The whole process control of the decoration project construction of the hotel guest room model room(2)

Hotel model room decoration project, from 0 to 100 full process summary

2, backfield tracking

We should closely follow the production progress and processing quality of the factory, and try to solve the problems in the backyard process promptly, not passively waiting for the arrival of products. When problems arise, the quality will be compromised.

3, technical bottom form

03

The “medium-term” phase of the project

3.1

Safety (full participation)

3.2

Mutual inspection

After the completion of the grass-roots construction, for the construction situation invited other project departments to carry out mutual inspection, the follow-up surface construction put forward valuable advice.

Base material ordering process table

3.3

“50” summary

04

The “late” phase of the project

4.1

Grass-roots quality inspection

  • Sealing plate base leveling checklist
  • Ceiling checklist
  • Pre-release line confirmation
  • Keel concealed checklist

4.2

Surface quality control

Based on the experience of previous projects, preventive measures are put forward for the most problematic problems to avoid the recurrence of similar problems:

  • Stone color difference, cracks. Before the stone paving, according to the layout pre-arrangement, color difference is serious, broken is strictly prohibited to spread.
  • Wallpaper to the pattern, glue marks. Not easy to pattern or gap obvious wallpaper to avoid selection, construction in strict accordance with the bottom of the construction, paving methods, materials fully consider whether there is offset printing after construction, first try to paste, no problem can be a large area of the paste.
  • Stone table installation, hand washing table installation consider the solid stone, under the table with the whole grass-roots board, to ensure that the stone force is uniform, stone table light lift light, to ensure the integrity of the table, broken is strictly prohibited installation, strictly prohibited stampede.
  • Paint, latex paint cracking, wood finish installation to avoid collisions, light put, surface layer is strictly prohibited to use gun nails, easy to crack the part, processing for grass-roots reinforcement, to avoid cracking surface. Latex paint easy to crack the part, grass-roots focus reinforcement, such as: ceiling corner, two materials, such as the junction surface.

4.3

Critical node control

1, waterproof control

2, the wood finish installation control

  • According to the design drawings and site size to deepen, and then according to the deepening drawings for on-site line check, check correctly before placing an order.
  • Installation should be carried out according to the factory number, installation should be completed in time for repair and packaging protection.

3, stone control

  • In order to ensure quality and decorative effect, stone processing needs to go to the manufacturers to see the big board.
  • Stone factory must be test rowed and then numbered boxing, paving is also to be pre-arranged and then spread.

4, wallpaper, latex paint control

  • Wallpaper: before the construction of the wall layout, and then test paste, in order to control the construction process, materials each size, quantity and loss.
  • Latex paint: the top surface must first do a model, set the construction quality standards, latex paint must be sprayed the last two times.

05

The Project “Late Summary” phase

5.1

Surface construction bottom

5.2

Progress, closing schedule checklist

The material has not been tracked, implemented to the day, who to find, where the material, the degree of processing. For suppliers in place, can be on time quality and quantity of materials to the site to consider checkout priority, warranty tailings reduced.

5.3

Safety finished product protection

  • On-site construction and handling: all finished yang angle protection, tools are strictly prohibited on the finished surface, iron ladder is strictly prohibited to enter, into the finished ground area must be set shoes (custom cloth shoes set).
  • Post-cutting area: All cuts are in the area specified by the project department.

Finished product protection (productized packaging eight-step zone)

5.4

Item mutual inspection, the surface layer

After the completion of the surface layer, the construction of the surface layer invited other project departments to check each other, for the overall effect of the project, process details, put forward valuable advice, so that our department on the details of continuous improvement, the perception of the effect to a higher level.

5.5

Summary of the stages

  • Strict control of key processes;
  • Grass-roots to surface-level construction to do a good job of handover inspection;
  • Pay attention to the protection of the finished product
  • The cross-section of the speciality of the highly targeted surface layer and the special person of the construction of valuable materials;
  • A summary of the key closings and practices of the construction process (stone, furniture, wallpaper, latex paint);
  • Overall summary (pre-master grasp, process monitoring, focus finishing)

06

The project “close” phase

6.1

The project is completed

  • After the completion of the project, the completion drawings within a month of finishing, the completion of the information in accordance with the large sub-items are bound into a book, with the completion of the map together with the company.
  • Project cost (labor, materials) within one month of the audit completed to send to internal audit.

6.2

The final accounts are sent for trial

1, the final accounts are prepared and sent to trial

  • Before completion by the project manager, budget staff focused on the owner has not signed the visa, according to the daily visa issue list to check whether the visa is complete;
  • Budgeters begin to measure workload and other required projects;
  • Collect all the information required for the final accounts and establish the relevant information completion time and responsible person to ensure that the project is submitted for review within 2 months of completion as agreed in the contract.

2, completed an internal audit

  • Budgeters and warehouses work together to sort out all material usage, check and sign with suppliers, and submit project managers to settle and send internal audits in accordance with the contract; And control the audit rate, in line with regional requirements;
  • The same team confirms labor costs and controls the audit rate, in line with regional requirements.

3, site inspection

  • Prevention and control of quality general diseases.
  • Control of the flatness, verticality, and squareness of the yin and yang angle of the wall.
  • Quality problems on site to be tracked.
  • Tracking checks at the bottom of the technology.
  • Quality inspection of finished product protection.
  • The improvement of comprehensive quality.

4, data collation

  • Integration design cross-over problem.
  • A list of missing drawings. (Communicate with the designer, divide the drawing work, agree on the completion time of the supplementary drawing)
  • The grass-roots approach of various surface materials in the chart, as well as the lack of grass-roots areas, and the project department jointly agreed on the grass-roots optimization and business plan. (The grass-roots optimization scheme is related to the form of signing the contract)
  • Identify key areas and difficult areas for project construction.
  • Agree with the project department on the model segment and the large sample production list.

High-end hotel project for pre-planning, the overall project fine control requirements are higher, and above we summarized the five-star hotel model room 0-100 control points can be very good for the hotel standardized management and construction to provide a reference.

△Disclaimer:

Some of the above pictures and information are from the Internet, and the copyright belongs to the original author and his company; this article is for study and research purposes only and cannot be used for commercial purposes. If this article infringes your rights, please contact us to delete; some articles The original author could not be contacted due to various reasons during the push. If copyright issues are involved, the original author is kindly requested to contact us and deal with it immediately.