各表示什么意义,它们有什么联系?
- 项目管理岗/项目开发岗/组件销售岗
- 储能系统集成、结构工程、后端软件、电气、方案工程师
- 储能电气系统工程师、解决方案/售前技术支持、产品经理
- 项目经理、电气工程师、项目开发
- Electrical Engineer
- 土建设计工程师、电气系统工程师、工程项目经理、设计工程师
- 市场经理、储能结构工程师、热仿真工程师、失效分析工程师
- 电站值班员
- 副总工程师、新能源造价工程师、投资工程师、运营工程师
- 光伏工程师(设计)
- 储能系统新建项目施工方案
- 光伏发电工程设计造价参考指标
- 精准投标攻略:解析建筑工程投标中的措施项目清单报价
- 机电安装项目招投标中:存在哪些问题?如何避坑与应对策略?
- 机电安装施工过程中的成本控制要点有哪些?
- 光伏项目运维管理手册指南
- 光伏项目管理指导手册 – 运维
- 光伏项目管理指导手册 – 验收